Langues:
FOURNISSEURS

Appels d'Offres Ouverts

Open Tenders

#

Contract Application

Contract Name

Description

Category

Posting Date

1

32549

KTC MILL EXPERT CONTROL SYSTEMS

KTC has 7 primary mills and 6 ball mills - each mill requires an expert control system to optimize both milling throughput and grinding performance.

 

---------------------

 

KTC dispose de 7 broyeurs primaires et de 6 broyeurs à boulets - chaque broyeur nécessite un système de contrôle expert pour optimiser à la fois le débit de broyage et les performances de broyage

 

18-Sep

2

32772

Imports and Exports Review Project

KCC is subject to periodic audit missions throughout the year by public institutions overseeing their sector of activity, such as the Central Bank of Congo, the DGRAD, DGDA, the Ministry of Foreign Trade, etc. Ensuring compliance in operations is paramount to maintaining a company's economic stability, with internal and external assessments as means to mitigate the operational and regulatory risks related to non-compliance with the laws in force.

 

---------------------

 

KCC est soumise à des missions d'audit périodiques tout au long de l'année par les institutions publiques supervisant leur secteur d'activité, telles que la Banque Centrale du Congo, la DGRAD, la DGDA, le Ministère du Commerce Extérieur, etc. Assurer la conformité des opérations est primordial pour maintenir la stabilité économique d'une entreprise, avec des évaluations internes et externes comme moyen d'atténuer les risques opérationnels et réglementaires liés au non-respect des lois en vigueur.

 

18-Sep

3

32777

Sulphides Processing Study Long Term Processing

Kamoto Copper Company (KCC) is in the process of conducting a study to address the increase in sulphide ore feed to the plant, mostly being mine from the open pits. The current operation consists of a concentrator (KTC) as well as a metal refinery (Luilu) where various ore types are processed to produce copper metal and cobalt hydroxide. KCC is already working on expanding the sulphide ore flotation capacity in a parallel study. EPCM companies are, therefore, invited to submit a complete bid as per the Scope of Work (SOW) to conduct a concept / pre-feasibility study for the refinery work. This study will address the downstream processing of sulphide concentrates generated at the concentrator flotation plant and the required increase in processing capacity.The current refinery processing of sulphide concentrate at KCC includes thickening and sulphation roasting to generate water and acid soluble species for leaching in the whole-ore-leach plant.

 

---------------------

 

La Kamoto Copper Company (KCC) mène actuellement une étude visant à répondre à l'augmentation de l'alimentation en minerai sulfuré de l'usine, principalement à partir de mines à ciel ouvert. L'exploitation actuelle comprend un concentrateur (KTC) ainsi qu'une raffinerie de métaux (Luilu) où divers types de minerais sont traités pour produire du cuivre métallique et de l'hydroxyde de cobalt. KCC travaille déjà à l'extension de la capacité de flottation du minerai sulfuré dans le cadre d'une étude parallèle. Les sociétés EPCM sont donc invitées à soumettre une offre complète conformément au cahier des charges (SOW) pour mener une étude conceptuelle/de préfaisabilité pour les travaux de raffinage. Cette étude portera sur le traitement en aval des concentrés de sulfure générés à l'usine de flottation du concentrateur et sur l'augmentation requise de la capacité de traitement. Le traitement actuel du concentré de sulfure par raffinerie à KCC comprend l'épaississement et la grillage par sulfatation pour générer des espèces solubles dans l'eau et l'acide pour la lixiviation dans l'usine de lixiviation du minerai entier.

 

18-Sep

4

32766

Luilu Camp Upgrade P1-Civil & Earthworks

Construct high standard rafter slabs which will facilitate the construction of the senior accommodation camp for the Luilu Camp Upgrade project. This works under this Contract is Supply labour and equipment to install 30 rafter slabs, but not limited to the following:Site Setup & Mobilisation, Restricted Excavations, Compaction, Formwork / Steelworks, Reinforcement, Concrete, Finishing Works, Housekeeping (to leave the work location clean and safe after construction completion).

 

---------------------

 

Construire des dalles de chevrons de haute qualité qui faciliteront la construction du camp d'hébergement pour personnes âgées dans le cadre du projet de modernisation du camp de Luilu. Les travaux prévus dans le cadre de ce contrat consistent à fournir la main-d'œuvre et l'équipement nécessaires à l'installation de 30 dalles de chevrons, mais sans s'y limiter : installation et mobilisation du site, fouilles restreintes, compactage, coffrage/travaux en acier, renforcement, béton, travaux de finition, entretien ménager (pour laisser le lieu de travail propre et sûr une fois les travaux terminés).

 

18-Sep

5

32770

KTC Safety Revamp & Structural Integrity

The KTC Concentrator was first commissioned in 1968. Due to the age of the plant, structural steel, support platforms, columns and walkways in the crushing, milling and floatation areas has deteriorated to such an extent that large sections will have to be replaced. A Structural Integrity audit conducted by independent 3rd party (Investmech Engineering) and (ZINPRO Engineering) identified plant Structural Integrity concerns that must be restored, as well as additional Structural Safety findings from Internal Audits.The 3rd Structural Integrity Tender was initiated in June 2023 and Contract was awarded in October 2023 to implement the required Structural repairs and replacement (where necessary) , its coming to an end 2nd October 2024 . New contract is urgently required to carry-on with Investmech Report and ZINPRO Report refurbishment work, as well as outstanding audit findings and Safety Revamp Actions raised daily by KTC Operations and KTC Maintenance, to restore the Structural Integrity of the KTC Concentrator Plant, KCC Crushing and all Transfer Conveyors.

 

---------------------

 

Le concentrateur KTC a été mis en service pour la première fois en 1968. En raison de l'âge de l'usine, l'acier de construction, les plates-formes de support, les colonnes et les passerelles dans les zones de concassage, de broyage et de flottation se sont détériorés à un point tel que de grandes sections devront être remplacées. Un audit d'intégrité structurelle mené par des tiers indépendants (Investmech Engineering) et (ZINPRO Engineering) a identifié des problèmes d'intégrité structurelle de l'usine qui doivent être restaurés, ainsi que des conclusions supplémentaires sur la sécurité structurelle issues d'audits internes. Le 3e appel d'offres pour l'intégrité structurelle a été lancé en juin 2023 et le contrat a été attribué en octobre 2023 pour mettre en œuvre les réparations et le remplacement structurels requis (si nécessaire), il prendra fin le 2 octobre 2024. Un nouveau contrat est nécessaire de toute urgence pour poursuivre les travaux de rénovation du rapport Investmech et du rapport ZINPRO, ainsi que les conclusions d'audit en suspens et les actions de réorganisation de la sécurité soulevées quotidiennement par les opérations KTC et la maintenance KTC, afin de restaurer l'intégrité structurelle de l'usine de concentration KTC, du concassage KCC et de tous les convoyeurs de transfert.

 

18-Sep

6

32695

Lining of the KTO Sump

The Mine Technical Services Department at Kamoto Copper Company SA (KCC) is currently installing the surface water management plans prior to the start of the 2024 /25 rainfall season. The KTO sump leaked to the underground workings after a rainfall event in November 2023. There is therefore a need to concrete line the sump to prevent potential inrushes to the underground workings. An independent Contractor is required to line the KTO sump with either a combination of clay and other materials or to line it with a concrete / bentonite mixture. The work must be started and completed before the beginning of the 2024 /25 rainfall season.

 

---------------------

 

Le département des services techniques de la mine de Kamoto Copper Company SA (KCC) installe actuellement les plans de gestion des eaux de surface avant le début de la saison des pluies 2024/25. Le puisard de KTO a fui vers les travaux souterrains après un épisode de pluie en novembre 2023. Il est donc nécessaire de revêtir le puisard de béton pour éviter d'éventuelles infiltrations dans les travaux souterrains. Un entrepreneur indépendant est tenu de revêtir le puisard de KTO soit avec une combinaison d'argile et d'autres matériaux, soit avec un mélange de béton/bentonite. Les travaux doivent être commencés et terminés avant le début de la saison des pluies 2024/25.

 

18-Sep

7

32510

Microsoft 365 n Bitdefender

Community Development Project department purchased computers for Liaison offices. We need Microsoft 365 Entreprise E3 with teams and Bitdefender V27.0.38.163 software and licenses for those computers.

 

---------------------

 

Le département du projet de développement communautaire a acheté des ordinateurs pour les bureaux de liaison. Nous avons besoin de Microsoft 365 Entreprise E3 avec Teams et du logiciel Bitdefender V27.0.38.163 et des licences pour ces ordinateurs

 

18-Sep

8

32711

CRUSHING MTN FOR CODED WELDERS

The Kamoto Copper Company (KCC) is a world class, responsible mining business in the Democratic Republic of Congo. KCC is in Kolwezi, in the province of Lualaba. KCC’s Concentrator department (KTC) has different areas of which the crushing plant which is composed of the In pit crushing & conveying line, B4 crushing & conveying line and B3 crushing & conveying line where conveyor structures, transfer chutes, bins, feeders, etc…require maintenance shutdowns, routine inspections, repairs, etc…. This contract to hire skilled and experienced labours to for maintenance support in the crushing maintenance welding & boiler making activities.

 

---------------------

 

La Kamoto Copper Company (KCC) est une entreprise minière responsable de classe mondiale en République démocratique du Congo. KCC est située à Kolwezi, dans la province du Lualaba. Le département Concentrateur de KCC (KTC) comprend différentes zones dont l'usine de concassage qui est composée de la ligne de concassage et de transport en fosse, de la ligne de concassage et de transport B4 et de la ligne de concassage et de transport B3 où les structures de convoyeur, les goulottes de transfert, les bacs, les alimentateurs, etc. nécessitent des arrêts de maintenance, des inspections de routine, des réparations, etc. Ce contrat vise à embaucher une main-d'œuvre qualifiée et expérimentée pour assurer le soutien à la maintenance dans les activités de concassage, de soudage et de fabrication de chaudières.

 

18-Sep

9

32588

KTC Control room refurbishment

The Kamoto Copper Company (KCC) is a world class, responsible mining business in the Democratic Republic of Congo. KCC is in Kolwezi, in the province of Lualaba.Through the scale and nature of the business, KCC makes a significant and positive contribution to our local communities, the province, country, and broader society. Positive impacts range from production of raw materials that drive social progress, to the payment of taxes and royalties to the DRC government, provision of employment and business opportunities. KCC is an equal opportunity employer and actively promotes diversity in its workplace. KCC’s Concentrator department (KTC) would like to renovate the operations offices and seeks the services of a specialised civil engineering contractor to help achieve its objective.

 

---------------------

 

La Kamoto Copper Company (KCC) est une entreprise minière responsable de classe mondiale en République démocratique du Congo. KCC est située à Kolwezi, dans la province de Lualaba. Par l’ampleur et la nature de l’entreprise, KCC apporte une contribution significative et positive à nos communautés locales, à la province, au pays et à la société en général. Les impacts positifs vont de la production de matières premières qui favorisent le progrès social, au paiement d’impôts et de redevances au gouvernement de la RDC, en passant par la création d’emplois et d’opportunités commerciales. KCC est un employeur garantissant l’égalité des chances et encourage activement la diversité sur son lieu de travail. Le département Concentrateur de KCC (KTC) souhaite rénover les bureaux d’exploitation et recherche les services d’un entrepreneur spécialisé en génie civil pour l’aider à atteindre son objectif.

 

18-Sep

10

32710

MOTOR MANAGEMENT RELAYS HARDWIRE AND SOF

KCC Plant has four 369 Multilin motor management relays installed we are looking to upgrade The 369 Motor Management Relay manages and protects drives within the roaster plant by means of providing digital output relays for trips, alarms, and start blocks. Motor protection, fault diagnostics, power metering, and RTU functions are basically integrated into one economical draw out package. This upgrade will not only address the imminent threat posed by hardwire and software obsolescence but also enhance the reliability, efficiency, and overall performance of these critical assets.

 

---------------------

 

L'usine KCC possède quatre relais de gestion de moteur Multilin 369 que nous cherchons à mettre à niveau. Le relais de gestion de moteur 369 gère et protège les entraînements de l'usine de torréfaction en fournissant des relais de sortie numériques pour les déclenchements, les alarmes et les blocages de démarrage. La protection du moteur, le diagnostic des pannes, la mesure de la puissance et les fonctions RTU sont essentiellement intégrées dans un seul ensemble économique. Cette mise à niveau permettra non seulement de répondre à la menace imminente posée par l'obsolescence du câblage et des logiciels, mais également d'améliorer la fiabilité, l'efficacité et les performances globales de ces actifs critiques.

 

18-Sep

11

32734

CONVERYOR BELT MAINTENANCE Co and Acid

For sustainable conveyor performance, the renewal for one-year contract to Supply qualified labour to perform inspection and maintain of cobalt dryers and acid plant conveying systems as per KCC and Global standards to improve reliability and Operating Safety is extremely important. This contract is including 24/7 coverage, and breakdowns call out.

 

---------------------

 

Pour des performances durables des convoyeurs, le renouvellement d'un contrat d'un an pour la fourniture d'une main-d'œuvre qualifiée pour effectuer l'inspection et la maintenance des sécheurs de cobalt et des systèmes de transport des usines d'acide conformément aux normes KCC et mondiales afin d'améliorer la fiabilité et la sécurité de fonctionnement est extrêmement important. Ce contrat comprend une couverture 24h/24 et 7j/7, ainsi que des interventions en cas de panne.

 

18-Sep

12

32797

EDP & LOCAL OWN BUSINESS CONSUTLANTS

TO FURTHER GROW EDPs AND LOs AT KCC (THE ‘COMPANY’), A PREFERRED CONSULTANT WILL BE ENGAGED TO WORK CLOSELY WITH THESE EDP AND LO SUPPLIERS TO ENSURE THAT THE DEVELOPMENT OF THEIR BUSINESSES IS ACCELLERATED. THE CONSULTING COMPANY WILL WORK WITH THESE SUPPLIERS TO ENSURE DELIVERY TO KCC IS OF THE HIGHEST STANDARD AND THAT THEIR BUSINESSES GROWTH MATRICES AND TARGETS ARE MET AND EXCEEDED.

 

---------------------

 

Afin de faire croître les programmes de développement d'entreprise et les propriétés locales chez kcc (la « société »), un consultant privilégié sera engagé pour travailler en étroite avec ces fournisseurs de logiciels et de logiciels afin de garantir que le développement de leurs entreprises soit accéléré. la société de consultation travaillera avec ces fournisseurs pour garantir que la livraison à kcc soit de la plus haute qualité et que les matrices et objectifs de croissance de leurs entreprises soient atteints et dépassés.

 

18-Sep

13

32270

Mupine Area A GCM Crusher Removal

The Project Team at Kamoto Copper Company SA (KCC) is currently studying the expansion of the Mupine Tailings Storage Facility from its current elevation of 1460, up to a final elevation of 1485 to maintain the life of asset.As part of this programme, the footprint of the 25m embankment raise needs to be free from any materials that may impact its long-term stability. The outcome of this project will allow the south-east corner of the new footprint, named Area A, to be clear of all materials.

 

---------------------

 

L'équipe de projet de Kamoto Copper Company SA (KCC) étudie actuellement l'extension de l'installation de stockage des résidus de Mupine de son altitude actuelle de 1460 jusqu'à une altitude finale de 1485 pour maintenir la durée de vie de l'actif. Dans le cadre de ce programme, l'empreinte du remblai de 25 m doit être exempte de tout matériau susceptible d'avoir un impact sur sa stabilité à long terme. Le résultat de ce projet permettra au coin sud-est de la nouvelle empreinte, appelé Zone A, d'être exempt de tout matériau.

 

18-Sep

14

32504

Trees planting at Ngozo (labor hire)

Kamoto Copper Company (KCC) operates the Katanga Mining Limited (KML) copper and cobalt mining complex in Kolwezi, Democratic Republic of Congo (DRC). The mining complex includes underground and open pit mining, ore concentrating and refinery processing facilities, plus supporting facilities and infrastructure. KCC is looking for a specialized Contractor (ASM) to provide local labor, more precisely, labor from neighboring communities surrounding its site of operation for a reforestation and rehabilitation project for the Ngozo concession, thus responding to Glencore biodiversity plan.

 

---------------------

 

Kamoto Copper Company (KCC) exploite le complexe minier de cuivre et de cobalt de Katanga Mining Limited (KML) à Kolwezi, en République démocratique du Congo (RDC). Le complexe minier comprend des mines souterraines et à ciel ouvert, des installations de concentration et de raffinage du minerai, ainsi que des installations et infrastructures de soutien. KCC recherche un entrepreneur spécialisé (ASM) pour fournir de la main-d'œuvre locale, plus précisément, de la main-d'œuvre des communautés voisines entourant son site d'exploitation pour un projet de reforestation et de réhabilitation de la concession de Ngozo, répondant ainsi au plan de biodiversité de Glencore.

 

18-Sep

15

32692

CCD's LEACH TANKS ANNUAL PM

The washing efficiency at the decantation level in hydrometallurgical plants depends on the availability and proper functioning of the thickeners. Additionally, good leaching performance is also dependent on the availability of the leaching tanks. Moreover, a deterioration of the metallic structures caused by the condition of the mixing tank pipes has been observed. Considering all these elements, Kamoto Copper Company found it important to carry out planned maintenance work on the above-mentioned equipment. In addition, the modification work on the mixing tank pipes should be carried out to resolve the issue related to the deterioration of the metallic structures observed at WOL.

 

---------------------

 

L'efficacité du lavage au niveau de la décantation dans les usines hydrométallurgiques dépend de la disponibilité et du bon fonctionnement des épaississeurs. De plus, de bonnes performances de lixiviation dépendent également de la disponibilité des cuves de lixiviation. De plus, une détérioration des structures métalliques causée par l'état des tuyaux des cuves de mélange a été observée. Compte tenu de tous ces éléments, Kamoto Copper Company a jugé important d'effectuer des travaux de maintenance planifiés sur les équipements mentionnés ci-dessus. De plus, des travaux de modification sur les tuyaux des cuves de mélange doivent être effectués pour résoudre le problème lié à la détérioration des structures métalliques observée à WOL.

 

18-Sep

16

32744

Project Execution Resource Loading

KCC has identified various business critical projects that directly influences the LOA and production for the year 2025 and beyond. Studies are being done on these projects and therefor early works and execution for these projects are immanent. The delivery of the projects is critical to the KCC operation and therefor resources are required to assist with not only completing the Feasibilities but to also take the projects into execution.

 

---------------------

 

KCC a identifié plusieurs projets critiques pour l'entreprise qui influencent directement la LOA et la production pour l'année 2025 et au-delà. Des études sont en cours sur ces projets et, par conséquent, les premiers travaux et l'exécution de ces projets sont imminents. La livraison des projets est essentielle au fonctionnement de KCC et des ressources sont donc nécessaires pour aider non seulement à terminer les études de faisabilité, mais également à mener les projets à bien.

 

18-Sep

17

32836

FLOATATION REAGENT PLATFORMS &BUND WALLS

The Kamoto Copper Company (KCC) is a world class, responsible mining business in the Democratic Republic of Congo. KCC is in Kolwezi, in the province of Lualaba.Through the scale and nature of the business, KCC makes a significant and positive contribution to our local communities, the province, country, and broader society. Positive impacts range from production of raw materials that drive social progress, to the payment of taxes and royalties to the DRC government, provision of employment and business opportunities. KCC is an equal opportunity employer and actively promotes diversity in its workplace. KCC’s Concentrator department (KTC) owns and operates various pumping and storage equipment that are exposed to harsh environmental conditions such as reagents tanks that are not installed in bund walls posing a risk of chemical spillage and It is from this background that KTC seeks the services of a competent and specialised civil engineering contractor to construct bund walls as per scope described in this statement of work.

 

---------------------

 

KCC est un employeur garantissant l'égalité des chances et encourageant activement la diversité sur son lieu de travail. Le département Concentrateur de KCC (KTC) possède et exploite divers équipements de pompage et de stockage qui sont exposés à des conditions environnementales difficiles telles que des réservoirs de réactifs qui ne sont pas installés dans des murs de rétention, ce qui présente un risque de déversement de produits chimiques. C'est dans ce contexte que KTC recherche les services d'un entrepreneur en génie civil compétent et spécialisé pour construire des murs de rétention conformément au périmètre décrit dans le présent énoncé des travaux.

 

18-Sep

18

32596

SCADA System Operating System Upgrade

From the Cyber Security Audit findings, on the SCADA System, there is a requirement to upgrade the actual Operating System to comply with the audit findings. Right now, the SCADA System is running on an old version of Windows Operating System which justify   all the negative consequences reported in the audit.The system upgrade is only halfway complete, resulting in a mix of both old and new operating systems and inadequate industrial SCADA network infrastructure. This hybrid setup poses significant cybersecurity risks as the entire system cannot be adequately secured. Therefore, it is essential for us to press on and execute the project. This service contract aims to upgrade the Operating System of the SCADA, deploy an industrial network as by KCC standard, Upgrade KTC Plant SCADA Multiproject SCADA multiproject in order to facilitate overall Automation tasks and use this opportunity to close the gap identified within the existing Control System Team.

 

---------------------

 

D'après les résultats de l'audit de cybersécurité, il est nécessaire de mettre à niveau le système d'exploitation actuel du système SCADA pour se conformer aux résultats de l'audit. À l'heure actuelle, le système SCADA fonctionne sur une ancienne version du système d'exploitation Windows, ce qui justifie toutes les conséquences négatives signalées dans l'audit. La mise à niveau du système n'est qu'à moitié terminée, ce qui entraîne un mélange d'anciens et de nouveaux systèmes d'exploitation et une infrastructure de réseau SCADA industrielle inadéquate. Cette configuration hybride présente des risques de cybersécurité importants car l'ensemble du système ne peut pas être correctement sécurisé. Il est donc essentiel pour nous de poursuivre et d'exécuter le projet.

Ce contrat de service vise à mettre à niveau le système d'exploitation du SCADA, à déployer un réseau industriel conforme à la norme KCC, à mettre à niveau le multiprojet SCADA de l'usine KTC afin de faciliter les tâches d'automatisation globales et à utiliser cette opportunité pour combler le vide identifié au sein de l'équipe du système de contrôle existante.

 

23-Aug

19

32691

Load and haul 4000tpd of crushed ore

Current E6 has identified a shortfall of 3.6kt on B4 throughput due to delays in debottlenecking of the B4 circuit resulting from project execution delays and wet season impact if not mitigated.
This has a serious impact on the full year copper production of 206kt.Currently, two of KTC Metso mobile crushers are being refurbished and two are already operational. A third unit will be available to operate from August. These crushers can crush more than 5500 tons per day building an emergency low Gac ore stockpile at B3.
Due to limited fleet size at KTC, there is shortfall of equipment to constantly transfer these crushed ore to one of the Dima mills (CM6/7) whilst B4 feeds the other to maintain desired production.This document seeks to request a contractor to transfer a minimum of 4000 crushed ore per day from B3 to one of the Dima Mills within approximately 2km to maintain production and to bridge the shortfall gap.

 

---------------------

 

L'actuel E6 a identifié un déficit de 3,6 kt sur le débit de B4 en raison de retards dans le dégoulottage du circuit B4 résultant des retards d'exécution du projet et de l'impact de la saison des pluies s'il n'est pas atténué.Cela a un impact sérieux sur la production de cuivre de l'année entière de 206 kt. Actuellement, deux concasseurs mobiles Metso de KTC sont en cours de remise à neuf et deux sont déjà opérationnels. Une troisième unité sera disponible pour fonctionner à partir d'août. Ces concasseurs peuvent broyer plus de 5 500 tonnes par jour, constituant ainsi un stock d'urgence de minerai à faible teneur en Gac à B3.En raison de la taille limitée de la flotte de KTC, il y a un manque d'équipement pour transférer en permanence ce minerai broyé vers l'un des broyeurs Dima (CM6/7) tandis que B4 alimente l'autre pour maintenir la production souhaitée.Ce document vise à demander à un entrepreneur de transférer un minimum de 4 000 minerais broyés par jour de B3 vers l'un des broyeurs Dima dans un rayon d'environ 2 km pour maintenir la production et combler le déficit.

 

23-Aug

20

32475

DISMANTLE – TRANSPORTING - STACKING

According to KCC scaffolding registers, KCC mine has a lot of scaffolds whose dismantling is overdue in additional, some contractors have left some scaffolds at the end of contract, all those scaffold’s must be dismantlited and remove from site for safety and housekeeping reason’s Elements removed from site will be segregated between the ones that are still in good conditions to be reused and the ones that are to be scrapped. All elements will be properly stacked in the dedicated laydown areas for further process.

 

---------------------

 

Selon les registres d'échafaudages de KCC, La mine de KCC possède de nombreux échafaudages dont le démontage est en retard. Certains entrepreneurs ont laissé des échafaudages à la fin du contrat. Tous ces échafaudages doivent être démontés et retirés du site pour des raisons de sécurité et d'entretien. Les éléments retirés du site seront séparés entre ceux qui sont encore en bon état pour être réutilisés et ceux qui doivent être mis au rebut. Tous les éléments seront correctement empilés dans les zones de stockage dédiées pour un traitement ultérieur.

 

23-Aug

21

32547

Mupine TSF Inclinometers replacement

The Mupine Tailings Storage Facility from its current elevation of 1460 is experienced a low FoS on some of the sections due to steeper slope constrained by the electrical powerline which is running along the Toe of Western buttress. As part of the monitoring programme, the designed number of monitoring instrumentations must be in place for to allow the Tailings technical team to understand the short- and long-term ongoing stability of the facility.  5 inclinometers (MPN04-05-06-07-08 and WRD05) located especially on the section of low Fos have been vandalised by illegal miners.The outcome of this project will allow to have back in place all designed instrumentations system and allow strong monitoring during construction raise of 1460 to 1465.

 

---------------------

 

L'installation de stockage des résidus de Mupine, à son altitude actuelle de 1460, connaît un FoS faible sur certaines sections en raison d'une pente plus raide limitée par la ligne électrique qui longe le pied du contrefort occidental.Dans le cadre du programme de surveillance, le nombre prévu d'instruments de surveillance doit être en place pour permettre à l'équipe technique des résidus de comprendre la stabilité continue à court et à long terme de l'installation. 5 inclinomètres (MPN04-05-06-07-08 et WRD05) situés notamment sur la section de Fos bas ont été vandalisés par des mineurs illégaux.
Le résultat de ce projet permettra de remettre en place tout le système d'instrumentation conçu et de permettre une surveillance étroite pendant la construction de l'élévation de 1460 à 1465.

 

23-Aug

22

32595

Mupine TSF FMEA

The consultant shall be responsible for compiling the background information required to facilitate the FMEA workshop, with support from Glencore/KCC. Background documentation must be hosted on a secure web-based platform (e.g. SharePoint) and distributed to the FMEA participants a minimum 2 weeks in advance of the FMEA workshop.

 

---------------------

 

Le consultant sera chargé de rassembler les informations de base nécessaires à l'animation de l'atelier AMDEC, avec le soutien de Glencore/KCC. La documentation de base doit être hébergée sur une plateforme Web sécurisée (par exemple SharePoint) et distribuée aux participants AMDEC au moins 2 semaines avant l'atelier AMDEC.

 

23-Aug

23

32606

2 IT Support technicians on Umoja phones

Employee Engagement project (Umoja) is a Global project with 6500 smartphones deployed in the company. To support all these smartphones, we need more technicians.

 

---------------------

 

Le projet Employee Engagement (Umoja) est un projet mondial avec 6500 smartphones déployés dans l'entreprise. Pour prendre en charge tous ces smartphones, nous avons besoin de plus de techniciens

 

23-Aug

24

32577

METALLURGY COACHING PROGRAM

Kamoto Copper Company is mining company located in the Lualaba province of the DRC producing copper and cobalt.
The processing plant is designed with a mineral processing plant containing comminution and ore beneficiation (contractor) and a hydrometallurgical refinery of copper and cobalt.

To ensure best metallurgical performances of the processing plant, the Processing Department has been structured with a Metallurgical Division with core responsibilities being: (i) Monitoring, control and optimisation of metallurgical performances that include plant efficiencies, equipment performance and processing cost and (ii) providing technical support to the processing improvement and capital projects.One of the key responsibilities of the leadership (Managers and Superintendents) is coaching and mentoring of the metallurgists and senior metallurgists. However, due to increasing load on the leadership team related to driving safework culture and increased throughput in the place inducing operational and metallurgical challenges and associated debottlenecking projects, it becomes critical to get an internal or external support for the metallurgy leadership team particularly with respect to the coaching and mentoring of the crew.The purpose of the service contract is there for to provide mentoring and coaching of the senior metallurgists and metallurgists through an experienced and renowned expert.
One of the key role of the expert will be to guide the metallurgists through the Metcelerate program launched by Glencore for the company process engineers.

 

---------------------

 

Kamoto Copper Company est une société minière située dans la province de Lualaba en RDC qui produit du cuivre et du cobalt. L'usine de traitement est conçue avec une usine de traitement des minéraux contenant la fragmentation et l'enrichissement du minerai (entrepreneur) et une raffinerie hydrométallurgique de cuivre et de cobalt. Pour assurer les meilleures performances métallurgiques de l'usine de traitement, le département de traitement a été structuré avec une division métallurgique dont les principales responsabilités sont : (i) Suivi, contrôle et optimisation des performances métallurgiques qui incluent l'efficacité de l'usine, les performances de l'équipement et le coût de traitement et (ii) fourniture d'un soutien technique à l'amélioration du traitement et aux projets d'investissement. L'une des principales responsabilités de la direction (directeurs et surintendants) est l'encadrement et le mentorat des métallurgistes et des métallurgistes seniors. Cependant, en raison de la charge croissante qui pèse sur l'équipe de direction en raison de la promotion d'une culture de travail sécuritaire et de l'augmentation du rendement sur le lieu, ce qui entraîne des défis opérationnels et métallurgiques et des projets de dégoulottage associés, il devient essentiel d'obtenir un soutien interne ou externe pour l'équipe de direction de la métallurgie, notamment en ce qui concerne l'encadrement et le mentorat de l'équipage.

Le contrat de service a pour objectif de fournir un mentorat et un encadrement aux métallurgistes seniors et aux métallurgistes par l'intermédiaire d'un expert expérimenté et renommé.
L'un des rôles clés de l'expert sera de guider les métallurgistes dans le cadre du programme Metcelerate lancé par Glencore pour les ingénieurs de processus de l'entreprise.

 

23-Aug

25

32536

GPS vehicle tracking and driver behaviour monitoring and feedback system.

KCC utilizes mobile equipment including light vehicles, Heavy vehicles, bus transport services, mobile mining equipment to implement its operations and transport employees to and from work. This is to ensure a safe and good working environment to boost productivity and performance of its employees.Since mobile equipment forms part of Fatal Hazard Protocols (FHP’s), safety of employees utilizing mobile equipment is of paramount importance.
To safeguard and protect employees and operators utilizing mobile equipment, KCC would like to enter a competitive tender for Vehicle tracking and management systems.

 

---------------------

 

KCC utilise des équipements mobiles, notamment des véhicules légers, des véhicules lourds, des services de transport par autobus et des équipements miniers mobiles pour mettre en œuvre ses opérations et transporter ses employés vers et depuis leur lieu de travail. Cela permet de garantir un environnement de travail sûr et de qualité pour accroître la productivité et les performances de ses employés. Étant donné que les équipements mobiles font partie des protocoles de risque mortel (FHP), la sécurité des employés qui utilisent des équipements mobiles est d'une importance primordiale. Pour protéger les employés et les opérateurs qui utilisent des équipements mobiles, KCC souhaite lancer un appel d'offres pour des systèmes de suivi et de gestion des véhicules.

 

23-Aug

26

32557

MANPOWER FOR EXPORTS CRITICAL WORKS

Since this work is very important as it aims to eliminate the risk of truck collisions by controlling traffic in export zones, and the risk of working at height by not allowing drivers to tarpaulin their trucks themselves, we need a long-term contract to cover this work and ensure that no incidents or accidents occur in our operations. The contractor must provide qualified personnel to work on traffic management in export areas and the tarpaulin covering of export trucks.

 

---------------------

 

Étant donné que ces travaux sont très importants car ils visent à éliminer le risque de collisions entre camions en contrôlant la circulation dans les zones d'exportation et le risque de travail en hauteur en ne permettant pas aux conducteurs de bâcher eux-mêmes leurs camions, nous avons besoin d'un contrat à long terme pour couvrir ces travaux et garantir qu'aucun incident ou accident ne se produise dans nos opérations. L'entrepreneur doit fournir du personnel qualifié pour travailler sur la gestion de la circulation dans les zones d'exportation et le bâchage des camions d'exportation.

 

23-Aug

27

32611

Pulling  Optic fiber Mashamba MAE  - B4

Kamoto Copper Company IT infrastructure  is critical for the smooth running of its mining operations, and any downtime or performance issues can have a significant impact on the company's bottom line. The company needs to ensure that the environment is well-maintained, optimized for performance, and protected from potential security vulnerabilities.

 

---------------------

 

L'infrastructure informatique de Kamoto Copper Company est essentielle au bon fonctionnement de ses opérations minières. Tout temps d'arrêt ou problème de performance peut avoir un impact significatif sur les résultats de l'entreprise. L'entreprise doit s'assurer que l'environnement est bien entretenu, optimisé pour les performances et protégé contre les vulnérabilités potentielles en matière de sécurité.

 

23-Aug

28

32608

Printers deployment, support and maintenance

Kamoto Copper Company's has considerably increased the number of printers on its premises.  We currently have 2 technicians servicing, maintaining, and supporting around 410 printers of HP brand and different models, which is causing huge delays in meeting our customers' needs. According to our statistics, printer availability varies between 65% and 75% out of a total of 408 printers deployed on site. This low rate is justified by the shortage of technicians, which has a serious impact on printer servicing and maintenance (paper jams, wear and tear on parts).

 

---------------------

 

 La société Kamoto Copper Company a considérablement augmenté le nombre d'imprimantes dans ses locaux. Nous avons actuellement 2 techniciens qui assurent l'entretien, la maintenance et le support d'environ 410 imprimantes de marque HP et de différents modèles, ce qui entraîne d'énormes retards dans la satisfaction des besoins de nos clients. Selon nos statistiques, la disponibilité des imprimantes varie entre 65% et 75% sur un total de 408 imprimantes déployées sur site. Ce faible taux se justifie par la pénurie de techniciens, qui a un impact sérieux sur l'entretien et la maintenance des imprimantes (bourrages papier, usure des pièces).

 

23-Aug

29

32694

Installation of liners

The Mine Technical Services Department at Kamoto Copper Company SA (KCC) is currently installing the surface water management plans ahead of the start of the 2024 /25 rainfall season. The work entails cleaning of existing stormwater sumps and trenches as well as installing new ones around the KOV and Mashamba East Open pits. An independent Contractor is required to install liners on stormwater trenches and sumps on the pit perimeter. The trenches will be lined with concrete canvas liners whereas the sumps will be lined with geomembrane liners.

 

---------------------

 

Le département des services techniques de la mine de Kamoto Copper Company SA (KCC) installe actuellement les plans de gestion des eaux de surface avant le début de la saison des pluies 2024/25. Les travaux comprennent le nettoyage des puisards et des tranchées d'eaux pluviales existants ainsi que l'installation de nouveaux autour des mines à ciel ouvert de KOV et de Mashamba East. Un entrepreneur indépendant est requis pour installer des revêtements sur les tranchées d'eaux pluviales et les puisards sur le périmètre de la mine. Les tranchées seront revêtues de revêtements en toile de béton tandis que les puisards seront revêtus de revêtements en géomembrane.

 

23-Aug

30

32544

Tracking and Demurrage Staff

Logistics, Imports and exports requires the assistance of 3 administrative staff members to assist with the administrative duties, which will include the capturing of truck data, downtime activities, calculation and verification of demurrage claims.

 

---------------------

 

La logistique, importations et exportations nécessite l'aide de 3 membres du personnel administratif pour faciliter les tâches administratives, qui comprendront la saisie des données des camions, les activités de temps d'arrêt, le calcul et la vérification des demandes de surestaries.

 

26-Jul

31

32534

CCTV INFRASTRUCTURE IN LUILU WAREHOUSES

KCC OT RADIO CCTV team need to install CCTV operation system in Warehouses. The contractor guys will have to prepare the required infrastructure that going to handle cameras will be installed by CCTV team. UTP Connection, Junction Box Installation and Cabinet Mounting:
• UTP cable networks termination with surge arrestor
• UTP cable testing
• Installing and mounting cabinets 
• Installing and mounting junction boxes
• Mounting bosal pipe to cabinet
• Mounting switch in the cabinet.                                                                                                                                                                                                                                                                                                                                                                                                                                                           

 

---------------------

 

L'équipe de vidéosurveillance de KCC OT RADIO doit installer un système d'exploitation de vidéosurveillance dans les entrepôts. Les entrepreneurs devront préparer l'infrastructure requise pour gérer les caméras qui seront installées par l'équipe de vidéosurveillance. Connexion UTP, installation de boîte de jonction et montage en armoire :
• Terminaison des réseaux câblés UTP avec parafoudre
• Test des câbles UTP
• Installation et montage d'armoires
• Installation et montage de boîtes de jonction
• Montage du tuyau Bosal sur l'armoire
• Montage de l'interrupteur dans l'armoire

 

26-Jul

32

32552

CSM1&2 MAINTENANCE

Copper cathode stripping machines and stainless-steel cathode plates are critical elements determining the longevity, productivity, and efficiency of modern tank houses. EW2 Cathode stripping machines 1&2 were in bad condition since 2020 and were no longer able to achieve the target of 4 blanks to be processed per minute, Majority of Harvest is being done manually at EW2. Major components repair such as Transverse conveyor, Chain and Cylinders were done without success.

 

---------------------

 

 Les machines de dénudage des cathodes en cuivre et les plaques cathodiques en acier inoxydable sont des éléments essentiels qui déterminent la longévité, la productivité et l’efficacité des réservoirs modernes. Les machines de décapage de cathode EW2 1 et 2 étaient en mauvais état depuis 2020 et n'étaient plus en mesure d'atteindre l'objectif de 4 flans à traiter par minute, la majorité de la récolte est effectuée manuellement à EW2. La réparation des composants majeurs tels que le convoyeur transversal, la chaîne et les cylindres a été effectuée sans succès.

 

26-Jul

33

31937

Provision of Security Services - Part 02

Kamoto Copper Company (hereinafter called the “Company”), under this tender is looking to hire a competent security service provider (hereinafter-called the “Contractor”) with a presence in the DRC for the provision of Canine (K9) Teams, and Team Leaders to carry out the following duties:
• Rapid Response Teams, including K9 elements
Services are to be carried out on Company premises in Kolwezi to guard and protect the Company’s assets and personnel and provide other related security services herein described.

 

---------------------

 

Kamoto Copper Company (ci-après appelée la « Société »), dans le cadre du présent appel d'offres, cherche à embaucher un prestataire de services de sécurité compétent (ci-après appelé le « Contractant ») présent en RDC pour la fourniture d'équipes canines (K9), et Chefs d'équipe pour effectuer les tâches suivantes :
• Équipes d'intervention rapide, y compris des éléments K9
Les services doivent être effectués dans les locaux de la Société à Kolwezi pour garder et protéger les actifs et le personnel de la Société et fournir d'autres services de sécurité connexes décrits ici.

 

26-Jul

34

32598

SKM - Water Supply Well Drilling

The scope of this work is to drill one (1) large diameter water supply well into the underlying ore body that is known to have high permeability and an abundance of water to support such a well.
The Scope of Services under this contract include, but not limited to the following:
- Mobilization of drilling rig and experienced operators and assistants.
- Completion of safety audits, risk assessments and inductions.
- Procurement of all well construction materials as per KCC specification.
- Drilling and airlift cleaning of one (1) large diameter water supply well up to 350m in vicinity of SKM and KTC to a 16” diameter completion. This is the same specification as the dewatering wells used in KOV and Mashamba East open pit operations.
- Full drilling support, including specification of all drilling muds, fuel, provision for water supply etc.
- Supply, installation and completion of well screen, casing and gravel pack of a high specification and quality.
- Good record keeping during drilling and well construction (penetration rate, mud loss, weight-on-bit, water strikes, airlift yields etc).
- Well surface completion and well airlift development.
- Drill platform clean-up and demobilization.
                                                                                                                                                                                                                                                                                                                                                                                                                            

 

---------------------

 

La portée de ces travaux est de forer un (1) puits d'approvisionnement en eau de grand diamètre dans le corps minéralisé sous-jacent qui est connu pour avoir une perméabilité élevée et une abondance d'eau pour soutenir un tel puits.
L'étendue des services en vertu de ce contrat comprend, sans s'y limiter, les éléments suivants :
- Mobilisation d'appareils de forage et d'opérateurs et assistants expérimentés.
- Réalisation d'audits de sécurité, d'évaluations des risques et d'intégrations.
- Achat de tous les matériaux de construction du puits selon les spécifications KCC.
- Forage et nettoyage par transport aérien d'un (1) puits d'approvisionnement en eau de grand diamètre jusqu'à 350 m à proximité de SKM et KTC jusqu'à un diamètre de 16 pouces. Il s’agit des mêmes spécifications que celles des puits de déshydratation utilisés dans les opérations à ciel ouvert de KOV et Mashamba East.
- Prise en charge complète du forage, y compris la spécification de toutes les boues de forage, du carburant, de l'approvisionnement en eau, etc.
- Fourniture, installation et réalisation d'une crépine de puits, d'un tubage et d'un pack de gravier de haute spécification et qualité.
- Bonne tenue des registres pendant le forage et la construction des puits (taux de pénétration, perte de boue, poids sur le trépan, impacts d'eau, rendements du transport aérien, etc.).
- Achèvement de la surface des puits et développement du transport aérien des puits.
- Nettoyage et démobilisation des plateformes de forage.

 

26-Jul

35

32545

Truck Park Electrical Upgrade

This scope of works describes the works required for the installation of medium and low voltage cables and switchgear from the existing medium voltage ring main unit (RMU), towards the Reagents Warehouses area. The installation includes but is not limited to cable excavations, cables, cable ladders, distribution boards, earth leakage relays, circuit breakers, socket outlets and light poles and fittings installations. The Contractor must quote on per item of installation as mentioned herein below. The successful contractor/s will be paid per installation or unit of measure installed only after successful completion and sign off by the KCC representative.

 

---------------------

 

Cette étendue des travaux décrit les travaux requis pour l'installation de câbles et d'appareillages moyenne et basse tension depuis l'unité principale d'anneau moyenne tension (RMU) existante vers la zone des entrepôts de réactifs. L'installation comprend, sans toutefois s'y limiter, les excavations de câbles, les câbles, les échelles à câbles, les tableaux de distribution, les relais différentiels, les disjoncteurs, les prises de courant et les installations de poteaux d'éclairage et de raccords. L’entrepreneur doit proposer un prix par élément d’installation comme mentionné ci-dessous. Le ou les entrepreneurs retenus seront payés par installation ou unité de mesure installée uniquement après la réussite et l'approbation du représentant de KCC.

 

26-Jul

36

32558

Industrial Site Medic - Basic Training

The purpose of this Request for Proposal is to select suitable training provider and establish the contract of training agreement with successful company for the provision of conducting CERTIFIED INDUSTRIAL SITE MEDIC – BASIC TRAINING TO EMERGENCY RESPONSE TEAM. To this end, Training and Development department is currently seeking to establish an agreement with an accredited training provider who can provide training on site to the Emergency Response Team which is Former Basic Ambulance Assistant (BAA) aligned, adapted for industrial applications. The Basic Industrial Site Medic (ISM-B), is a foundational training program that will equip graduates with the knowledge and skills, required to act as advanced first responders insofar as medical related emergencies. The course is aligned to the former South African Basic Ambulance Assistant, with adaptions to cater to industrial settings. The training curriculum is recognized and accredited for CPD point accrual, by the University of Johannesburg, Faculty of Health Sciences, Department of Emergency Medical Care. Successful graduates will be issued with a certificate of completion, from an accredited institution, and bearing the affiliation to the accrediting body. The course is a blend of theoretical classroom lessons, as well as practical sessions in a classroom as well as in the field.

 

---------------------

 

Le but de cette demande de proposition est de sélectionner un prestataire de formation approprié et d'établir un contrat d'accord de formation avec l'entreprise retenue pour la fourniture d'une formation médicale de site industrielle certifiée – FORMATION DE BASE À L'ÉQUIPE D'INTERVENTION D'URGENCE. À cette fin, le département Formation et Développement cherche actuellement à établir un accord avec un prestataire de formation accrédité qui pourra fournir une formation sur place à l'équipe d'intervention d'urgence qui est alignée sur l'ancien assistant d'ambulance de base (BAA), adapté aux applications industrielles. Le Basic Industrial Site Medic (ISM-B) est un programme de formation de base qui dotera les diplômés des connaissances et des compétences nécessaires pour agir en tant que premiers intervenants avancés dans la mesure où les urgences médicales sont liées. Le cours est aligné sur l'ancien assistant d'ambulance de base sud-africain, avec des adaptations pour répondre aux besoins industriels. Le programme de formation est reconnu et accrédité pour l'accumulation de points CPD par l'Université de Johannesburg, Faculté des sciences de la santé, Département des soins médicaux d'urgence. Les diplômés retenus recevront un certificat d'achèvement, délivré par un établissement accrédité et portant l'affiliation à l'organisme d'accréditation. Le cours est un mélange de cours théoriques en classe, ainsi que de séances pratiques en classe ainsi que sur le terrain.

 

26-Jul

37

32540

KCC Forklift Maintenance support service

The Contractor is required to provide highly qualified and experienced personnel, with backgrounds in Mechanical and Electrical expertise, for the different forklift from various manufacturers: JCB, Toyota, Manitou, Kemach, Hyster. The focus will be to improve the performance and availability of the forklift and light vehicles fleet. They will mentor/coach the KCC technicians to improve their understanding and capability in the maintenance and technical arena. They should make use of the diagnostic tool when/where required to support the diagnostic of the broken-down equipment.

 

---------------------

 

L'entrepreneur doit fournir du personnel hautement qualifié et expérimenté, possédant une expertise en mécanique et en électricité, pour les différents chariots élévateurs de divers fabricants : JCB, Toyota, Manitou, Kemach, Hyster. L’accent sera mis sur l’amélioration des performances et de la disponibilité de la flotte de chariots élévateurs et de véhicules légers. Ils encadreront/encadreront les techniciens de KCC pour améliorer leur compréhension et leurs capacités dans le domaine de la maintenance et technique. Ils doivent utiliser l'outil de diagnostic lorsque cela est nécessaire pour faciliter le diagnostic de l'équipement en panne.

 

26-Jul

38

32620

Provision of Security Services - K9 Support

Kamoto Copper Company (hereinafter called the “Company”), under this tender is looking to hire a competent security service provider (hereinafter-called the “Contractor”) with a presence in the DRC for the provision of Canine (K9) Teams, and Team Leaders to carry out the following duties:
• Vehicle-Borne K9 Support Teams – skilled K9 teams to assist Rapid Response Teams when necessary. Will serve as a strong dissuasive force when standing alone.
Services are to be carried out on Company premises in Kolwezi to guard and protect the Company’s assets and personnel and provide other related security services herein described.

 

---------------------

 

Kamoto Copper Company (ci-après appelée la « Société »), dans le cadre du présent appel d'offres, cherche à embaucher un prestataire de services de sécurité compétent (ci-après appelé le « Contractant ») présent en RDC pour la fourniture d'équipes canines (K9), et Chefs d'équipe pour effectuer les tâches suivantes :
• Équipes de support K9 embarquées sur véhicule – équipes K9 qualifiées pour assister les équipes d'intervention rapide si nécessaire. Servira de force dissuasive puissante lorsqu’il est seul.
Les services doivent être effectués dans les locaux de la Société à Kolwezi pour garder et protéger les actifs et le personnel de la Société et fournir d'autres services de sécurité connexes décrits ici.

 

26-Jul

39

32601

INSTALL LIFELINES AT OFFLOADING AREAS

Lime plant experience lop of mud during rainy season. This is a safety concern due the offloading of trucks using forklifts.

 

---------------------

 

L'usine de chaux fait l'expérience de la boue pendant la saison des pluies. Il s'agit d'un problème de sécurité en raison du déchargement des camions à l'aide de chariots élévateurs.

 

26-Jul

40

32602

Labor on the Concrete Slabs at Lime Plan

Lime plant experience lop of mud during rainy season. This is a safety concern due the offloading of trucks using forklifts. FHP 4

 

---------------------

 

L'usine de chaux fait l'expérience de la boue pendant la saison des pluies. Il s'agit d'un problème de sécurité en raison du déchargement des camions à l'aide de chariots élévateurs. FHP4

 

26-Jul

41

32559

SAMPLING OF COH LOTS & LAB CERTIFICATES

To comply with the legal export procedure in use in the DRC, we must organize the sampling of the CoH bags by lots to be exported from the Export Yard by a third-party laboratory approved by the Ministry of Mines.

 

---------------------

 

Pour respecter la procédure légale d'exportation en vigueur en RDC, nous devons organiser l'échantillonnage des sacs CoH par lots à exporter depuis l'Export Yard par un laboratoire tiers agréé par le Ministère des Mines.

 

26-Jul

42

32604

CM5,6 & 7 ONLINE VIBRATION MONITORING

The Kamoto Copper Company (KCC) is a world class, responsible mining business in the Democratic Republic of Congo. KCC is in Kolwezi, in the province of Lualaba. Through the scale and nature of the business, KCC makes a significant and positive contribution to our local communities, the province, country, and broader society. Positive impacts range from production of raw materials that drive social progress, to the payment of taxes and royalties to the DRC government, provision of employment and business opportunities. KCC is an equal opportunity employer and actively promotes diversity in its workplace. KCC’s Concentrator department (KTC) would like to Install an Online Vibration Monitoring System for three(3) Cascade Mills  in support of its strategic plan to improve process automation in its business operations. The system is to assist our vibration analysts with continuous machine data for analysis and KCC is seeking the services of the service provider to achieve this objective. The vendor will focus on the supply of all project materials, Installations and software configuration, commissioning, and training of the team on new system/software operation and provide after-market support.

 

---------------------

 

La Kamoto Copper Company (KCC) est une entreprise minière responsable de classe mondiale en République démocratique du Congo. KCC se trouve à Kolwezi, dans la province du Lualaba.Grâce à l'ampleur et à la nature de l'entreprise, KCC apporte une contribution significative et positive à nos communautés locales, à la province, au pays et à la société dans son ensemble. Les impacts positifs vont de la production de matières premières qui favorisent le progrès social, au paiement d'impôts et de redevances au gouvernement de la RDC, en passant par la création d'emplois et d'opportunités commerciales. KCC est un employeur garantissant l'égalité des chances et promeut activement la diversité sur son lieu de travail. Le département Concentrateur (KTC) de KCC souhaite installer un système de surveillance des vibrations en ligne pour trois (3) broyeurs en cascade à l'appui de son plan stratégique visant à améliorer l'automatisation des processus dans ses opérations commerciales. Le système est destiné à aider nos analystes en vibrations avec des données machine continues à analyser et KCC recherche les services du prestataire de services pour atteindre cet objectif. Le fournisseur se concentrera sur la fourniture de tous les matériaux du projet, les installations et la configuration des logiciels, la mise en service et la formation de l'équipe sur le fonctionnement du nouveau système/logiciel et fournira un support après-vente.

 

26-Jul

43

32560

Fire Fighting - Level 1

The purpose of this Request for Proposal is to select suitable training provider and establish the contract of training agreement with successful company for the provision of conducting CERTIFIED FIRE FIGHTING1 nfpa ALIGNED TRAINING TO EMERGENCY RESPONSE TEAM. To this end, Training and Development department is currently seeking to establish an agreement with an accredited training provider who can provide training on site to the Emergency Response Team Fire Fighting 1 that is aligned with the international accreditation of National Fire Protection Association® (NFPA®) standards – NFPA 1001 and Hazmat awareness – NFPA 472
Firefighter 1 is a foundational training program that will equip graduates with the knowledge and skills, required to perform duties as a firefighter. The training curriculum is aligned to NFPA 1001, whilst the training experience istailored to take into consideration your site-specific dynamics and factors. HAZMAT Awareness is aligned to NFPA 472 and forms part of the Firefighter 1 curriculum and must be completed as part of the program.
Successful graduates will be issued with a certificate of completion, from an accredited institution, and bearing the affiliation to the accrediting body.
The course is a blend of theoretical classroom lessons, as well as practical sessions in a classroom as well as in the field.

 

---------------------

 

Le but de cette demande de proposition est de sélectionner un prestataire de formation approprié et d'établir le contrat d'accord de formation avec l'entreprise retenue pour la fourniture d'une FORMATION CERTIFIÉE DE LUTTE CONTRE LES INCENDIES1 nfpa ALIGNÉE À L'ÉQUIPE D'INTERVENTION D'URGENCE. À cette fin, le service Formation et Développement cherche actuellement à établir un accord avec un prestataire de formation accrédité qui peut fournir une formation sur site à l'équipe d'intervention d'urgence Fire Fighting 1 qui est alignée sur l'accréditation internationale de la National Fire Protection Association® (NFPA®). ) normes – NFPA 1001 et sensibilisation aux matières dangereuses – NFPA 472 Pompier 1 est un programme de formation de base qui permettra aux diplômés d'acquérir les connaissances et les compétences nécessaires pour exercer les fonctions de pompier. Le programme de formation est aligné sur la norme NFPA 1001, tandis que l'expérience de formation est conçue pour prendre en compte la dynamique et les facteurs spécifiques à votre site. La sensibilisation aux matières dangereuses est alignée sur la NFPA 472 et fait partie du programme Firefighter 1 et doit être complétée dans le cadre du programme. Les diplômés retenus recevront un certificat d'achèvement, délivré par un établissement accrédité et portant l'affiliation à l'organisme d'accréditation. Le cours est un mélange de cours théoriques en classe, ainsi que de séances pratiques en classe ainsi que sur le terrain.

 

26-Jul

44

32605

Octoplant License Renewal

This software is to enhance the current backup solution on the operational networks as well as change control on software within the SCADA and PLC environments. This solution is aligned with Global guidelines. Provide annual subscription of Octoplant Core software to Manage and safeguard the production environment to minimize downtime, IoT Device Management, Safeguarding Assets, Instant Recovery, Business Intelligence, Threat Protection and provide Education & Training.

 

---------------------

 

Ce logiciel vise à améliorer la solution de sauvegarde actuelle sur les réseaux opérationnels ainsi qu'à contrôler les modifications sur les logiciels dans les environnements SCADA et PLC. Cette solution est conforme aux directives mondiales. Fournir un abonnement annuel au logiciel Octoplant Core pour gérer et protéger l'environnement de production afin de minimiser les temps d'arrêt, la gestion des appareils IoT, la protection des actifs, la récupération instantanée, la veille stratégique, la protection contre les menaces et fournir une éducation et une formation.

 

26-Jul

45

32693

Minitab - Annual Multi User License for 5 User

This software is to enhance the current data analysis and statistical capabilities within the operational networks, specifically for quality assurance and metal accounting. This solution is aligned with Global guidelines. Provide annual subscription of Minitab software to manage and enhance data analysis, statistical process control, quality improvement, and provide Education & Training.

 

---------------------

 

Ce logiciel vise à améliorer les capacités actuelles d'analyse des données et de statistiques au sein des réseaux opérationnels, en particulier pour l'assurance qualité et la comptabilité des métaux. Cette solution est conforme aux directives mondiales. Offrez un abonnement annuel au logiciel Minitab pour gérer et améliorer l'analyse des données, le contrôle statistique des processus, l'amélioration de la qualité et proposez des formations.

 

26-Jul

46

32481

GEOMET TEST WORK 2024

The Kamoto Copper Company (KCC) is a copper and cobalt mining company established in the Lualaba Province of the Democratic Republic of Congo (DRC) under a Joint Venture between Glencore PLC and Gecamines (the DRC State owned Mining Company). Operations consist of underground (KTO) and open pit mines (Mashamba and KOV), a concentrator (KTC) producing sulphide concentrate and oxide ore, a roaster that processes sulphide concentrate and a hydrometallurgical plant (LUILU) which produces copper cathode and cobalt hydroxides from roaster calcine and oxide ores. The production capacity is 300 ktpa of copper cathode and 35 ktpa of cobalt hydroxide. An acid plant produces 98% sulphuric acid which is the main reagent consumed in the plant and produces liquid sulphur dioxide that serves as the main reductant for the leaching of cobalt. 

 

---------------------

 

La Kamoto Copper Company (KCC) est une société minière de cuivre et de cobalt établie dans la province de Lualaba en République démocratique du Congo (RDC) dans le cadre d'une coentreprise entre Glencore PLC et Gecamines (la société minière d'État de la RDC). Les opérations comprennent des mines souterraines (KTO) et à ciel ouvert (Mashamba et KOV), un concentrateur (KTC) produisant du concentré de sulfure et du minerai d'oxyde, un torréfacteur qui traite le concentré de sulfure et une usine hydrométallurgique (LUILU) qui produit de la cathode de cuivre et des hydroxydes de cobalt à partir de la calcination du torréfacteur et des minerais d'oxyde. La capacité de production est de 300 ktpa de cathode de cuivre et de 35 ktpa d'hydroxyde de cobalt. Une usine d'acide produit de l'acide sulfurique à 98 %, qui est le principal réactif consommé dans l'usine et produit du dioxyde de soufre liquide qui sert de principal réducteur pour la lixiviation du cobalt.

 

26-Jul

47

32400

RENTAL OF A FUEL BOWSER FOR KOV/ME OPEN

This comprehensive rental contract outlines the terms and conditions for the Fuel Browsers equipment to be utilized at the KOV Open Pit mining project. The agreement covers the scope of services, rental rates, maintenance responsibilities, and dispute resolution procedures.

 

---------------------

 

Ce contrat de location complet décrit les modalités et conditions de l'équipement Fuel Browsers qui sera utilisé dans le cadre du projet minier à ciel ouvert KOV. L'accord couvre l'étendue des services, les tarifs de location, les responsabilités de maintenance et les procédures de résolution des litiges.

 

26-Jul

48

32403

SX PLANT & EW OFFICES CONSTRUCTION

Employee working in SX and EW do not have appropriate offices to allow them to work in complete safety and in good conditions aligning with GLENCORE s’ standard and approach to sustainable development. The current project will remediate to this situation and will include: An office rooms, An office meeting, A refectory, Changing rooms and Toilet.

 

---------------------

 

 Les salariés travaillant à SX et EW ne disposent pas de bureaux adaptés leur permettant de travailler en toute sécurité et dans de bonnes conditions conformes aux standards et à la démarche de développement durable de GLENCORE. Le projet actuel permettra de remédier à cette situation et comprendra : Des salles de bureaux, Un bureau de réunion, Un réfectoire, Des vestiaires et des toilettes.

 

26-Jul

49

32502

LABORATORY SERVICES:  USED OIL ANALYS

Laboratory oil Samples analysis on Under Ground Mobile Equipment : - Collect used oil Samples on weekly basis, Perform Laboratory analysis of samples to highlight saturation of chemical elements, Create a clear analysis report per Sample and oil type and Provide proper diagnosis and recommendations.

 

---------------------

 

Analyse d'échantillons d'huile en laboratoire sur des équipements mobiles souterrains : - Collecter des échantillons d'huile usagée chaque semaine, effectuer une analyse en laboratoire des échantillons pour mettre en évidence la saturation des éléments chimiques, créer un rapport d'analyse clair par échantillon et type d'huile et fournir un diagnostic et des recommandations appropriés.

 

26-Jul

50

32509

TRUCK PARK DUST SUPPRESSION

An overview of the KCC truck park where inspection has been conducted by the Engineering Road Maintenance for dust suppression, leading subsequently to the elaboration of the present scope of work. The Scope of Services under this Contract includes, but is not limited to the following: - To provide & applied dust a side(bitumen emulsion) on truck park yard (Area preparation of the +/- 8 000m2 (parking area and section of road)  to suppress dust.
- To Provide Dust Monitor implementation and site supervision.

 

---------------------

 

Aperçu du parc de camions du KCC où une inspection a été menée par l'Ingénierie de l'entretien des routes pour la suppression de la poussière, ce qui a conduit ultérieurement à l'élaboration de la portée actuelle des travaux. La portée des services dans le cadre de ce contrat comprend, sans toutefois s'y limiter, les éléments suivants : - Fournir et appliquer de la poussière sur un côté (émulsion de bitume) sur le parc de camions (préparation de la zone de +/- 8 000 m2 (aire de stationnement et section de route) pour supprimer la poussière.
- Assurer la mise en œuvre du Dust Monitor et la supervision du site.

 

26-Jul

51

32468

KTO Access Control Upgrade-Civil works.

KCC Workforce Management Systems has installed biometric equipment on a part of KCC sites. The recommendation from the OEM and Auditors is that to install biometric equipment on all KCC access control point, which should be cover all KCC sites. The purpose of the work is to prepare the supports for the biometric equipment (turnstiles, boom gates and goosenecks) which should be installed on each KTO access point.

 

---------------------

 

KCC Workforce Management Systems a installé des équipements biométriques sur une partie des sites de KCC. La recommandation du constructeur et des auditeurs est d'installer des équipements biométriques sur tous les points de contrôle d'accès de KCC, qui devraient couvrir tous les sites de KCC. Le but des travaux est de préparer les supports pour les équipements biométriques (tourniquets, portillons et cols de cygne) qui doivent être installés sur chaque point d'accès KTO.

 

26-Jul

52

32051

KCC Light Vehicles Maintenance Support

The Contractor is required to provide highly qualified and experienced personnel, with backgrounds in Mechanical, Electrical and Body worker expertise of Toyota Light vehicles. The focus will be to improve the performance and availability of the Light vehicle fleets. They will increase capability in the maintenance and technical. They should make use of the diagnostic tool when/where required to support the diagnostic of the broken-down equipment. Work will be completed within planned time as well production support equipment availability as required.

 

---------------------

 

L'entrepreneur doit fournir du personnel hautement qualifié et expérimenté, possédant une expérience en mécanique, en électricité et en carrosserie des véhicules légers Toyota. L'accent sera mis sur l'amélioration des performances et de la disponibilité des flottes de véhicules légers. Ils augmenteront les capacités en matière de maintenance et de technique. Ils devront utiliser l'outil de diagnostic lorsque cela est nécessaire pour soutenir le diagnostic de l'équipement en panne. Les travaux seront terminés dans les délais prévus et la disponibilité de l'équipement de soutien à la production sera assurée selon les besoins.

 

26-Jul

53

32460

PaperCut MF Licences

Kamoto Copper Company's using  PaperCut in its NG version, as the complete print management system designed to seamlessly monitor and control resources with easy-to-use administrative and user tools. With the New Version MF, PaperCut goes beyond just print, with the ability to manage and track off-the-glass copier activity, including scan, copy and fax via hardware-level integration.

 

---------------------

 

Kamoto Copper Company utilise PaperCut dans sa version NG, comme système de gestion d'impression complet conçu pour surveiller et contrôler de manière transparente les ressources avec des outils d'administration et d'utilisation faciles à utiliser. Avec la nouvelle version MF, PaperCut va au-delà de la simple impression, avec la possibilité de gérer et de suivre l'activité du copieur hors vitre, y compris la numérisation, la copie et la télécopie via une intégration au niveau du matériel.

 

26-Jul

54

32526

Annual Maintenance of Medical Equipment

Medical equipment is very sensitive and expensive. Medical equipment maintenance is a highly specialized field as this equipment is part of the lifesaving tools. For the above reasons it is essential to perform the appropriate maintenance schedule to extend the lifespan of equipment and to ensure complying with the DRC regulation. Provide annual maintenance and repair of faulty medical equipment. Provide certificates and report after service.

 

---------------------

 

Les équipements médicaux sont très sensibles et coûteux. La maintenance des équipements médicaux est un domaine hautement spécialisé car ces équipements font partie des outils de sauvetage. Pour les raisons susmentionnées, il est essentiel d'effectuer le programme de maintenance approprié pour prolonger la durée de vie des équipements et garantir le respect de la réglementation de la RDC. Assurer l'entretien annuel et la réparation des équipements médicaux défectueux. Fournir des certificats et un rapport après l'entretien.

 

26-Jul

55

32456

KTC Raceways repair

The KTC Overhead cranes at Kamoto Copper Company play a crucial role in our business operations. They are directly involved in the handling process, supporting production within the flotation building. Consequently, any defects in the raceways can result in both production and safety losses. To proactively prevent and mitigate these risks, KCC has established a preventive maintenance program. Under this program, regular inspections are conducted, and any identified defects are promptly repaired. Additionally, every six months, the raceways undergo certification by OCC, the sole accredited government certification organization.

 

---------------------

 

Les ponts roulants KTC de Kamoto Copper Company jouent un rôle crucial dans nos opérations commerciales. Ils sont directement impliqués dans le processus de manutention, en soutenant la production dans le bâtiment de flottation. Par conséquent, tout défaut dans les chemins de roulement peut entraîner des pertes de production et de sécurité. Pour prévenir et atténuer ces risques de manière proactive, KCC a mis en place un programme de maintenance préventive. Dans le cadre de ce programme, des inspections régulières sont effectuées et tout défaut identifié est rapidement réparé. De plus, tous les six mois, les chemins de roulement sont certifiés par l'OCC, le seul organisme de certification gouvernemental accrédité.

 

26-Jul

56

32465

PUMPS AND ELECTRICAL MOTORS REPAIR, MTN

As KCC does not have an in-house team to carry out the rebuild of pumps and electric motors, it is useful to have this important task carried out by an external service provider to ensure this critical support for operations and particularly for the production equipment maintenance. Also, especially because the deep purpose is to have the Control of standards and components rebuild procedures to become consistent across the entire organization, with as consequences, to have more efficiency, expecting that the quality of repairs and installations is higher, and more consistency exists in the approach to asset management and equipment reliability.
This leads to the Production Costs reducing by improving the Total Cost of pumps' Ownership and pumping systems used at KCC through the best management of assets by bests practices in components refurbishment.

 

---------------------

 

Comme KCC ne dispose pas d'une équipe interne pour effectuer la reconstruction des pompes et des moteurs électriques, il est utile de confier cette tâche importante à un prestataire externe pour assurer ce support critique aux opérations et notamment à la maintenance des équipements de production. En outre, en particulier parce que l'objectif profond est de faire en sorte que le contrôle des normes et des procédures de reconstruction des composants soit cohérent dans toute l'organisation, avec pour conséquences une plus grande efficacité, en espérant que la qualité des réparations et des installations soit plus élevée, et qu'il existe une plus grande cohérence dans l'approche de la gestion des actifs et de la fiabilité des équipements.Cela conduit à une réduction des coûts de production en améliorant le coût total de possession des pompes et des systèmes de pompage utilisés chez KCC grâce à une meilleure gestion des actifs par les meilleures pratiques en matière de remise à neuf des composants.

 

26-Jul

57

32453

KCC Fleet Maintenance Support

The following activities have been identified and SKM management is seeking the technical uplift to these KPIs by the Service Provider, resulting in an uplifting of the overall performance across the Shovel, Haul Truck fleets, Dozers .
- Planned maintenance across the Shovel (CAT 6015, 6030) and Haul Trucks (CAT,793D, 777 G & 777 E ) fleets plus ancillary equipment (Dozers D10):
- Executing the right maintenance strategy across these mentioned fleet must deliver the targeted performance levels 1:

 

---------------------

 

 Les activités suivantes ont été identifiées et la direction de SKM cherche à obtenir une amélioration technique de ces KPI par le prestataire de services, ce qui entraînera une amélioration des performances globales des flottes de pelles, de camions de transport et de bulldozers.
- Maintenance planifiée sur les flottes de pelles (CAT 6015, 6030) et de camions de transport (CAT, 793D, 777 G et 777 E) ainsi que sur les équipements auxiliaires (bulldozers D10) :
- L'exécution de la bonne stratégie de maintenance sur ces flottes mentionnées doit permettre d'atteindre les niveaux de performance ciblés conformément au tableau 1 :

 

26-Jul

58

32451

KCC Fleet Maintenance Support

The following activities have been identified and SKM management is seeking the technical uplift to these KPIs by the Service Provider, resulting in an uplifting of the overall performance across the Shovel, Haul Truck fleets, Dozers .
- Planned maintenance across the Shovel (CAT 6015, 6030) and Haul Trucks (CAT,793D, 777 G & 777 E ) fleets plus ancillary equipment (Dozers D10):
- Executing the right maintenance strategy across these mentioned fleet must deliver the targeted performance levels. :

 

---------------------

 

Les activités suivantes ont été identifiées et la direction de SKM cherche à obtenir une amélioration technique de ces KPI par le prestataire de services, ce qui entraînera une amélioration des performances globales des flottes de pelles, de camions de transport et de bulldozers.
- Maintenance planifiée sur les flottes de pelles (CAT 6015, 6030) et de camions de transport (CAT, 793D, 777 G et 777 E) ainsi que sur les équipements auxiliaires (bulldozers D10) :
- L'exécution de la bonne stratégie de maintenance sur ces flottes mentionnées doit permettre d'atteindre les niveaux de performance ciblés.

 

26-Jul

59

32464

Sandblasting Services for Pumps, Motors,

to provide on-site service that will ensure the sandblasting of components, machineries’ frames, welded fabrications, pumps, valves, scaffolding elements, etc. and supply paint to deliver built or rebuilt equipment by central workshop to the end user in a professional way, close to original manufactures’ standards. This works under this Contract include, but not limited to the following:
• To do grit blasting or abrasive media cleaning of pumps, motors, scaffold elements, valves. ISO 8501 and associated references.
• To do grit blasting of metal manufactured components
• To do grit blasting of metal scaffolding elements
• To apply an undercoat on equipment blasted
• To apply final coat of paint as per paint spec for different sections
• To grit blasting for any section with in KCC that are doing refurbishment of a section in their plants
• Conduct Housekeeping daily.

 

---------------------

 

fournir un service sur site qui assurera le sablage des composants, des châssis de machines, des fabrications soudées, des pompes, des vannes, des éléments d'échafaudage, etc. et fournira de la peinture pour livrer l'équipement construit ou reconstruit par l'atelier central à l'utilisateur final de manière professionnelle, proche des normes des fabricants d'origine. Les travaux dans le cadre de ce contrat comprennent, mais sans s'y limiter, les éléments suivants :
• Réaliser un sablage ou un nettoyage par abrasif des pompes, moteurs, éléments d'échafaudage, vannes. ISO 8501 et références associées.
• Réaliser un sablage de composants métalliques fabriqués
• Réaliser un sablage d'éléments d'échafaudage métalliques
• Appliquer une sous-couche sur l'équipement sablé
• Appliquer une couche finale de peinture selon les spécifications de peinture pour différentes sections
• Réaliser un sablage pour toute section de KCC qui effectue la remise à neuf d'une section de ses usines
• Effectuer le ménage quotidien

 

26-Jul

60

32503

BUSH CLEARING UNDER OVER HEAD LINES

KCC has some electrical overhead line and substations around which grasses grows. To avoid entrance of animals which can causes short-circuit and for area housekeeping of HV switchyard and substations, bush cleaning must be done. Bush cleaning is also important for avoiding any disturbance on electrical grid due to bush fire. • Weeding of defined surface using hoe or machete;
• Stumping shrubs;
• Trashes removal;
• On 120kV Overhead lines weeding will be done on a corridor of 20 m or 40m (i.e. 10m or 20m of each side from line axe’s);
• On 15kV Overhead line weeding will be done on a corridor of 8 m, i.e. 4m of each side from line axe’s;
• Bush cleaning must be done twice a year exceptionally for:
- Substation 7; New Luilu derivation; Old Luilu derivation; Mupine sectionning switchyard; Luilu HV main substation; KOV Aire A main substation & Cogeneration; DSK KOV.                                                                                                                             

 

---------------------

 

KCC possède des lignes aériennes et des sous-stations électriques autour desquelles poussent des herbes. Pour éviter l'entrée d'animaux qui peuvent provoquer des courts-circuits et pour l'entretien de la zone du poste de commutation HT et des sous-stations, un nettoyage des buissons doit être effectué. Le nettoyage des buissons est également important pour éviter toute perturbation du réseau électrique due aux feux de brousse. • Désherbage de la surface définie à l'aide d'une houe ou d'une machette ;
• Élagage des arbustes ;
• Enlèvement des déchets ;
• Sur les lignes aériennes de 120 kV, le désherbage sera effectué sur un couloir de 20 m ou 40 m (soit 10 m ou 20 m de chaque côté des axes des lignes) ;
• Sur les lignes aériennes de 15 kV, le désherbage sera effectué sur un couloir de 8 m, soit 4 m de chaque côté des axes des lignes ;
• Le nettoyage des buissons doit être effectué deux fois par an à titre exceptionnel pour :
- Poste 7 ; Nouvelle dérivation de Luilu ; Ancienne dérivation de Luilu ; Sectionnement du poste de commutation de Mupine ; Poste principal HT de Luilu ; Poste principal KOV Aire A et cogénération ; DSK KOV.

 

26-Jul

61

32516

Leased line connection Vision to Luilu

Kamoto Copper Company will loan new offices in Town at the Vision building near Jambo Mart. That office will contain around 200 people that will need to access site shared resource’s (Printing, ERP, Servers, Files shared, Applications).  A 60 Mbps leased line connection is required.

 

---------------------

 

Kamoto Copper Company prêtera de nouveaux bureaux dans la ville, dans le bâtiment Vision, près de Jambo Mart. Ce bureau abritera environ 200 personnes qui auront besoin d'accéder aux ressources partagées du site (impression, ERP, serveurs, fichiers partagés, applications). Une connexion par ligne louée de 60 Mbps est requise.

 

26-Jul

62

32550

EW CATHODES BLANKS REPAIR

Cathodes refurbishment will improve current efficiency at Cu EW.
This scope of works details the steps the contractor must undertake to refurbish cathodes. This Scope of Services under this Contract include, but not limited to the following:
• Transportation of cathodes from site (Luilu Refinery) to workshop.
• Replace cathodes hangar bar (only if needed)
• Straighten cathode blank plate.
• Cathode Blank Plate Surface polishing.
• Hanger bar repair (straightening, welding, polishing).
• Hanger bar reconditioning (repair damaged or holed hanger bar).
• Welding of damaged plates (between plate and hanger bar).                                                                                                                                                                                                                                                                                                                                                                                                    

 

---------------------

 

La remise à neuf des cathodes améliorera l'efficacité actuelle à Cu EW.
Ce périmètre de travaux détaille les étapes que l'entrepreneur doit suivre pour remettre à neuf les cathodes. Ce périmètre de services dans le cadre de ce contrat comprend, sans s'y limiter, les éléments suivants :
• Transport des cathodes du site (raffinerie de Luilu) à l'atelier.
• Remplacement de la barre de suspension des cathodes (uniquement si nécessaire)
• Redressement de la plaque vierge de la cathode.
• Polissage de la surface de la plaque vierge de la cathode.
• Réparation de la barre de suspension (redressement, soudage, polissage).
• Remise en état de la barre de suspension (réparation de la barre de suspension endommagée ou trouée).
• Soudure de plaques endommagées (entre la plaque et la barre de suspension).
• Transport des cathodes de l'atelier au site (raffinerie de Luilu).
• Le nombre total de cathodes à remettre à neuf est de 20 000 ébauches
• Transportation of cathodes from workshop to site (Luilu Refinery).
• Total Number of Cathodes to refurbish is 20000 blanks

 

26-Jul

63

32560

Fire Fighting - Level 1

The purpose of this Request for Proposal is to select suitable training provider and establish the contract of training agreement with successful company for the provision of conducting CERTIFIED FIRE FIGHTING1 nfpa ALIGNED TRAINING TO EMERGENCY RESPONSE TEAM. To this end, Training and Development department is currently seeking to establish an agreement with an accredited training provider who can provide training on site to the Emergency Response Team Fire Fighting 1 that is aligned with the international accreditation of National Fire Protection Association® (NFPA®) standards – NFPA 1001 and Hazmat awareness – NFPA 472.

 

---------------------

 

L'objectif de cette demande de proposition est de sélectionner un prestataire de formation approprié et d'établir le contrat de convention de formation avec l'entreprise retenue pour la prestation de formations CERTIFIED FIRE FIGHTING1 NFPA ALIGNED TRAINING TO EMERGENCY RESPONSE TEAM. A cette fin, le département Formation et Développement cherche actuellement à établir un accord avec un prestataire de formation accrédité qui peut fournir une formation sur site à l'équipe d'intervention d'urgence Fire Fighting 1 qui est conforme à l'accréditation internationale des normes de la National Fire Protection Association® (NFPA®) - NFPA 1001 et à la sensibilisation aux matières dangereuses - NFPA 472

 

26-Jul

64

32509

TRUCK PARK DUST SUPPRESSION

To provide & applied dust a side(bitumen emulsion) on truck park yard (Area preparation of the +/- 8 000m2 (parking area and section of road)  to suppress dust.

 

---------------------

 

Fournir et appliquer de la poussière sur un côté (émulsion de bitume) sur la cour du parc de camions (préparation de la zone de +/- 8 000 m2 (aire de stationnement et tronçon de route) pour supprimer la poussière. Assurer la mise en œuvre du Dust Monitor et la supervision du site
To Provide Dust Monitor implementation and site supervision

 

21-Jun

65

32468

KTO Access Control Upgrade-Civil works.

The purpose of the work is to prepare the supports for the biometric equipment (turnstiles, boom gates, breathalyzers) and rebuild a new shed which can be contain a lot of employees.

 

---------------------

 

Le but des travaux est de préparer les supports pour les équipements biométriques (tourniquets, barrières à flèche, alcootests) et de reconstruire un nouveau hangar pouvant contenir de nombreux employés.

 

21-Jun

66

32051

KCC Light Vehicles Maintenance Support

The Contractor is required to provide highly qualified and experienced personnel, with backgrounds in Mechanical, Electrical and Body worker expertise of Toyota Light vehicles. The focus will be to improve the performance and availability of the Light vehicle fleets. They will increase capability in the maintenance and technical. They should make use of the diagnostic tool when/where required to support the diagnostic of the broken-down equipment. Work will be completed within planned time as well production support equipment availability as required.

 

---------------------

 

L'entrepreneur doit fournir du personnel hautement qualifié et expérimenté, possédant une expérience en matière d'expertise en mécanique, électricité et carrosserie des véhicules légers Toyota. L'accent sera mis sur l'amélioration des performances et de la disponibilité des flottes de véhicules légers. Ils augmenteront les capacités de maintenance et techniques. Ils doivent utiliser l'outil de diagnostic lorsque cela est nécessaire pour faciliter le diagnostic de l'équipement en panne. Les travaux seront terminés dans les délais prévus ainsi que la disponibilité des équipements de soutien à la production, selon les besoins.

 

21-Jun

67

32460

PaperCut MF Licences

PaperCut NG/MF is a comprehensive print management system designed to seamlessly monitor and control your resources with easy to use administrative and user tools that can be securely accessed from anywhere on the network though a web browser.The PaperCut user client is used to: Deliver notifications/messages for denied print jobs, jobs held in the release station, etc. Display print job popups for account selection or print confirmation. Display print job popups as directed by printer scripts (Advanced Scripting).

 

---------------------

 

PaperCut NG/MF est un système complet de gestion de l'impression conçu pour surveiller et contrôler de manière transparente vos ressources avec des outils d'administration et utilisateur faciles à utiliser et accessibles en toute sécurité depuis n'importe où sur le réseau via un navigateur Web.Le client utilisateur PaperCut est utilisé pour : Envoyer des notifications/messages pour les travaux d'impression refusés, les travaux retenus dans la station de libération, etc. Afficher les fenêtres contextuelles des travaux d'impression pour la sélection du compte ou la confirmation de l'impression. Afficher les fenêtres contextuelles des tâches d'impression selon les instructions des scripts d'imprimante (Advanced Scripting).

 

21-Jun

68

32526

Annual Maintenance of Medical Equipment

Provide annual maintenance and repair of faulty medical equipment. Provide certificates and report after service.

 

---------------------

 

Assurer l’entretien et la réparation annuels des équipements médicaux défectueux. Fournir des certificats et un rapport après service.

 

21-Jun

69

32456

Compressors  Service and Maintenance

Preventive Maintenance.

 

---------------------

 

Maintenance préventive.

 

21-Jun

70

32465

PUMPS AND ELECTRICAL MOTORS REPAIR, MTN

Ensure the repair, rebuild/refurbishment of all categories of pumps: submersibles, stationaries, etc. and reconditioning of electric motors from KCC factories: plants and/or mines. Ensure the collection, by boom-truck, of broken components (pumps, electric motors, etc.) from the factories to the central Workshops as well as the delivery of the repaired components to the storage location where users can collect them.

 

---------------------

 

Assurer la réparation, la reconstruction/remise à neuf de toutes catégories de pompes : submersibles, fixes, etc. et le reconditionnement des moteurs électriques des usines KCC : usines et/ou mines.Assurer la collecte, par camion-grue, des composants cassés (pompes, moteurs électriques, etc.) des usines vers les Ateliers centraux ainsi que l'acheminement des composants réparés vers le lieu de stockage où les utilisateurs pourront les récupérer

 

21-Jun

71

32453

KCC Fleet Maintenance Support

The following activities have been identified and SKM management is seeking the technical uplift to these KPIs by the Service Provider, resulting in an uplifting of the overall performance across the Shovel, Haul Truck fleets, Dozers .
- Planned maintenance across the Shovel (CAT 6015, 6030) and Haul Trucks (CAT,793D, 777 G & 777 E ) fleets plus ancillary equipment (Dozers D10):
- Executing the right maintenance strategy across these mentioned fleet must deliver the targeted performance levels as per table 1

 

---------------------

 

Les activités suivantes ont été identifiées et la direction de SKM recherche une amélioration technique de ces KPI par le fournisseur de services, ce qui entraînera une amélioration des performances globales des flottes de pelles, de camions de transport et de bulldozers.
- Maintenance planifiée sur les flottes de pelles (CAT 6015, 6030) et de camions de transport (CAT, 793D, 777 G et 777 E) ainsi que les équipements auxiliaires (Dozers D10) :
- L'exécution de la bonne stratégie de maintenance sur la flotte mentionnée doit fournir les niveaux de performance visés selon le tableau 1 :

 

21-Jun

72

32451

KCC Fleet Maintenance Support

The following activities have been identified and SKM management is seeking the technical uplift to these KPIs by the Service Provider, resulting in an uplifting of the overall performance across the Shovel, Haul Truck fleets, Dozers .
- Planned maintenance across the Shovel (CAT 6015, 6030) and Haul Trucks (CAT,793D, 777 G & 777 E ) fleets plus ancillary equipment (Dozers D10):
- Executing the right maintenance strategy across these mentioned fleet must deliver the targeted performance levels as per table 1

 

---------------------

 

The following activities have been identified and SKM management is seeking the technical uplift to these KPIs by the Service Provider, resulting in an uplifting of the overall performance across the Shovel, Haul Truck fleets, Dozers .
- Planned maintenance across the Shovel (CAT 6015, 6030) and Haul Trucks (CAT,793D, 777 G & 777 E ) fleets plus ancillary equipment (Dozers D10):
- Executing the right maintenance strategy across these mentioned fleet must deliver the targeted performance levels as per table 1:

 

21-Jun

73

32464

Sandblasting Services for Pumps, Motors,

This works under this Contract include, but not limited to the following:

• To do grit blasting or abrasive media cleaning of pumps, motors, scaffold elements, valves. ISO 8501 and associated references.
• To do grit blasting of metal manufactured components
• To do grit blasting of metal scaffolding elements
• To apply an undercoat on equipment blasted
• To apply final coat of paint as per paint spec for different sections
• To grit blasting for any section with in KCC that are doing refurbishment of a section in their plants
• Conduct Housekeeping daily.

 

---------------------

 

Les travaux dans le cadre de ce contrat comprennent, sans s'y limiter, les éléments suivants :

• Pour effectuer le nettoyage par grenaillage ou avec des agents abrasifs de pompes, moteurs, éléments d'échafaudage, vannes. ISO 8501 et références associées.
• Pour effectuer le grenaillage de composants fabriqués en métal
• Pour réaliser le grenaillage d'éléments d'échafaudages métalliques
• Appliquer une sous-couche sur du matériel sablé
• Appliquer la couche finale de peinture selon les spécifications de peinture pour différentes sections.
• Pour le sablage de toute section de KCC qui effectue la rénovation d'une section de ses usines.
• Effectuer le ménage quotidiennement

 

21-Jun

74

32503

BUSH CLEARING UNDER OVER HEAD LINES

• Weeding of defined surface using hoe or machete;
• Stumping shrubs;
• Trashes removal;
• On 120kV Overhead lines weeding will be done on a corridor of 20 m or 40m (i.e. 10m or 20m of each side from line axe’s);
• On 15kV Overhead line weeding will be done on a corridor of 8 m, i.e. 4m of each side from line axe’s;
• Bush cleaning must be done twice a year exceptionally for:
- Substation 7;
- New Luilu derivation;
- Old Luilu derivation;
- Mupine sectionning switchyard;
- Luilu HV main substation;
- KOV Aire A main substation & Cogeneration;
- DSK KOV.

 

---------------------

 

• Désherbage d'une surface définie à la houe ou à la machette ;
• Arbustes dessouchants ;
• Enlèvement des déchets ;
• Sur les lignes aériennes 120kV, le désherbage se fera sur un couloir de 20 m ou 40 m (soit 10 m ou 20 m de chaque côté des axes de ligne) ;
• Sur 15kV, le désherbage des lignes aériennes se fera sur un couloir de 8 m, soit 4 m de chaque côté des axes de ligne ;
• Le nettoyage des buissons doit être effectué deux fois par an exceptionnellement pour :
- Sous-station 7 ;
- Nouvelle dérivation Luilu ;
- Ancienne dérivation Luilu ;
- Poste de sectionnement de Mupine ;
- Poste principal HT de Luilu ;
- KOV Aire A poste principal & Cogénération ;
-DSK KOV.

 

21-Jun

75

32516

Leased line connection Vision to Luilu

Build a 60Mbps bandwidth leased line to link   Luilu site to La vision.

 

---------------------

 

Construire une ligne louée de bande passante de 60 Mbps pour relier le site Luilu à La vision.

 

21-Jun

76

32476

SUPPLY AND POURING ASPHALT FOR POTHOLES

• The contractor will supply 120 tons of asphalt (bitumen grade 60/70 & grade 80/100) for 6 months.
• The Contractor must supply with his truck on KCC site.
• The Contractor should organize pouring of asphalt on KCC site.
• Mobilisation and demobilisation
• Fully quality and quantity required asphalt.
• Work permits and visas if necessary.
• Copies and records of induction, training, competency, medical, etc. upon request by KCC.

 

---------------------

 

• L'entrepreneur fournira 120 tonnes d'asphalte (bitume grade 60/70 et grade 80/100) pendant 6 mois.
• L'Entrepreneur doit approvisionner son camion sur le site de KCC.
• L'entrepreneur doit organiser le coulage de l'asphalte sur le site de KCC.
• Mobilisation et démobilisation
• Enrobé entièrement de qualité et de quantité requis.
• Permis de travail et visas si nécessaire.
• Copies et dossiers d'intégration, de formation, de compétence, médicaux, etc. sur demande de KCC.

 

21-Jun

77

32438

KTC WEAR SLURRY  SERVICE CONTRACT

The summary of the scope of work is described below and includes but not limited to the following: all planning, execution,
 and implementation. The following general scope must be completed by the successful bidder:
1.      Mobilization and Demobilization
2.      Fabrication of new hoppers whenever required.
3.      Sandblasting of hoppers, pipes and mill shells in preparation for the linings
4.      Repairing of steelworks and linings in situ or workshop with rubber or ceramic
5.      Installation of ceramic tiles in hoppers, pipes and boxes.
6.      Rubber lining of boxes, hoppers and pipes.

7.      Provide skilled labour to complete the scope successfully.

 

---------------------

 

Le contractant se concentrera sur la fourniture de tous les besoins en main-d'œuvre compétente, effectuera le service et garantira l'achèvement réussi du service, des installations et de la mise en service pendant une période contractuelle de deux ans.

Le résumé de la portée des travaux est décrit ci-dessous et comprend, entre autres, ce qui suit : toute la planification, l'exécution et la mise en œuvre. La portée générale suivante doit être achevée par le soumissionnaire retenu :
• Mobilisation et Démobilisation
• Fabrication de nouvelles trémies chaque fois que nécessaire.
• Sablage des trémies, tuyaux et coques de broyeurs en préparation des revêtements.
• Réparation des ouvrages en acier et des revêtements sur site ou en atelier avec du caoutchouc ou de la   céramique.
• Installation de carreaux de céramique dans les trémies, les tuyaux et les boîtes.
• Revêtement en caoutchouc des boîtes, trémies et tuyaux.
• Fournir une main-d'œuvre qualifiée pour achever la portée avec succès.

 

21-Jun

78

32393

KCC UG Control Points Check Survey

A 6.1 km close loop traverse from the portal (surface) to Zone 5.
2. Provide a calibration certificate of the Total Station to be used.
3. 1” to 3’’ total station must be used.
4. Provide the data of the traverse length in dxf and the coordinates in excel format.
5. Provide a signed of report on the traverse comparing with KCC coordinates, XYZ.

 

---------------------

 

Le champ d'application de ce projet consiste à réaliser une enquête de vérification par une tierce partie
sur les points de contrôle souterrains afin de vérifier leur précision. L'entrepreneur est tenu de garantir
l'exactitude et le respect des codes réglementaires.
• Un trajet en boucle fermée de 6,1 km depuis le portail (surface) jusqu'à la Zone 5.
• Fournir un certificat d'étalonnage de la station totale à utiliser.
• Une station totale de 1" à 3" doit être utilisée.
• Fournir les données de la longueur de la traverse au format DXF et les coordonnées
au format Excel.
• Fournir un rapport signé sur la traverse en comparant avec les coordonnées XYZ de
KCC.

 

21-Jun

79

32454

KTC Conveyor belt splicing & Vulcanizing

The scope of work for the Conveyor Splicing Contract at KCC’s concentrator department includes but not limited to
the following: all planning, execution, and implementation. The following general scope must be completed by the
contractor:
1.    Mobilization and Demobilization
2. Cold Splicing
3. Mechanical joint (super screw and clips)
4.Hot splicing
5. Belt inserting (pull in and pull out)
6.  Belt Repair(patches)
7. Belt splices inspections.
8. Pully Repairs
9.Maintenance of dribble conveyors
10. Shutdown corrections
11.Feeder work
12.Servicing of three(3) KCC Vulcanizing Press Machines
13. Housekeeping
14.Disposal of scrap as per KCC policy and standards
15.Commissioning

 

---------------------

 

Le champ d'application du contrat de raccordement des convoyeurs au département du concentrateur de KCC comprend, mais ne se limite pas, aux éléments suivants : toute la planification, l'exécution et la mise en œuvre. Le champ d'application général suivant doit être réalisé par l'entrepreneur :

• Mobilisation et Démobilisation
• Raccordement à froid
• Joint mécanique (super vis et clips)
• Raccordement à chaud
• Insertion de la courroie (entrée et sortie)
• Réparation de la courroie (rustines)
• Inspections des raccords de courroies.
• Réparations de poulies
• Maintenance des convoyeurs de résidus
• Corrections lors des arrêts techniques
• Travaux d'alimentation
• Entretien de trois (3) machines de presse à vulcaniser de KCC
• Entretien des locaux
• Élimination des déchets conformément à la politique et aux normes de KCC
• Mise en service

 

21-Jun

80

32449

MUSONOIE COMMUNITY HOUSE SOLAR POWER

The works under this Contract include, but are not limited to Supply, Electrical, Earthing and Lightning, Installation, Wiring, Start and Test Solar Panels, Training, and handover.

 

---------------------

 

Les travaux au titre de ce contrat comprennent, sans s'y limiter, la fourniture, l'électricité, la mise à la terre et la foudre, l'installation, le câblage, le démarrage et le test des panneaux solaires, la formation et la remise.

 

21-Jun

81

21875

Basic PLC training, PLC Level 1 and 2

Basic PLC training, PLC Level 1 and 2.

 

---------------------

 

Formation automate de base, automate niveau 1 et 2

 

24-Nov

82

21905

2023 Dewatering Drilling Project - Horizontal.

The Mine Technical Services Department at Kamoto Copper Company SA (KCC) is currently upgrading the pits lope depressurization infrastructure to ensure adequate draining of the saturated rock mass. The strategy involves the installation of sub-horizontal drainholes into the pit highwalls to improve passive drainage to minimize pore pressure build up behind the pit highwalls. This programme includes the drilling of 7 horizontal drainholes at various stations within the KOV Open Pit using the Reverse Circulation drilling method. The new drainholes will provide additional capacity to depressurize the pit highwalls at strategic locations and controlled flow of seepage zones.

 

---------------------

 

Le département des services techniques miniers de Kamoto Copper Company SA (KCC) modernise actuellement l'infrastructure de dépressurisation des pentes des fosses pour assurer un drainage adéquat de la masse rocheuse saturée. La stratégie implique l'installation de trous de drainage subhorizontaux dans les parois hautes de la fosse pour améliorer le drainage passif afin de minimiser l'accumulation de pression interstitielle derrière les parois hautes de la fosse.Ce programme comprend le forage de 7 trous de drainage horizontaux à diverses stations de la mine à ciel ouvert KOV en utilisant la méthode de forage à circulation inverse. Les nouveaux trous de drainage offriront une capacité supplémentaire pour dépressuriser les parois hautes de la fosse à des endroits stratégiques et contrôler le débit des zones d'infiltration.

Drilling Services

24-Nov

83

21918

Provision of Security Services - CCTV

Kamoto Copper Company (hereinafter called the “Company”) is requesting quotations from reputable security service providers (hereinafter-called the “Contractor”) with a local presence in the Lualaba Province of the DRC for the provision of security officers and supervisory/support personnel to carry out the following duties:
• CCTV and Security Operations Control & Monitoring
Services are to be carried out on Company premises in Kolwezi to guard and protect the Company’s assets and personnel and provide other related security services.

 

---------------------

 

Kamoto Copper Company (ci-après appelée la « Société ») demande des devis à des prestataires de services de sécurité réputés (ci-après appelés le « Contractant ») avec une présence locale dans la province de Lualaba en RDC pour la fourniture d'agents de sécurité et de personnel de supervision/de soutien. pour exercer les missions suivantes :
• Contrôle et surveillance des opérations de vidéosurveillance et de sécurité
Les services doivent être effectués dans les locaux de la Société à Kolwezi pour garder et protéger les actifs et le personnel de la Société et fournir d'autres services de sécurité connexes.

Security Service

24-Nov

84

21844

XPLE Cable, jointing & Terminations

XPLE Cable, jointing & Terminations.

 

---------------------

 

Câble XLPE, jonction et terminaisons

Training

24-Nov

85

21874

VSD G130, SIMOCODE Training

VSD G130, SIMOCODE Training.

 

---------------------

 

VSD G130, formation SIMOCODE

Training

24-Nov

86

21882

Training  on DR-G15-DG \SINAMICS G150/G1

Training  on DR-G15-DG \SINAMICS G150/G1.

 

---------------------

 

Formation sur DR-G15-DG \SINAMICS G150/G1

Training

24-Nov

87

21909

RCdrilling-2024

KCC require services of an external drilling company to render services for Reverse Circulation (RC) Drilling for grade control drilling. The RC drilling forms part of the ongoing plan of filling gaps in the medium-term model and grade control model. Therefore, we need to outsource to ensure quality work is performed to obtain the data for resource evaluation.                                                                                                                                           •The contractor will perform 109 540 m of Reverse Circulation (RC) drilling in KCC OP for grade control purposes.
•Operation and servicing of 4 RC drill rigs (staff, fuel, water etc.) to ensure a 24-hour operation and a target drill rate of 240 m/day per rig.
•Drilling of vertical holes that will be of variable depth (maximum depth 200m) in different zones of the open pits and surface in or outside the KCC lease area.
•Drilling will take place from surface on roads, ramps, benches and dumps, therefore drill rigs should be suitable for slightly sloping surfaces (maximum 10 degrees) and rough terrain. Both wheeled and tracked drill rigs will be considered.
•Equipment, drill techniques and staff skill levels should be suitable to ensure high quality of drilling and sample collection to be conducted ensuring high sample recovery, with MINIMUM contamination and/or sample bias.

 

---------------------

 

KCC a besoin des services d'une société de forage externe pour fournir des services de forage à circulation inverse (RC) pour le forage de contrôle de teneur. Le forage RC fait partie du plan en cours visant à combler les lacunes du modèle à moyen terme et du modèle de contrôle de la teneur. Par conséquent, nous devons externaliser pour garantir qu'un travail de qualité est effectué afin d'obtenir les données nécessaires à l'évaluation des ressources. •L'entrepreneur effectuera 109 540 m de forage à circulation inverse (RC) dans KCC OP à des fins de contrôle de la teneur.
•Exploitation et entretien de 4 foreuses RC (personnel, carburant, eau, etc.) pour assurer un fonctionnement 24 heures sur 24 et un taux de forage cible de 240 m/jour par foreuse.
•Forage de trous verticaux qui seront de profondeur variable (profondeur maximale 200 m) dans différentes zones des fosses à ciel ouvert et en surface à l'intérieur ou à l'extérieur de la zone de concession de KCC.
•Le forage aura lieu à partir de la surface sur des routes, des rampes, des bancs et des décharges. Les appareils de forage doivent donc être adaptés aux surfaces légèrement inclinées (maximum 10 degrés) et aux terrains accidentés. Les appareils de forage sur roues et sur chenilles seront pris en considération.
•L'équipement, les techniques de forage et les niveaux de compétence du personnel doivent être adaptés pour garantir une haute qualité de forage et de collecte d'échantillons à effectuer, garantissant ainsi une récupération élevée des échantillons, avec une contamination MINIMALE et/ou un biais d'échantillonnage.
•L'entrepreneur, supervisé par un technicien en géologie de KCC, entreprendra l'échantillonnage.
• Respecter les bonnes normes de sécurité et environnementales.
• Avoir des normes QAQC élevées.

•The contractor with supervision from a KCC geology technician will undertake sampling.
•Uphold good safety and environmental standards.
•Have high QAQC standards.

Drilling Services

24-Nov

88

21863

Cisco ISE Support Contract

Cisco ISE Support Contract

Training

24-Nov

89

21869

2024 Dewatering well  drilling  project

The Mine Technical Services Department at Kamoto Copper Company SA (KCC) is planning to augment the current dewatering capacity at the KTO underground operations. The 2024 dewatering strategy includes the use of surface boreholes for abstraction of groundwater to lower the water levels and minimize inflows into the underground workings. As part of this programme, one large diameter deep dewatering well will be drilled from surface to intercept the highly permeable strata and structures at KTO underground for the abstraction of groundwater. The new dewatering borehole will provide extra abstraction capacity to the current dewatering infrastructure. The data collected during drilling will add to the information base to assist in the management of the groundwater at KTO. This scope of work is to drill one (1), deep, large diameter dewatering borehole from surface within the KTO mining area. The borehole will be drilled to maximum depth of 500m and completed at 16” final diameter.

 

---------------------

 

Le département des services techniques miniers de Kamoto Copper Company SA (KCC) prévoit d'augmenter la capacité actuelle de déshydratation des opérations souterraines de KTO. La stratégie d'assèchement de 2024 comprend l'utilisation de forages de surface pour le captage des eaux souterraines afin d'abaisser les niveaux d'eau et de minimiser les afflux dans les chantiers souterrains. Dans le cadre de ce programme, un puits de déshydratation profond de grand diamètre sera foré depuis la surface pour intercepter les strates et les structures hautement perméables du sous-sol de KTO pour le captage des eaux souterraines. Le nouveau forage de assèchement fournira une capacité de captage supplémentaire à l’infrastructure de assèchement actuelle. Les données collectées lors du forage s'ajouteront à la base d'informations pour aider à la gestion des eaux souterraines à KTO. Cette portée des travaux consiste à forer un (1) trou de forage d'assèchement profond et de grand diamètre à partir de la surface dans la zone minière de KTO. Le forage sera foré jusqu'à une profondeur maximale de 500 m et complété à un diamètre final de 16 pouces.

Drilling Services

24-Nov

90

21899

KCC VWP Installation FY2024 - VWP Drilling

The Mine Technical Services Department at Kamoto Copper Company SA (KCC) is currently upgrading the groundwater-level and pore-pressure monitoring instrumentation within and around the KOV and Mashamba East Open Pits. The equipment enhances the capacity of the MTS personnel to determine the efficacy of the current dewatering efforts and improve decision making in the selection of targets for additional dewatering and pit slope depressurization infrastructure. As part of this programme, dedicated holes are being drilled and equipped with multilevel vibrating wireline piezometers (VWPs) in the different formations of the permeable fragments that the mining will intersect. The outcomes of this work will provide a refined network of pore pressure and water level monitoring points. The resultant data will be used to alert the KCC Geotech and Hydro teams of any changes in pore pressure and provide information to complimentary studies such as numerical modelling. This scope of work is to drill and install thirty two (32) multilevel VWP sets up to a maximum depth of 300m around the KOV and Mashamba East pits and to install automated datalogging systems. Following the successful drilling of these 32 holes, they will each be equipped with up to 5 VWP sensors at varying depths attached to a 1-inch uPVC casing. All holes should be drilled using a diamond core method at standard PQ diameter size.

 

---------------------

 

Le département des services techniques miniers de Kamoto Copper Company SA (KCC) améliore actuellement les instruments de surveillance du niveau des eaux souterraines et de la pression interstitielle à l'intérieur et autour des mines à ciel ouvert KOV et Mashamba Est. L'équipement améliore la capacité du personnel de MTS à déterminer l'efficacité des efforts de déshydratation actuels et à améliorer la prise de décision dans la sélection de cibles pour des infrastructures supplémentaires de déshydratation et de dépressurisation des pentes de la fosse. Dans le cadre de ce programme, des trous dédiés sont forés et équipés de piézomètres à fil vibrant (VWP) multiniveaux dans les différentes formations de fragments perméables que l'exploitation minière recoupera. Les résultats de ces travaux fourniront un réseau raffiné de points de surveillance de la pression interstitielle et du niveau d’eau. Les données obtenues seront utilisées pour alerter les équipes KCC Geotech et Hydro de tout changement dans la pression interstitielle et fournir des informations à des études complémentaires telles que la modélisation numérique. Cette portée des travaux consiste à forer et à installer trente-deux (32) installations VWP multiniveaux jusqu'à une profondeur maximale de 300 m autour des fosses KOV et Mashamba Est et à installer des systèmes d'enregistrement de données automatisés. Après le forage réussi de ces 32 trous, ils seront chacun équipés de jusqu'à 5 capteurs VWP à différentes profondeurs fixés à un boîtier en PVC de 1 pouce. Tous les trous doivent être percés à l’aide d’une méthode de carottage au diamant avec un diamètre PQ standard.

Drilling Services

24-Nov

91

21900

2024 Dewatering Drilling Project - Horizontal

The Mine Technical Services Department at Kamoto Copper Company SA (KCC) is currently upgrading the pits lope depressurization infrastructure to ensure adequate draining of the saturated rock mass. The strategy involves the installation of sub-horizontal drainholes into the pit highwalls to improve passive drainage to minimize pore pressure build up behind the pit highwalls. This programme includes the drilling of 34 horizontal drainholes at various stations within the KOV Open Pit. The new drainholes will provide additional capacity to depressurize the pit highwalls at strategic locations and controlled flow of seepage zones. This scope of work is to drill 34 horizontal drainholes into the pit highwalls within the KOV open pit. Each drainhole will be drilled to a maximum length of 300m and completed at HQ diameter.

 

---------------------

 

Le département des services techniques miniers de Kamoto Copper Company SA (KCC) modernise actuellement l'infrastructure de dépressurisation des pentes des fosses pour assurer un drainage adéquat de la masse rocheuse saturée. La stratégie implique l'installation de trous de drainage subhorizontaux dans les parois hautes de la fosse pour améliorer le drainage passif afin de minimiser l'accumulation de pression interstitielle derrière les parois hautes de la fosse. Ce programme comprend le forage de 34 trous de drainage horizontaux à diverses stations de la mine à ciel ouvert KOV. Les nouveaux trous de drainage offriront une capacité supplémentaire pour dépressuriser les parois hautes de la fosse à des endroits stratégiques et contrôler le débit des zones d'infiltration. Cette portée des travaux consiste à forer 34 trous de drainage horizontaux dans les parois hautes de la fosse à ciel ouvert KOV. Chaque trou de drainage sera foré sur une longueur maximale de 300 m et complété au diamètre du QG.

Drilling Services

24-Nov

92

21916

SAPATELO 2 nd BOREHOLE CLEANING

The scope will include but not limited to the following: Hydrogeological study, Supply of all equipments required for the cleaning, Non-stop airlift , Reinstallation of the solar pump and water column, connect to the existing elevated water tanks at SAPATELO village, Commissioning and finally Handover. Note that all operations shall follow KCC Specifications and Site Instructions.

 

---------------------

 

La portée comprendra, mais sans s'y limiter, les éléments suivants : Étude hydrogéologique, Fourniture de tous les équipements nécessaires au nettoyage, Pont aérien non-stop, Réinstallation de la pompe solaire et de la colonne d'eau, connexion aux réservoirs d'eau surélevés existants au village SAPATELO, Mise en service et enfin la remise. Notez que toutes les opérations doivent suivre les spécifications et les instructions du site KCC.

Drilling Services

24-Nov

93

21903

PRODUCT LINK HARDWARE AND SOFTWARE SUPPLY

This scope of work describes the works required for supplying and installing the Product Link system hardware and software systems onto quantity twelve of KCC critical generators. The Contractor to perform the works must have a letter of confirmation that he/she is a reseller and installer of the Caterpillar MineStar software systems.

 

---------------------

 

Cette étendue des travaux décrit les travaux requis pour la fourniture et l'installation des systèmes matériels et logiciels du système Product Link sur une quantité de douze générateurs critiques KCC. L'entrepreneur chargé d'exécuter les travaux doit avoir une lettre de confirmation qu'il est un revendeur et installateur des systèmes logiciels Caterpillar MineStar.

Mining Services

24-Nov

94

21901

2024 Dewatering Drilling Project  - Dra

The Mine Technical Services Department at Kamoto Copper Company SA (KCC) is planning to augment the current dewatering capacity at the KOV Open Pit. A new strategy involves the installation of a series of vertical RC holes to form a drainage adit from KOV pit into the KTO underground workings in order to depressurize the KOV pit bottom formations. As part of this programme, 65 small diameter RC boreholes will be drilled at the toe of KOV Cut 4/5B for the free draining of groundwater into the KTO underground workings. This drainage adit will provide extra abstraction capacity to the current dewatering infrastructure and aid in depressurization of the pit bottom hydrostratigraphy. The data collected during drilling will add to the information base to assist in the management of the groundwater at KCC. This scope of work is to drill sixty five (65), small diameter RC boreholes at the toe of KOV Cut 4/5B. The boreholes will each be drilled to maximum depth of 150m and completed at 4” final diameter.

 

---------------------

 

Le département des services techniques miniers de Kamoto Copper Company SA (KCC) prévoit d'augmenter la capacité actuelle de déshydratation de la mine à ciel ouvert KOV. Une nouvelle stratégie implique l'installation d'une série de trous RC verticaux pour former une galerie de drainage depuis la fosse KOV vers les chantiers souterrains de KTO afin de dépressuriser les formations du fond de la fosse KOV. Dans le cadre de ce programme, 65 forages RC de petit diamètre seront forés au pied de KOV Cut 4/5B pour le drainage libre des eaux souterraines dans les chantiers souterrains de KTO. Cette galerie de drainage fournira une capacité de captage supplémentaire à l'infrastructure de déshydratation actuelle et contribuera à la dépressurisation de l'hydrostratigraphie du fond de la fosse. Les données collectées lors du forage s'ajouteront à la base d'informations pour aider à la gestion des eaux souterraines de KCC. Cette portée des travaux consiste à forer soixante-cinq (65) trous de forage RC de petit diamètre au pied de KOV Cut 4/5B. Les trous de forage seront chacun forés à une profondeur maximale de 150 m et complétés à un diamètre final de 4 pouces.

Drilling Services

24-Nov

95

21898

2024 Dewatering Drilling Project - KTO

The Mine Technical Services Department (MTS) at Kamoto Copper Company SA (KCC) is currently upgrading the groundwater-level and pore-pressure monitoring instrumentation within and around the KTO underground operations. The equipment enhances the capacity of the MTS personnel to determine the efficacy of the current dewatering efforts and improve decision making in the selection of targets for additional dewatering and depressurization infrastructure. As part of this programme, four dedicated deep holes are planned for drilling and equipping with multilevel vibrating wireline piezometers (VWPs) in the different formations of the permeable fragments that the mining will intersect. The outcomes of this work will provide a refined network of pore pressure and water level monitoring points. The resultant data will be used to alert the KCC Geotech and Hydro teams of any changes in pore pressure and provide information to complimentary studies such as numerical modelling. This scope of work is to drill and install four (4) multilevel VWP sets up to a maximum depth of 500m from surface at KTO underground operations and to install automated datalogging systems. Following the successful drilling of these 4 holes, they will each be equipped with up to 7 VWP sensors at varying depths attached to a 1-inch uPVC casing. All holes should be drilled using a diamond core method at standard PQ diameter size.

 

---------------------

 

Le Département des services techniques miniers (MTS) de Kamoto Copper Company SA (KCC) améliore actuellement les instruments de surveillance du niveau des eaux souterraines et de la pression interstitielle à l'intérieur et autour des opérations souterraines de KTO. L'équipement améliore la capacité du personnel de MTS à déterminer l'efficacité des efforts de déshydratation en cours et à améliorer la prise de décision dans la sélection de cibles pour des infrastructures de déshydratation et de dépressurisation supplémentaires. Dans le cadre de ce programme, quatre trous profonds dédiés sont prévus pour le forage et l'équipement de piézomètres à câble vibrant (VWP) multiniveaux dans les différentes formations de fragments perméables que l'exploitation minière recoupera. Les résultats de ces travaux fourniront un réseau raffiné de points de surveillance de la pression interstitielle et du niveau d’eau. Les données obtenues seront utilisées pour alerter les équipes KCC Geotech et Hydro de tout changement dans la pression interstitielle et fournir des informations à des études complémentaires telles que la modélisation numérique. Cette portée des travaux consiste à forer et à installer quatre (4) installations VWP à plusieurs niveaux jusqu'à une profondeur maximale de 500 m de la surface dans les opérations souterraines de KTO et à installer des systèmes automatisés d'enregistrement des données. Après le forage réussi de ces 4 trous, ils seront chacun équipés de jusqu'à 7 capteurs VWP à différentes profondeurs fixés à un boîtier en PVC de 1 pouce. Tous les trous doivent être percés à l’aide d’une méthode de carottage au diamant avec un diamètre PQ standard.

Drilling Services

24-Nov

96

21906

PRINTING.

KCC Open pit mining operations has been experiencing in relation to tire care hence as part of the various initiatives being implemented to advance better tire care on heavy mobile equipment. This scope is part of a campaign to make imformation about tire care easily accessible to all employees at open pit mining.

 

---------------------

 

Les opérations minières à ciel ouvert de KCC ont connu des difficultés en matière d'entretien des pneus, dans le cadre des diverses initiatives mises en œuvre pour améliorer l'entretien des pneus sur les équipements mobiles lourds. Cette portée fait partie d'une campagne visant à rendre les informations sur l'entretien des pneus facilement accessibles à tous les employés. dans les mines à ciel ouvert.

Mining Service

17-Nov

97

21897

SKM BUCKETS,BLADES & DUMP TRAYS REPAIR

BUCKETS, BLADES & DUMP TRAYS REPAIR.

 

---------------------

 

RÉPARATION DE GODETS, LAMES ET BACS À BENNE.

Mining Maintenance

17-Nov

98

21907

WW Admin Training for 2023

To Provide training to Watu Wetu Staff as per they annually and casual plans approved and budgetized.

 

---------------------

 

Fournir une formation au personnel de Watu Wetu conformément aux plans annuels et occasionnels approuvés et budgétisés.

Training

17-Nov

99

21896

PPE Supply and Services

The Contractor is to establish a full time Personal Protective Equipment "PPE" operation at the Company's site situated in Kolwezi, DRC.

 

---------------------

 

L'entrepreneur doit fournir un service d'équipement de protection individuelle « EPI » à temps plein sur le site de la société situé à Kolwezi, en RDC.

EPI

17-Nov

100

21876

Agilent - Basic MTN and Trouble Shooting.

Agilent - Basic MTN and Trouble Shooting.

 

---------------------

 

Agilent - MTN de base et dépannage

Training

17-Nov

101

21882

Training on DR-G15-DG \SINAMICS G150/G1

Training  on DR-G15-DG \SINAMICS G150/G1. Formation sur DR-G15-DG \SINAMICS G150/G1

Training

17-Nov

102

21912

Project Phoenix: Asset Reliability and M

The purpose of this contract is for the selected supplier to provide KCC with complete and comprehensive maintenance documentation, for all fixed and mobile equipment across KCC. This documentation shall include maintenance manuals, detailed bill of materials (BOM), and comprehensive fit for purpose maintenance strategy recommendations. The format of this documentation shall be aligned with the current KCC Electronic Document Management System (EDMS) and will be absorbed into the system to be used by all planning, maintenance, and reliability departments within KCC.
While this project is to be completed as a singular body of work it can be separated into two (2) primary pillars, namely inventory and maintenance. While these pillars can be worked on separately it is highly advised that referencing and communication between the two is maximised to ensure seamless operations. The project will be completed in phases in order to break down the work and do manageable portions at a time. While explanation of all phases are provided in this document the SOW to be bid on at the time of release is only phase 1.

 

---------------------

 

L'objectif de ce contrat est que le fournisseur sélectionné fournisse à KCC une documentation de maintenance complète et complète, pour tous les équipements fixes et mobiles de KCC. Cette documentation doit inclure des manuels de maintenance, une nomenclature détaillée (BOM) et des recommandations complètes en matière de stratégie de maintenance adaptée à l'usage prévu. Le format de cette documentation doit être aligné sur le système de gestion électronique des documents (EDMS) actuel de KCC et sera intégré dans le système qui sera utilisé par tous les départements de planification, de maintenance et de fiabilité de KCC.
Bien que ce projet doive être réalisé comme un ensemble de travaux unique, il peut être séparé en deux (2) piliers principaux, à savoir l'inventaire et la maintenance. Bien que ces piliers puissent être travaillés séparément, il est fortement conseillé d'optimiser le référencement et la communication entre les deux pour garantir des opérations transparentes. Le projet sera réalisé par phases afin de diviser le travail et de réaliser des portions gérables à la fois. Bien que des explications sur toutes les phases soient fournies dans ce document, l'EDT sur lequel faire l'offre au moment de la publication ne concerne que la phase 1.

Mining Operations

17-Nov

103

21915

Rental of 4 telehandlers

To respect the new export procedure in force in DRC, we have implemented the steps recommended by the public services in our export operations. The direct consequence is that this procedure creates delays on the loading plan of copper and cobalt. We need additional telehandlers and operators to ensure that we export the maximum amount of stock available on the ground currently and to free up space at the plant to avoid blocking production of copper cathodes.

 

---------------------

 

Pour respecter la nouvelle procédure d'exportation en vigueur en RDC, nous avons mis en œuvre les démarches recommandées par les services publics dans nos opérations d'exportation. La conséquence directe est que cette procédure crée des retards sur le plan de chargement du cuivre et du cobalt. Nous avons besoin de chariots télescopiques et d'opérateurs supplémentaires pour garantir que nous exportons le maximum de stock disponible sur le terrain actuellement et pour libérer de l'espace dans l'usine afin d'éviter de bloquer la production de cathodes de cuivre.

Mining Operations

17-Nov

104

21918

Provision of Security Services - CCTV

Kamoto Copper Company (hereinafter called the “Company”) is requesting quotations from reputable security service providers (hereinafter-called the “Contractor”) with a local presence in the Lualaba Province of the DRC for the provision of security officers and supervisory/support personnel to carry out the following duties:
• CCTV and Security Operations Control & Monitoring
Services are to be carried out on Company premises in Kolwezi to guard and protect the Company’s assets and personnel and provide other related security services.

 

---------------------

 

Kamoto Copper Company (ci-après appelée la « Société ») demande des devis à des prestataires de services de sécurité réputés (ci-après appelés le « Contractant ») avec une présence locale dans la province de Lualaba en RDC pour la fourniture d'agents de sécurité et de personnel de supervision/de soutien. pour exercer les missions suivantes :
• Contrôle et surveillance des opérations de vidéosurveillance et de sécurité
Les services doivent être effectués dans les locaux de la Société à Kolwezi pour garder et protéger les actifs et le personnel de la Société et fournir d'autres services de sécurité connexes.

Mining Operations

17-Nov

105

21919

Maintenance Fire Detection & Suppression

KCC Engineering/Energy department has equipment’s, substations, MCC’s and server rooms with a proper fire detection and quenching Equipment. To have these systems always available, there is a need to put in place a proper maintenance contract with a qualified fire detection and suppression company.

 

---------------------

 

Le département Ingénierie/Énergie de KCC dispose d’équipements, de sous-stations, de MCC et de salles de serveurs dotés d’un équipement approprié de détection et d’extinction d’incendie. Pour que ces systèmes soient toujours disponibles, il est nécessaire de mettre en place un contrat de maintenance approprié avec une entreprise qualifiée en matière de détection et d'extinction d'incendie.

Mining Maintenance

17-Nov

106

21917

IPC ROM Bin structural Repair

During operation the KOV In pit crusher has experienced severe structural defects. 3rd party and internal structural integrity inspection have been conducted and it has been recommended that the entire grizzly support and bracing beam be replaced in order to ensure safe and efficient operation.

 

---------------------

 

Pendant son fonctionnement, le concasseur à fosse KOV In a présenté de graves défauts structurels. Une inspection indépendante et interne de l'intégrité structurelle a été effectuée et il a été recommandé que l'ensemble du support du grizzly et de la poutre de contreventement soient remplacés afin de garantir un fonctionnement sûr et efficace.

Mining Maintenance

17-Nov

107

21855

Reliability and Planning Team's Coaches

Glencore Copper Asset Management Framework (AMF) is the guiding set of documents used to improve asset management practices and deliver the required asset performance at KCC.The Computer Maintenance Management Software (CMMS) in use at KCC is AMT. The contractor should be aware that it is anticipated within the next two years that SAP will replace some or all of the functions currently performed by AMT.The contractor will provide a small team of technical specialists to work closely with the operations, maintenance and reliability teams on site to coach key planning and reliability senior roles. The team’s priorities will be set by the Central Asset Reliability department manager.

 

---------------------

 

Dans le cadre de gestion des actifs est l'ensemble de documents d'orientation utilisé pour améliorer les pratiques de gestion des actifs et fournir la performance requise des actifs chez KCC.Le logiciel de gestion de la maintenance informatique (GMAO) utilisé chez KCC est AMT. L'entrepreneur doit savoir qu'il est prévu que SAP remplacera tout ou partie des fonctions actuellement exécutées par AMT au cours des deux prochaines années. L'entrepreneur fournira une petite équipe de spécialistes techniques pour travailler en étroite collaboration avec les équipes d'exploitation, de maintenance et de fiabilité sur place afin d'encadrer les rôles principaux de planification et de fiabilité. Les priorités de l’équipe seront fixées par le responsable du service Central Asset Reliability.

Mining Service

10-Nov

108

21859

NEW WATER TREATMENT PLANT PIPING WORKS

The installation of new water treatment plant for KCC will resolve issue with cost saving for drinkable water supply, will give possibility to all people in the plants to get drinking water all time, will also reduce the quantity of empty bottles all through the plants for a good environmental control. This scope of works details the steps the contractor must undertake to do piping works for supplying raw water to the new water treatment plants.

 

---------------------

 

L'installation d'une nouvelle usine de traitement d'eau pour KCC résoudra le problème des économies de coûts pour l'approvisionnement en eau potable, donnera la possibilité à toutes les personnes présentes dans les usines d'avoir de l'eau potable à tout moment, réduira également la quantité de bouteilles vides dans toutes les usines pour un bon contrôle environnemental. Cette étendue des travaux détaille les étapes que l'entrepreneur doit entreprendre pour réaliser les travaux de tuyauterie pour l'alimentation en eau brute des nouvelles usines de traitement des eaux.

Mining Service

10-Nov

109

21871

Luilu Camp Upgrade - Electrical works

KCC requires a supplier to Supply and Install all electrics related to the new Luilu Camp facility. The supplier will not be doing any connections.

 

---------------------

 

KCC demande à un fournisseur de fournir et d'installer tout le système électrique lié à la nouvelle installation du camp Luilu. Le fournisseur n'effectuera aucune connexion.

Mining Maintenance

10-Nov

110

21868

CAT6060 SIMULATOR CONVERSION KIT REPAIR

KCC Open Pit Mine Operations has tree Surface Simulators that are available for Operator Training purposes and working daily basis, in term of production optimization a new conversion was purchased and sent to site last year, unfortunately during shipment the KIT reaches site with deformations and could not work, hence returned to the OEM for repair.

 

---------------------

 

KCC Open Pit Mine Operations dispose de trois simulateurs de surface qui sont disponibles à des fins de formation des opérateurs et pour le travail quotidien. En termes d'optimisation de la production, une nouvelle conversion a été achetée et envoyée sur le site l'année dernière. Malheureusement, lors de l'expédition, le KIT arrive sur le site avec des déformations et n'a pas pu fonctionne, donc renvoyé à l'OEM pour réparation.

Mining Service

10-Nov

111

21870

T17 Rock Testing

The Mine Technical Services Department at KCC is completing a Pre-feasibility Study (PFS) on the T17 open pit extension. As part of the PFS, new drilling and data collection is being completed. Rock testing is required to improve the confidence in material strength parameters to inform the PFS.

 

---------------------

 

Le département des services techniques miniers de KCC termine une étude de préfaisabilité (PFS) sur l'extension de la mine à ciel ouvert T17. Dans le cadre du PFS, de nouveaux forages et collectes de données sont en cours de réalisation. Des essais sur roches sont nécessaires pour améliorer la confiance dans les paramètres de résistance des matériaux afin d'informer le PFS.

Mining Service

10-Nov

112

21834

KTC Vulcanizing Press Service

Supply labor to perform service of the hot vulcanizing press:
• Site establishment.
• Test of the vulcanizing press;
• Repair of the vulcanizing press;
• Re-calibration of the vulcanizing press

 

---------------------

 

Fournir de la main d'œuvre pour effectuer l'entretien de la presse de vulcanisation à chaud :
• Mobilisation.
• Test de la presse à vulcaniser ;
• Réparation de la presse de vulcanisation ;
• Recalibrage de la presse de vulcanisation

Mining Maintenance

10-Nov

113

21878

 

The Standard Assembly Timeline of 69 Days per truck, on the 8 x New 793D Trucks, need to be shortened to fit the Truck Availability as per the Mines Scope of Production Ramp-Up Jan-Apr 2024. Thus, Proposal is to Assemble 4 x 793 Trucks simultaneously with Assembly Time Line of 48 Days per Four Trucks.

 

---------------------

 

Le délai d'assemblage standard est de 69 jours par camion, sur les 8 nouveaux camions 793D, doit être raccourci pour s'adapter à la disponibilité des camions conformément à la portée de la production minière de janvier à avril 2024. Ainsi, la proposition consiste à assembler 4 x 793 camions simultanément avec un délai d'assemblage de 48 jours pour quatre camions.

Mining Maintenance

10-Nov

114

21901

2024 Dewatering Drilling Project  - Dra

The Mine Technical Services Department at Kamoto Copper Company SA (KCC) is planning to augment the current dewatering capacity at the KOV Open Pit. A new strategy involves the installation of a series of vertical RC holes to form a drainage adit from KOV pit into the KTO underground workings in order to depressurize the KOV pit bottom formations. As part of this programme, 65 small diameter RC boreholes will be drilled at the toe of KOV Cut 4/5B for the free draining of groundwater into the KTO underground workings. This drainage adit will provide extra abstraction capacity to the current dewatering infrastructure and aid in depressurization of the pit bottom hydrostratigraphy. The data collected during drilling will add to the information base to assist in the management of the groundwater at KCC.

 

---------------------

 

Le département des services techniques miniers de Kamoto Copper Company SA (KCC) prévoit d'augmenter la capacité actuelle de déshydratation de la mine à ciel ouvert KOV. Une nouvelle stratégie implique l'installation d'une série de trous RC verticaux pour former une galerie de drainage depuis la fosse KOV vers les chantiers souterrains de KTO afin de dépressuriser les formations du fond de la fosse KOV.Dans le cadre de ce programme, 65 forages RC de petit diamètre seront forés au pied du KOV Cut 4/5B pour le drainage libre des eaux souterraines dans les chantiers souterrains de KTO.Cette galerie de drainage fournira une capacité de captage supplémentaire à l'infrastructure de déshydratation actuelle et contribuera à la dépressurisation de l'hydrostratigraphie du fond de la fosse. Les données collectées lors du forage s'ajouteront à la base d'informations pour aider à la gestion des eaux souterraines de KCC.

Mining Service

10-Nov

115

21680

DEDUSTING SYSTEM AUDIT & INSTALLATION

As we know, dedusting is the industrial cleaning of granulates, generally using some form of pneumatic separation system. Separation may involve separating dust from re-processed materials, but it also encompasses the removal of light impurities.Currently, we have a DONALSON filters dedusting system in the Bag-Breakers at MgO and Lime Plants.We would like to carry out an audit and study with a view to implementation in all dusty areas.

 

---------------------

 

Comme nous le savons, le dépoussiérage est le nettoyage industriel des granulés, généralement à l'aide d'un système de séparation pneumatique. La séparation peut consister à séparer les poussières des matériaux retraités, mais elle englobe également l'élimination des impuretés légères. Actuellement, nous disposons d'un système de dépoussiérage des filtres DONALSON dans les casse-sacs des usines de MgO et de chaux. Nous souhaitons réaliser un audit et étude en vue d’une mise en œuvre dans toutes les zones poussiéreuses.

Mining Maintenance

03-nov

116

21779

HGAC PFS Study

Based on the life of asset mining plans, Kamoto Copper Company (KCC) expects an increase in gangue acid consuming (GAC) minerals beyond the processing capability of its current operations at KTC and Luilu, in the
Democratic Republic of the Congo. During May 2023, KCC completed a concept (trade-off) study that evaluated and compared three viable flowsheet options to reconfigure the process plant and reduce the prevalence of gangue acid consumption. The concept study was conducted in line with guidelines commensurate with an AACE class 5 level of accuracy.

 

---------------------

 

Sur la base de la durée de vie des plans d'exploitation minière des actifs, Kamoto Copper Company (KCC) s’attend à une augmentation des minéraux consommateurs d’acide de la gangue (GAC) au-delà de lacapacité de traitement de ses opérations actuelles à KTC et Luilu, dans la République Démocratique du Congo. En mai 2023, KCC a réalisé une étude de concept (compromis) qui a évalué et comparé trois options de schéma de traitement viables pour reconfigurer l'usine de traitement et réduire la prévalence de la consommation d’acide de gangue. L'étude conceptuelle a été menée conformément aux lignes directrices correspondant à un niveau AACE classe 5 de précision.

Consultance

03-nov

117

21787

Calibration of 62 Measuring Devices:

The certification of measuring instruments for structural and condition monitoring inspection is a mandate based upon OEM and the ISO 9001-2015 standard (Quality system management). The frequential interval for this mandatory certification should be done every one year of usage through course of which the instruments are calibrated to guarantee the accuracy of the measurements and to avoid errors (false results of the measurements).

 

---------------------

 

La certification des instruments de mesure pour l'inspection de surveillance des structures et de l'état est un mandat basé sur les OEM et la norme ISO 9001-2015 (Gestion du système qualité). L'intervalle de fréquence pour cette certification obligatoire doit être effectué chaque année d'utilisation au cours de laquelle les instruments sont calibrés pour garantir l'exactitude des mesures et éviter les erreurs (faux résultats des mesures).

Calibration

03-nov

118

21852

SUBSCRIPTION TO LARCIER DRC LEGAL DATA

SUBSCRIPTION TO LARCIER DRC LEGAL DATA.

 

---------------------

 

ABONNEMENT AUX DONNÉES JURIDIQUES LARCIER RDC

Legal Service

03-nov

119

21847

Bosch license renewal - diagnostic tool

Bosch license renewal - diagnostic tool.

 

---------------------

 

Renouvellement de licence Bosch - outil de diagnostic.

Software License

03-nov

120

21848

FARMER'S MARKET 10TH EDITION

The contribution of KCC and MUMI to associations and cooperatives working in the sectors of agriculture, livestock, handicrafts, and income-generating activities regarding their Corporate Social Responsibilities has given rise to the idea of organizing an agricultural fair since 2014. The objective of this event was not only to help the members of these associations and cooperatives to exhibit and sell their products but also to create contacts with potential customers to potential markets. This exhibition aims to be effective from the usual market by presenting various products with a competitive price and accessible to the common world. For more than a decade, KCC has been organizing this event, which brings together participants from communities to benefit from their work.

 

---------------------

 

La contribution de KCC et MUMI aux associations et coopératives œuvrant dans les secteurs de l'agriculture, de l'élevage, de l'artisanat et des activités génératrices de revenus en ce qui concerne leur responsabilité sociale d'entreprise a donné naissance à l'idée d'organiser une foire agricole depuis 2014. L'objectif de cet événement L'objectif était non seulement d'aider les membres de ces associations et coopératives à exposer et vendre leurs produits mais aussi de créer des contacts avec des clients potentiels sur des marchés potentiels. Ce salon se veut efficace par rapport au marché habituel en présentant des produits variés à un prix compétitif et accessibles au monde commun. Depuis plus d'une décennie, KCC organise cet événement qui rassemble des participants des communautés pour bénéficier de leur travail.

 

03-nov

121

21849

License renewal for Crisis Management

License renewal for Crisis Management.

 

---------------------

 

Renouvellement de licence pour la gestion de crise.

Software License

03-nov

122

21850

Dassault - Geovia\ Surpac license

Dassault - Geovia\ Surpac license

Software License

03-nov

123

21853

Adobe Photoshop, Illustator - ALR

Adobe Photoshop, Illustator - ALR

Software License

03-nov

124

21856

Maintenance Services of X-Ray Units

Maintenance Services of X-Ray Units.

 

---------------------

 

Services de maintenance des appareils à rayons X.

Maintenance Service

03-nov

125

21858

AGL Short-Term Warehouse Rental

Short-Term Warehouse Rental.

 

---------------------

 

Location d'entrepôt à court terme

Warehouse Rental

03-nov

126

21859

NEW WATER TREATMENT PLANT PIPING WORKS

The installation of new water treatment plant for KCC will resolve issue with cost saving for drinkable water supply, will give possibility to all people in the plants to get drinking water all time, will also reduce the quantity of empty bottles all through the plants for a good environmental control. This scope of works details the steps the contractor must undertake to do piping works for supplying raw water to the new water treatment plants.

 

---------------------

 

L'installation d'une nouvelle usine de traitement d'eau pour KCC résoudra le problème des économies de coûts pour l'approvisionnement en eau potable, donnera la possibilité à toutes les personnes présentes dans les usines d'avoir de l'eau potable à tout moment, réduira également la quantité de bouteilles vides dans toutes les usines pour un bon contrôle environnemental. Cette étendue des travaux détaille les étapes que l'entrepreneur doit entreprendre pour réaliser les travaux de tuyauterie pour l'alimentation en eau brute des nouvelles usines de traitement des eaux.

Maintenance Service

03-nov

127

21862

Forklift & Telehandler Operators Supply.

Forklift and Telehandler are required to feed reagents to leach and to handle cobalt production. General workers are also required to help hook reagent big bags to the forklifts or telehandlers.

 

---------------------

 

Un chariot élévateur et un chariot télescopique sont nécessaires pour alimenter les réactifs à lixiviation et gérer la production de cobalt. Les ouvriers généraux sont également appelés à aider à accrocher les big-bags de réactifs aux chariots élévateurs ou aux chariots télescopiques.

Equipment Rental

03-nov

128

21680

DEDUSTING SYSTEM AUDIT & INSTALLATION

As we know, dedusting is the industrial cleaning of granulates, generally using some form of pneumatic separation system. Separation may involve separating dust from re-processed materials, but it also encompasses the removal of light impurities.Currently, we have a DONALSON filters dedusting system in the Bag-Breakers at MgO and Lime Plants.We would like to carry out an audit and study with a view to implementation in all dusty areas.                                                                                                                                                                                                                                                                                                                                                  

 

---------------------

 

Comme nous le savons, le dépoussiérage est le nettoyage industriel des granulés, généralement à l'aide d'un système de séparation pneumatique. La séparation peut consister à séparer les poussières des matériaux retraités, mais elle englobe également l'élimination des impuretés légères. Actuellement, nous disposons d'un système de dépoussiérage des filtres DONALSON dans les casse-sacs des usines de MgO et de chaux. Nous souhaitons réaliser un audit et étude en vue d’une mise en œuvre dans toutes les zones poussiéreuses.

Mining Maintenance

03-nov

129

21779

HGAC PFS Study

Based on the life of asset mining plans, Kamoto Copper Company (KCC) expects an increase in gangue acid consuming (GAC) minerals beyond the processing capability of its current operations at KTC and Luilu, in the
Democratic Republic of the Congo. During May 2023, KCC completed a concept (trade-off) study that evaluated and compared three viable flowsheet options to reconfigure the process plant and reduce the prevalence of gangue acid consumption. The concept study was conducted in line with guidelines commensurate with an AACE class 5 level of accuracy.                                                                                                                                                                                                                                                                                                                                                 

 

---------------------

 

Sur la base de la durée de vie des plans d'exploitation minière des actifs, Kamoto Copper Company (KCC) s’attend à une augmentation des minéraux consommateurs d’acide de la gangue (GAC) au-delà de lacapacité de traitement de ses opérations actuelles à KTC et Luilu, dans la République Démocratique du Congo. En mai 2023, KCC a réalisé une étude de concept (compromis) qui a évalué et comparé trois options de schéma de traitement viables pour reconfigurer l'usine de traitement
et réduire la prévalence de la consommation d’acide de gangue. L'étude conceptuelle a été menée conformément aux lignes directrices correspondant à un niveau AACE classe 5 de précision.

Consultance

03-nov

130

21818

Mumi HME Re-commissioning and maintenance

The Heavy Mobile Maintenance Team at KCC, referred to as SKM, is accountable for the maintenance of 160 pieces of equipment (Shovels, Trucks and Dozers) and other equipment types) and the fleet size going to grow up to 211 plus in 2023.
SKM is increasing is fleet size with twenty-one (21) equipment from Mutanda Mining to be maintained by outsourcing :
• 10x 777G Trucks,
• 5X 777E   Trucks,
• 3X D10     Dozers,
• 2X6030     Shovels,
• 1X6015     Shovel,                                                                                                                                                                                                                                                                                                                                                  

 

---------------------

 

L'équipe de maintenance mobile lourde de KCC, appelée SKM, est responsable de la maintenance de 160 pièces d'équipement (pelles, camions et bulldozers) et d'autres types d'équipement) et la taille de la flotte va croître jusqu'à plus de 211 en 2023.
SKM augmente la taille de sa flotte avec vingt et un (21) équipements de Mutanda Mining à maintenir en sous-traitance :
• 10x camions 777G,
• 5X camions 777E,
• 3 bulldozers D10,
• Pelles 2X6030,
• Pelle 1X6015,

Mining Maintenance

27-oct

131

21733

Biodiversity review

The KCC mine site complex is located adjacent to Kolwezi Town in Lualaba Province, southern DRC. The local area has been subject to mining activities for almost 100 years, and as such consists of heavily modified and often degraded landscapes. As part of its commitments for biodiversity management to the DRC government and for monitoring the potential and actual impacts of its operation on biodiversity and landscape function, KCC require a specialist biodiversity monitoring survey of its operations. Subsequent to the survey and assessment report, recommendations should be made to improve the existing Biodiversity Management Plan, including current monitoring and management activities, and potential biodiversity enhancement measures for KCC site.                                                                                                                                                                                                                                                                                                                                                  

 

---------------------

 

Le complexe du site minier KCC est situé à côté de la ville de Kolwezi, dans la province de Lualaba, au sud de la RDC. La zone locale est soumise à des activités minières depuis près de 100 ans et, à ce titre, se compose de paysages fortement modifiés et souvent dégradés. Dans le cadre de ses engagements en matière de gestion de la biodiversité envers le gouvernement de la RDC et de surveillance des impacts potentiels et réels de ses opérations sur la biodiversité et la fonction paysagère, KCC exige une étude spécialisée de surveillance de la biodiversité de ses opérations. À la suite du rapport d'enquête et d'évaluation, des recommandations devraient être faites pour améliorer le plan de gestion de la biodiversité existant, y compris les activités de surveillance et de gestion actuelles, ainsi que les mesures potentielles d'amélioration de la biodiversité pour le site de KCC.

 

27-oct

132

21738

21 LIGHT VEHICLES REFURBISHMENT

The Contractor is required to provide highly qualified and experienced personnel, with backgrounds in Mechanical, Electrical and Body Repair expertise of Toyota Light vehicles. The focus will be to improve the performance and availability of the selected Light vehicle fleets. They will mentor/coach the KCC technicians to improve their understanding and capability in the maintenance and technical.  vehicles that are expected to be repaired are very important in order to extend their useful lives as many have worked for long and short periods in underground mines and others in open mines, but there condition of life is not satisfactory if they remain as they are, we will shorten their life, not because they have reached a bad level of discarded, they should be refurbed and reallocated to other departments ( Surface ) where they will last longer than some of them currently condition,  using the current amount of money will save a lot of money that would soon have to be used to buy new cars, because after this refurbishment these cars will be used for more than the next five years, but if they continue to have this current situation, soon the company will incur the cost of buying other vehicles with high maintenance costs,                                                                                                                                                                                                                                                                                                                                                  

 

---------------------

 

L’entrepreneur doit fournir du personnel hautement qualifié et expérimenté, possédant une expertise en mécanique, en électricité et en réparation de carrosserie des véhicules légers Toyota. L'accent sera mis sur l'amélioration des performances et de la disponibilité des flottes de véhicules légers sélectionnées. Ils encadreront/encadreront les techniciens de KCC pour améliorer leur compréhension et leurs capacités en matière de maintenance et de technique. les véhicules qui devraient être réparés sont très importants pour prolonger leur durée de vie utile, car beaucoup ont travaillé pendant de longues et courtes périodes dans des mines souterraines et d'autres dans des mines à ciel ouvert, mais leurs conditions de vie ne sont pas satisfaisantes s'ils restent tels qu'ils sont, nous raccourcirons leur durée de vie, non pas parce qu'ils ont atteint un mauvais niveau de mise au rebut, ils devraient être remis à neuf et réaffectés à d'autres départements (Surface) où ils dureront plus longtemps que certains d'entre eux ne sont actuellement dans leur état actuel, en utilisant le montant actuel, nous économiserons un beaucoup d'argent qui devrait bientôt être utilisé pour acheter de nouvelles voitures, car après cette rénovation, ces voitures seront utilisées pendant plus que les cinq prochaines années, mais si elles continuent dans cette situation actuelle, l'entreprise devra bientôt supporter le coût de acheter d'autres véhicules avec des coûts d'entretien élevés.

Mining Maintenance

27-oct

133

21820

KCC Lab participation in Qotho PTS 2024

KCC Lab participation in Qotho PTS 2024.

IT License

27-oct

134

21825

Employee Engagement Solution - Umoja

Employee Engagement Solution - Umoja

Communication Fees

27-oct

135

21833

ProfibusConfiguration of KTC Compressors

The scope of work for the Profibus Configuration of KTC Compressors includes but not limited
to the following: all planning, execution, and implementation. The following general scope must
be completed by the vendor:
1. Mobilization and Demobilization
2. Initial site visit
3. Provide Detailed Project requirements and BOQs
4. Installation/Profibus Configurations
5. Supply and Installation of an OPTIMIZER for the three Compressors namely GA250X 2
and ML250 Ingersoll Rand
6. Project Commissioning
7. Provide Skills and Competencies required for this project.

 

---------------------

 

L'étendue des travaux pour la configuration Profibus des compresseurs KTC comprend, sans s'y limiter
aux éléments suivants : toute la planification, l'exécution et la mise en œuvre. La portée générale suivante doit
être complété par le vendeur :
1. Mobilisation et démobilisation
2. Visite initiale du site
3. Fournir les exigences détaillées du projet et les BOQ
4. Installation/Configurations Profibus
5. Fourniture et Installation d'un OPTIMIZER pour les trois Compresseurs à savoir GA250X 2
et ML250 Ingersoll Rand
6. Mise en service du projet
7. Fournir les aptitudes et compétences requises pour ce projet

Mining Operation

27-oct

136

21834

KTC Vulcanizing Press Service

Supply labor to perform service of the hot vulcanizing press:
• Site establishment.
• Test of the vulcanizing press;
• Repair of the vulcanizing press;
• Re-calibration of the vulcanizing press.

 

---------------------

 

Fournir de la main d'œuvre pour effectuer l'entretien de la presse de vulcanisation à chaud :
• Création du site.
• Test de la presse à vulcaniser ;
• Réparation de la presse de vulcanisation ;
• Recalibrage de la presse de vulcanisation

Mining Operation

27-oct

137

21835

HR Team members training

HR Team members training

Training

27-oct

138

21843

Rental of 5 X 777 (Try and Buy)

Provide heavy equipment 5x CAT 777E Trucks supplied with appropriate manpower on a per vehicle per hour basis in Open pit (KOV and Mashamba) Area. Operations will be ongoing 24/7 and supervision is required at all times to provide full coverage.
§ Method
o All work will be carried out in accordance with the KCC procedures and standards.
o A vehicle assessment will be carried out prior to the commencement of the work.
§ Resources
The Contractor shall provide 5 x CAT 777E Trucks in good operating condition.

 

---------------------

 

                                                                                                                                                                                                                                                          Fournir des équipement lourd 5x camions CAT 777E ainsi que la main-d'œuvre appropriée sur une base par véhicule et par heure dans la zone à ciel ouvert (KOV et Mashamba). Les opérations se poursuivront 24 heures sur 24, 7 jours sur 7, et une supervision est requise à tout moment pour assurer une couverture complète.
§ Méthode
o Tous les travaux seront effectués conformément aux procédures et normes de KCC.
o Une évaluation du véhicule sera effectuée avant le début des travaux.
§ Ressources

L'entrepreneur doit fournir 5 camions CAT 777E en bon état de fonctionnement.

Mining Operation

27-oct

139

21785

Hotspot repair unit “Sulphur Burning FCE

Hotspot repair unit “Sulphur Burning FCE.

 

---------------------

 

Unité de réparation de points chauds « Sulphur Burning FCE

 

23-oct

140

21805

DREDGE SYSTEM FOR PONDS SOLIDS REMOVAL

Currently All the LG PLS Pond are full of solids which came from the malfunction of the control at CCDs during the past years. To improve the SX Stability, the LG PLS Pond A has been cleaned and need to be put back online with the commissioning of the LG DBC. To manage SX Stability, it is now necessary to operate the pond recently cleaned and some changes are necessary to operate with the new configuration of the ponds.

 

---------------------

 

Actuellement, tous les bassins LG PLS sont remplis de solides provenant d'un dysfonctionnement du contrôle des CCD au cours des dernières années. Pour améliorer la stabilité du SX, le LG PLS Pond A a été nettoyé et doit être remis en ligne avec la mise en service du LG DBC. Pour gérer SX Stability, il est désormais nécessaire d'exploiter le bassin récemment nettoyé et quelques changements sont nécessaires pour fonctionner avec la nouvelle configuration des bassins.

 

23-oct

141

21801

Online Training on " Manage your team "

Online Training on " Manage your team.

 

---------------------

 

Formation en ligne sur "Gérer votre équipe

 

23-oct

142

21806

 

1 - Services for breathing apparatus BG4
2 - Certification for all breathing apparatus BG4
3 - Training and Refresher for all Mine Rescue Team members
.

 

---------------------

 

1 - Services pour les appareils respiratoires BG4
2 - Certification de tous les appareils respiratoires BG4
3 - Formation et recyclage pour tous les membres de l'équipe de sauvetage minier

 

23-oct

143

21811

 

The first phase of a Centric project focuses on the creation of a detailed scope, design, and plan. This process will take four (4) weeks of work to complete. The following steps will be taken:
Scope Definition (remote): The objective of this first activity is to elicit, document, and confirm the scope boundaries. Documentation and information will be gathered and reviewed in advance of a site visit to build a foundation of understanding of the current/desired processes. CMS and KCC will perform a stakeholder identification exercise and kick-off the project with all key stakeholders.
A site visit will be organized. .

 

---------------------

 

"La première phase d'un projet Centric se concentre sur la création d'une portée, d'une conception et d'un plan détaillés. Il faudra quatre (4) semaines de travail pour mener à bien ce processus. Les étapes suivantes seront suivies :
Définition du champ d'application (à distance) : L'objectif de cette première activité est d'obtenir, de documenter et de confirmer les limites du champ d'application. La documentation et les informations seront rassemblées et examinées avant la visite du site afin d'établir une base de compréhension des processus actuels et souhaités. CMS et KCC procéderont à un exercice d'identification des parties prenantes et donneront le coup d'envoi du projet avec toutes les parties prenantes clés. Une visite du site sera organisée. "

 

23-oct

144

21813

 

i. The Contractor shall provide Project Access (Asset Assistance Services) to cover approximately 9,163 Members
on Site.
ii. As part of the Project Access Services, Contractor shall provide Buyer an updated Medical Evacuation Response
Plan (“MERP”) for the Site detailing the procedures, responsibilities, planning and emergency management
process to be followed by the Buyer and Contractor in the event of an emergency on Site requiring medical
evacuation.
iii. The Contractor-prepared MERP will be updated and signed by the Buyer prior to the mobilisation of the
Contractor’s Personnel and will act as a reference point for medical assistance between the Contractor’s
Personnel and the designated International SOS Assistance Center.
iv. The detailed scope of services of the Project Access (Asset Assistance Services) for the Site and Buyer’s and
Contractor’s obligations shall be in accordance with Part C Project Access (Asset Assistance Service) of
Exhibit C: Description of Services of the Agreement and Annex I of the Work Order.

 

---------------------

 

"i. Le contractant doit fournir un accès au projet (services d'assistance aux actifs) pour couvrir environ 9 163 membres sur le site.
sur le site.
ii. Dans le cadre des services d'accès au projet, le contractant fournira à l'acheteur un plan d'intervention en cas d'évacuation médicale
d'évacuation médicale ("MERP") actualisé pour le site, détaillant les procédures, les responsabilités, la planification et le processus de gestion d'urgence à suivre par l'acheteur.
d'urgence à suivre par l'Acheteur et le Contractant en cas d'urgence sur le Site nécessitant une évacuation médicale.
médicale.
iii. Le MERP préparé par le contractant sera mis à jour et signé par l'acheteur avant la mobilisation du personnel du contractant.
du personnel du contractant et servira de point de référence pour l'assistance médicale entre le personnel du contractant et le centre d'assistance désigné par International SOS.
personnel du contractant et le centre d'assistance International SOS désigné.
iv. L'étendue détaillée des services d'accès au projet (services d'assistance aux biens) pour le site et les obligations de l'acheteur et du contractant seront précisées dans le contrat.
Les obligations de l'Acheteur et du Contractant seront conformes à la Partie C Accès au projet (Service d'assistance aux biens) de l'Annexe C.
l'Annexe C : Description des services de l'Accord et à l'Annexe I de l'Ordre de travail".

 

23-oct

145

21812

 

There have been numerous challenges with the ball mills which have resulted in three ball mills not operational. there is a potential upside to increase throughput rates by bringing the 3 ball mills back online.

 

---------------------

 

Les broyeurs à boulets ont connu de nombreux problèmes qui ont entraîné la mise hors service de trois d'entre eux. La remise en service des trois broyeurs à boulets pourrait permettre d'augmenter les débits.

 

23-oct

146

21816

 

Borealis Renewal Subscription 2023-2024.

 

---------------------

 

Borealis Renouvellement de l'abonnement 2023-2024

 

23-oct

147

21727

EW3 MCC UPGRADE PANEL INSTALL & COMMISSIONING

EW3 MCC UPGRADE PANEL INSTALL & COMMISSIONING.

 

---------------------

 

INSTALLATION ET MISE EN SERVICE DU PANNEAU DE MISE À NIVEAU EW3 MCC

Mining Service

13-Oct

148

21699

KTC CM5 Chilling System

Through the scale and nature of the business, KCC makes a significant and positive contribution to our local communities, the province, country, and broader society. Positive impacts range from production of raw materials that drive social progress, to the payment of taxes and royalties to the DRC government, provision of employment and business opportunities. KCC is an equal opportunity employer and actively promotes diversity in its workplace. KCC’s Concentrator department (KTC) owns and operates the Trane Chillers on CM5 Cascade Mill and in the quest to improve the efficiency our HVAC equipment and their overall life span, KCC KTC is seeking the services of the OEM to carry out the Monthly, Quarterly & Annual Inspections and maintenance of the Trane Chillers for a three (3) year contract. The specifications of the equipment in question are listed below:
1.(Trane Model No.: RTAC400; Serial No.: EKW3180)-Chilled Water Pumps and Plate heat Exchanger
2.Chiller Skid 1(Chilled Water Pumps and Plate Heat Exchanger)
3.Chiller Skid 2(Chilled Water Pumps and Plate Heat Exchanger).

 

---------------------

 

Grâce à l'ampleur et à la nature de son activité, KCC apporte une contribution significative et positive à nos communautés locales, à la province, au pays et à la société dans son ensemble. Les impacts positifs vont de la production de matières premières qui favorisent le progrès social, au paiement d'impôts et de redevances au gouvernement de la RDC, en passant par la création d'emplois et d'opportunités commerciales. KCC est un employeur garantissant l'égalité des chances et promeut activement la diversité sur son lieu de travail. Le département Concentrateur de KCC (KTC) possède et exploite les refroidisseurs Trane sur le broyeur à cascade CM5 et dans le but d'améliorer l'efficacité de nos équipements CVC et leur durée de vie globale, KCC KTC recherche les services de l'OEM pour effectuer les analyses mensuelles, trimestrielles et Inspections annuelles et maintenance des refroidisseurs Trane pour un contrat de trois (3) ans. Les spécifications des équipements en question sont listées ci-dessous :
1. (N° de modèle Trane : RTAC400 ; N° de série : EKW3180) - Pompes à eau réfrigérée et échangeur de chaleur à plaques
2. Chiller Skid 1 (pompes à eau réfrigérée et échangeur de chaleur à plaques)
3.Chiller Skid 2 (pompes à eau réfrigérée et échangeur de chaleur à plaques)

Consultancy service

13-Oct

149

21777

15 Samplers at the dryers

The 15 samplers will perform sampling service at the dryers in full compliance to sampling standard.
The value chain (sampling process) will consist of:
• Sampling
• Packaging
• Samples submission to the Laboratory
Samplers will under Laboratory supervision.

 

---------------------

 

Les 15 échantillonneurs effectueront le service d'échantillonnage dans les séchoirs en totale conformité avec les normes d'échantillonnage.
La chaîne de valeur (processus d’échantillonnage) comprendra :
• Échantillonnage
•Emballage
• Soumission des échantillons au Laboratoire
Les échantillonneurs seront sous la supervision du laboratoire.
 

Consultancy service

13-Oct

150

21784

Dewatering Drilling-Shallow Piezometers

The Mine Technical Services Department at Kamoto Copper Company SA (KCC) wishes to drill and construct a total of 37 shallow standpipe piezometer holes for the monitoring of pore pressure and groundwater level variations within the between KOV Open Pit area.The aim is to provide dedicated facilities to monitor pore pressure and groundwater level variations at the toe of the KOV West WRD and the crest of the KOV Cut 5A1/6 pit design.The completed holes will provide valuable data input to the groundwater management system design and long-term monitoring.

 

---------------------

 

Le département des services techniques miniers de Kamoto Copper Company SA (KCC) souhaite forer et construire un total de 37 trous piézométriques peu profonds pour la surveillance de la pression interstitielle et des variations du niveau de la nappe phréatique dans la zone de la fosse à ciel ouvert entre KOV.L'objectif est de fournir des installations dédiées pour surveiller les variations de la pression interstitielle et du niveau de la nappe phréatique au pied du KOV West WRD et à la crête de la conception de la fosse KOV Cut 5A1/6.Les forages réalisés fourniront des données précieuses pour la conception du système de gestion des eaux souterraines et la surveillance à long terme.

Consultancy service

13-Oct

151

21635

Air quality power Bi dashboard

Kamoto Copper Company (KCC) operates the Katanga Mining Limited (KML) copper and cobalt mining complex in Kolwezi, Democratic Republic of Congo (DRC). The mining complex includes underground and open pit mining, ore concentrating and refinery processing facilities, plus supporting facilities and infrastructure. KCC is seeking a suitable environmental/air quality specialist develop and maintain of an Air Quality Monitoring Dashboard for Kamoto Copper Company for a period of 12 Months as per KCC Air Quality Management Plan (AQMP)..
The scope of works includes:
1. Review and quality control of air monitoring data
2. Upload of air quality data onto Power BI dashboard
3. Review of Power BI dashboard with KCC
4. Update of air quality graphics to include in monthly report.
5. Development and submission of 12 monthly Air quality data reports
6. Compilation of data on atmospheric emissions monthly basic.
7. Updated air quality graphs
8. Development and submission of t12 monthly reports.

 

---------------------

 

Kamoto Copper Company (KCC) exploite le complexe minier de cuivre et de cobalt de Katanga Mining Limited (KML) à Kolwezi, en République démocratique du Congo (RDC). Le complexe minier comprend des installations d'exploitation minière souterraine et à ciel ouvert, des installations de concentration et de raffinage du minerai, ainsi que des installations et infrastructures de soutien. KCC recherche un spécialiste approprié de l'environnement et de la qualité de l'air pour développer et maintenir un tableau de bord de surveillance de la qualité de l'air pour Kamoto Copper Company pendant une période de 12 mois, conformément au plan de gestion de la qualité de l'air (AQMP) de KCC.
L'étendue des travaux comprend :
1. Examen et contrôle de la qualité des données de surveillance de l'air
2. Téléchargement des données sur la qualité de l'air sur le tableau de bord Power BI
3. Revue du tableau de bord Power BI avec KCC
4. Mise à jour des graphiques sur la qualité de l'air à inclure dans le rapport mensuel.
5. Élaboration et soumission de 12 rapports mensuels sur les données sur la qualité de l'air
6. Compilation mensuelle de données de base sur les émissions atmosphériques.
7. Graphiques mis à jour sur la qualité de l'air
8. Élaboration et soumission des rapports mensuels t12

Communication

13-Oct

152

21776

CHILLERS REPAIRS AT LUILU PLANT

We are currently facing many repetitive failures on all Trane chillers and air systems at the Luilu factory due to the lack of spare parts on site an equipment’s of different factories such as EW rectifiers, SX compressor room at cobalt plant. We want to set up a repair service regarding the efforts to be undertaken to restore the operation of the chillers. To keep the chillers at different locations in Luilu Plant running smoothly, it is necessary to have all the critical spares, parts, and tools available on-site, along with fully repaired and tested condenser coils.
Chiller repairing consists in repairing 17 condenser coils of:
SX-EW :
• Chiller electrolyte TH1 3101- CHIL-01-041.
• Chiller electrolyte TH2 3101- CHIL-02-041.
• Chiller rectifier TH1 3101-CHIL- 01-042.
• Chiller rectifier TH1 3101-CHIL- 01-043.
• Chiller rectifier TH2 3101-CHIL- 02-042.
• Chiller rectifier TH2 3101-CHIL- 02-043.
• Roaster : 6 condenser coils must be repaired to refurbish the chiller completely. The refurbishment can only be possible if parts and specialised tools are available on-site, which KCC needs to supply
• Remaining (5) condenser available at supply chain damaged during transportation from SA to DRC.

 

---------------------

 

Nous sommes actuellement confrontés à de nombreuses pannes répétitives sur tous les refroidisseurs et systèmes d'air Trane de l'usine de Luilu en raison du manque de pièces de rechange sur site et des équipements de différentes usines tels que les redresseurs EW, la salle des compresseurs SX de l'usine de cobalt. Nous souhaitons mettre en place un service de réparation concernant les efforts à entreprendre pour rétablir le fonctionnement des refroidisseurs. Pour que les refroidisseurs des différents sites de l'usine de Luilu fonctionnent correctement, il est nécessaire de disposer de toutes les pièces de rechange, pièces et outils essentiels disponibles sur site, ainsi que de serpentins de condenseur entièrement réparés et testés.
La réparation du refroidisseur consiste à réparer 17 serpentins de condenseur de :
SX-EW :
• Électrolyte refroidisseur TH1 3101- CHIL-01-041.
• Électrolyte refroidisseur TH2 3101- CHIL-02-041.
• Redresseur refroidisseur TH1 3101-CHIL-01-042.
• Redresseur refroidisseur TH1 3101-CHIL-01-043.
• Redresseur refroidisseur TH2 3101-CHIL-02-042.
• Redresseur refroidisseur TH2 3101-CHIL-02-043.
• Torréfacteur : 6 serpentins du condenseur doivent être réparés pour remettre à neuf complètement le refroidisseur. La remise à neuf ne peut être possible que si des pièces et des outils spécialisés sont disponibles sur place, que KCC doit fournir.
• Condenseur restant (5) disponible au niveau de la chaîne d'approvisionnement endommagé pendant le transport de l'Afrique du Sud vers la RDC.

Mining Service

13-Oct

153

21651

ONSITE EMPLOYEE COUNSELLING SERVICES-EAP

Provide onsite employee councelling services (a face-to-face counselling service under the EAP locally in the DRC) to support employees’ emotional and psychological wellbeing with expert counselling by professionals trained in violence and harassment counselling, as well as assisting employees in resolving personal problems that may be adversely affecting their work performance.

 

---------------------

 

Fournir des services de conseil aux employés sur place (un service de conseil en face-à-face dans le cadre du PAE localement en RDC) pour soutenir le bien-être émotionnel et psychologique des employés avec des conseils d'experts par des professionnels formés au conseil en matière de violence et de harcèlement, ainsi qu'en aidant les employés à résoudre des problèmes personnels. problèmes pouvant nuire à leur performance au travail.

Consultancy service

13-Oct

154

21721

Orica Explosives Depot Refurbishment

This Scope of Services under this Contract include, but not limited to the following:
• Contractor to remove all existing damaged roof sheeting, rotten timber purlins and trusses to the Explosive Depot buildings.
• Contractor to supply, manufacture and install new timber trusses and purlins at Explosives Depot No. 1 & 2, building size 12,00m wide x 20,00m Long.
• Contractor to supply, manufacture and install new timber trusses and purlins at Explosives Depot No. 3,4,5 & 6, building size 6,00m wide x 36,00m Long.
• Contractor to supply and install new roof sheeting to Explosives Depots No. 1 & 2.
• Contractor to supply and install new roof sheeting to Explosives Depots No. 3,4,5 and 6.
• Contractor to supply all material and build minor brick work to selected Depot buildings.
• Contractor to supply all material and repair cracks in brickwork structures.

 

---------------------

 

Cette étendue des services en vertu de ce contrat comprend, sans s'y limiter, les éléments suivants :
• L'entrepreneur doit retirer toutes les tôles de toit endommagées, les pannes en bois pourries et les fermes des bâtiments du dépôt d'explosifs.
• L'entrepreneur devra fournir, fabriquer et installer de nouvelles fermes et pannes en bois au dépôt d'explosifs n° 1 et 2, taille du bâtiment 12,00 m de large x 20,00 m de long.
• L'entrepreneur doit fournir, fabriquer et installer de nouvelles fermes et pannes en bois au dépôt d'explosifs n° 3, 4, 5 et 6, taille du bâtiment 6,00 m de large x 36,00 m de long.
• L'entrepreneur doit fournir et installer de nouvelles tôles de toit aux dépôts d'explosifs n° 1 et 2.
• L'entrepreneur doit fournir et installer de nouvelles tôles de toit aux dépôts d'explosifs n° 3, 4, 5 et 6.
• L'entrepreneur doit fournir tous les matériaux et construire des travaux mineurs de maçonnerie dans les bâtiments du dépôt sélectionnés.
• L'entrepreneur doit fournir tous les matériaux et réparer les fissures dans les structures en maçonnerie.

Consultancy service

13-Oct

155

21736

Calibration for room thermometers

The service will consist of calibrating by SANAS and providing certificates of Calibration. • Compliance with the ISO 17025 and Laboratory procedures
• Maintain a calibration schedule as per Lab quality requirement.

 

---------------------

 

Le service consistera à calibrer par SANAS et à fournir des certificats de calibrage. • Conformité à la norme ISO 17025 et aux procédures de laboratoire • Maintenir un calendrier d'étalonnage conformément aux exigences de qualité du laboratoire.

Consultancy service

13-Oct

156

21602

24/7   4 x ADT LUBE TRUCKS FOR RENTAL

Purpose intended within this Scope of Work is to rent 4x ADT Lube trucks to ensure that the distribution of lubricant 24/7 in Open pit (KOV and Mashamba) area are carried out as per KCC lubricant management procedures to avoid prolonged downtime of machines due to extended delivery times. Open pit machines lubricant supply will affect the availability and production if we encounter any the lack of Lube trucks in the pit.

 

---------------------

 

L'objectif prévu dans ce cadre de travail est de louer 4 camions ADT Lube pour garantir que la distribution de lubrifiant 24h/24 et 7j/7 dans la zone à ciel ouvert (KOV et Mashamba) est effectuée conformément aux procédures de gestion des lubrifiants KCC afin d'éviter les temps d'arrêt prolongés des machines en raison de délais de livraison allongés. L'approvisionnement en lubrifiant des machines à ciel ouvert affectera la disponibilité et la production si nous rencontrons un manque de camions lubrifiants dans la fosse.

Mining Service

13-Oct

157

21724

KTC Change Room Electrical Installation

Build a high standard locker room for KTC workers because the old locker room is no longer in good condition and requires refurbishment. Construire un vestiaire de haut niveau pour les travailleurs de KTC car l'ancien vestiaire n'est plus en bon état et nécessite une rénovation.

Mining Service

13-Oct

158

21741

RELOCATING A PART OF 15 kV JCI NORTH OHL

To allow the development of the KOV mine and MASHAMBA mine, it was decided to move a part of 15 kV JCI North overhead line to the left of the line which supplies the KOV-C substation. At MASHAMBA mine, it will be necessary to replace a portion of overhead line by an underground cable to ensure the supply of MAHAMBA mine and Kapata city.

 

---------------------

 

Pour permettre le développement de la mine KOV et de la mine MASHAMBA, il a été décidé de déplacer une partie de la ligne aérienne 15 kV JCI Nord à gauche de la ligne qui alimente le poste KOV-C. A la mine MAHAMBA, il sera nécessaire de remplacer une partie de ligne aérienne par un câble souterrain pour assurer l'approvisionnement de la mine MAHAMBA et de la ville de Kapata.

Mining Service

13-Oct

159

21783

WOL & COBALT VERTICAL PUMPS IMPROVEMENT

Currently, the bounded area is full of solids because in the past, the plant was facing many mixing tanks overflowing due to bad control of the thickeners. this situation led to mixing tank structure corrosion and the housekeeping was also badly impacted. Due to the number of solids, the sump pumps were not performing well. The purpose of this job is to improve vertical pumps performance in order to prevent them from jamming due to solids build up into the sumps where they are installed.

 

---------------------

 

Actuellement, la zone délimitée est pleine de solides car dans le passé, l'usine était confrontée à de nombreux débordements de cuves de mélange en raison d'un mauvais contrôle des épaississeurs. cette situation a entraîné une corrosion de la structure du réservoir de mélange et l'entretien ménager a également été gravement affecté. En raison du nombre de solides, les pompes de puisard ne fonctionnaient pas bien. Le but de ce travail est d'améliorer les performances des pompes verticales afin d'éviter qu'elles ne se coincent en raison de l'accumulation de solides dans les puisards où elles sont installées.

Mining Maintenance

13-Oct

160

21558

Working at height services

Protekta has a working at height division that is committed to developing improved standart for quality accreditation and best practice in the working at height and confined space industry. Their methodology includes assessing site and existing working at height procedures, identified the gaps and propose trainings. as well as appropriate equipment for working at height( Enchor Point, Life line,...).

 

---------------------

 

Protekta dispose d'une division de travail en hauteur qui s'engage à développer des normes améliorées en matière d'accréditation de qualité et de meilleures pratiques dans le secteur du travail en hauteur et des espaces confinés. Leur méthodologie comprend l'évaluation du site et des procédures de travail en hauteur existantes, l'identification des lacunes et la proposition de formations. ainsi que du matériel adapté aux travaux en hauteur( Point d'ancrage, ligne de vie,...)

Mining Service

28-Sep

161

21709

KTO UG – LIGHTNING PROTECTION STUDIES

Conduct studies on the lightning protection to be installed at ventilation shaft 4 and 5 areas. 1. Risk Assessment as per IEC Standard SANS 62305 including reports.
2. Detailed lightning protection system design including bill of materials and detailed drawings.

3. Site assessment as per SANS62305 standard including report

 

---------------------

 

Réaliser des études sur la protection contre la foudre à installer au niveau des gaines de ventilation 4 et 5.
1. Évaluation des risques selon la norme CEI SANS 62305, y compris les rapports.
2. Conception détaillée du système de protection contre la foudre, y compris la nomenclature des matériaux et les dessins détaillés.
3. Évaluation du site selon la norme SANS62305, y compris le rapport

Consultancy service

28-Sep

162

21650

MacLean Trainer to be onsite for mixer t

Provide an external trainer from MacLean OEM for the mixer truck SS2-022 and  the sprayer machine to train KCC operators and up skills them to be able to operate this new equipment efficiently. Fournir un formateur externe de MacLean OEM pour le camion malaxeur SS2-022 et la machine de pulvérisation afin de former les opérateurs de KCC et de les perfectionner pour qu'ils soient en mesure d'utiliser efficacement ce nouvel équipement.

Consultancy service

28-Sep

163

21679

B4 rock breaker commissioning

B4 rock breaker commissioning. Mise en service du brise-roche B4

Consultancy service

28-Sep

164

21716

EQUIPER ET INSTALLER UNE RADIO COM A MUP

Broadcast equipment installation contractors/suppliers will be responsible for purchasing the equipment, commissioning it and training the personnel who will work on it.

 

---------------------

 

Les entrepreneurs/fournisseurs d’installation d’équipement de diffusion seront responsables de l’achat de l’équipement, de sa mise en service et de la formation du personnel qui y travaillera.

Communication

28-Sep

165

21558

Working at height services

While being on site the contractor will be walking through the site accompanied by a member from KCC who is familiar with the site and its processes, they will be observing all the areas where work is being done at height. They will then put together a document in the form of a report for the site highlighting any gaps that may be identified from a compliance point through to the correct equipment for the application at hand. This report will assist the site in controlling these high-risk tasks and will ensure that a global best practice is considered by the sight for each gap identified. It will be beneficial if this can be arranged during a shut down when there would be a lot of activity at height and in a confined space.

 

---------------------

 

Pendant qu'il sera sur place, l'entrepreneur se promènera sur le site accompagné d'un membre de KCC qui connaît le site et ses processus, ils observeront toutes les zones où des travaux sont effectués en hauteur. Ils établiront ensuite un document sous forme de rapport de chantier mettant en avant les éventuelles lacunes identifiées depuis un point de conformité jusqu'à l'équipement adapté à l'application concernée. Ce rapport aidera le site à contrôler ces tâches à haut risque et garantira qu'une meilleure pratique globale est prise en compte par le viseur pour chaque lacune identifiée. Il serait avantageux que cela puisse être organisé lors d'un arrêt lorsqu'il y aurait beaucoup d'activité en hauteur et dans un espace confiné.

Mining Service

28-Sep

166

21689

KTC Lightning Protection Project

A risk analysis to be conducted according to SANS/IEC 62305-2 will determine how statistically likely it is that losses due to lightning-related damage will occur on the mine. The standard will give tolerable values for the risks of damage and loss. This allowable value is compared to the calculated risk of the unprotected state of the object. Should the risk be higher than the tolerable values, a reduction to the risk is made by selecting lightning protection measures as defined in IEC 62305-3 and 4. The process is to be carried out with DEHN support software, and a report document to be created showing the results.

 

---------------------

 

Une analyse des risques qui sera menée conformément à la norme SANS/IEC 62305-2 déterminera la probabilité statistique que des pertes dues à des dommages liés à la foudre se produisent dans la mine. La norme donnera des valeurs tolérables pour les risques de dommages et de pertes. Cette valeur admissible est comparée au risque calculé de l'état non protégé de l'objet. Si le risque est supérieur aux valeurs tolérables, une réduction du risque est effectuée en sélectionnant des mesures de protection contre la foudre telles que définies dans les normes CEI 62305-3 et 4.Le processus doit être effectué avec le logiciel de support DEHN et un document de rapport doit être créé montrant les résultats.

Consultancy service

28-Sep

167

21667

KTC Digital Logsheets

KTC currently has over 40 logsheets in circulation for capturing plant data for either process control or metallurgical accounting purposes. These logsheets are mainly excel spreadsheets. Challenges have been encountered in the quality, accuracy, security of the manual logsheets. These excel logsheets are prone to file corruption resulting in data loss and significant amount of time rectifying the corrupted files.  Reporting is not accurate due to these excel spreadsheet malfunctions. The objective of digitalization of the logsheets is to eliminate the forementioned challenges and improve the reporting and storage of plant data. KTC is looking for a contractor to supply, install and support the digital logsheet system. The support and licensing are for a period of five (5) years.

 

---------------------

 

KTC dispose actuellement de plus de 40 feuilles de registre en circulation pour capturer les données de l'usine à des fins de contrôle des processus ou de comptabilité métallurgique. Ces feuilles de journal sont principalement des feuilles de calcul Excel. Des défis ont été rencontrés en termes de qualité, d'exactitude et de sécurité des feuilles de journalisation manuelles. Ces feuilles de journal Excel sont sujettes à la corruption de fichiers, ce qui entraîne une perte de données et un temps considérable pour rectifier les fichiers corrompus. Les rapports ne sont pas précis en raison de ces dysfonctionnements des feuilles de calcul Excel. L'objectif de la numérisation des feuilles de bord est d'éliminer les défis mentionnés ci-dessus et d'améliorer le reporting et le stockage des données de l'usine. KTC recherche un entrepreneur pour fournir, installer et prendre en charge le système de feuilles de bord numériques. Le support et la licence sont pour une durée de cinq (5) ans.

Consultancy service

28-Sep

168

21681

QUICK LOG GEOPHYSICS - ACOUSTIC TELEVIEW

KCC Geotechnical Unit is really concerned about the potential slope stability issues due to high variability in the slope design data which is introduced by the presence of highly deformed rock mass and variable structural orientations. These structures tend to control the stability of the pit slopes. As it has been highlighted through the HSEC and GRB findings, Geotechnical Data at KCC is below the desired design levels to meet the requirements for safe operations and for business continuity. The Acoustic Televiewer (ATV) Geophysical data acquisition process is required as part of the data quality control and assurance for KCC operations to meet the industry and Glencore safety and design standards.

 

---------------------

 

L'unité géotechnique de KCC est très préoccupée par les problèmes potentiels de stabilité des pentes dus à la grande variabilité des données de conception des pentes, introduite par la présence d'une masse rocheuse fortement déformée et d'orientations structurelles variables. Ces structures tendent à contrôler la stabilité des pentes des fosses. Comme cela a été souligné dans les conclusions du HSEC et du GRB, les données géotechniques de KCC sont inférieures aux niveaux de conception souhaités pour répondre aux exigences de sécurité des opérations et de continuité des activités. Le processus d'acquisition de données géophysiques Acoustic Televiewer (ATV) est requis dans le cadre du contrôle et de l'assurance de la qualité des données pour les opérations de KCC afin de répondre aux normes de sécurité et de conception de l'industrie et de Glencore.

Consultancy service

28-Sep

169

21694

KTC B3 BUMP STOP REPAIR

Over the past number of years, the B3 crusher ROM bin tip bump stop were damaged due to abrasion and mechanical damage from mobile machinery dumping ore into the bin, clearing blockages with an excavator and/or mobile rock breaker, and mechanical cleaning at the tip area. The structural integrity of the bump stop was impacted, and the height reduced to a point where it has become a safety risk for machines performing load & haul operations to B43 crusher.

 

---------------------

 

Au cours des dernières années, les butées de pointe de benne ROM du concasseur B3 ont été endommagées en raison de l'abrasion et des dommages mécaniques causés par des machines mobiles déversant du minerai dans la benne, nettoyant les blocages avec une excavatrice et/ou un brise-roche mobile et nettoyant mécaniquement à la pointe. zone. L'intégrité structurelle de la butée a été touchée et sa hauteur a été réduite à un point tel qu'elle est devenue un risque pour la sécurité des machines effectuant des opérations de chargement et de transport vers le concasseur B43.

Mining Service

28-Sep

170

21706

West Collapse Clean up and Kinga Sump Ex

a) Cut5A1 west collapse material has completely filled up the existing KOV Cut5A1 1370L catchment safety berm. This is the only critical control to manage the failure material.  With the coming of the rainy season beginning early October, there is high risk of the failure material to flow and block the access ramp to KOV Cut5A1

b) Tension cracks have been observed at KOV 1430RL on Eastern side at the old T3 yard area situated adjacent to the Kinga pool. The ponding water is caused by illegal miners digging activities and trenching that naturally collect the water. This pond is outside KCCs concession. The ponding water is infiltrating into the open tension cracks, eroding the highly weathered RATL and results in huge amounts of sediment washout and multi-bench sloughing failures in Cut 4 slope. Ground water seepages is observed in Cut 4 East slope and is causing continued slumping mechanism failures.

 

---------------------

 

a) Le matériau d'effondrement ouest du Cut5A1 a complètement rempli la berme de sécurité du bassin versant KOV Cut5A1 1370L existante. Il s’agit du seul contrôle critique permettant de gérer les matériaux défectueux. Avec l'arrivée de la saison des pluies qui débute début octobre, il existe un risque élevé que les matériaux de rupture s'écoulent et bloquent la rampe d'accès au KOV Cut5A1.

b) Des fissures de tension ont été observées au KOV 1430RL du côté Est de l'ancienne zone de triage T3 située à côté de la piscine Kinga. L'accumulation d'eau est causée par les activités de creusement et de tranchées des mineurs illégaux qui collectent naturellement l'eau. Cet étang se trouve en dehors de la concession de KCC. L'eau stagnante s'infiltre dans les fissures de tension ouvertes, érodant le RATL très altéré et entraînant d'énormes quantités de sédiments lessivés et des ruptures de desquamation à plusieurs bancs dans la pente de la coupe 4. Des infiltrations d'eau souterraine sont observées dans le versant est de la coupe 4 et provoquent des défaillances continues du mécanisme d'affaissement.

Mining Service

28-Sep

171

21723

KTC POND REPAIRS

This Scope of Services under this Contract include, but not limited to the following:

• Repair or break the concrete done by the previous contractor where required.
• Clean the pond and dispose at KCC designated area.
• Demolish where required some existing buried reinforced concrete foundations, bund wall and drains.
• Excavations and disposal of acid contaminated gravel material as instructed by KCC Engineer on site.
• Bulk earthworks including excavation, disposal, importing, backfilling and compaction of gravel material.
• Build a new concrete wall.
• The contractor may be required to demolish some existing buried reinforced concrete foundations, bundwall and drains.
• Excavations and disposal of acid contaminated gravel material as instructed by KCC Engineer on site.

 

---------------------

 

Cette étendue des services en vertu de ce contrat comprend, sans s'y limiter, les éléments suivants :

• Réparer ou briser le béton effectué par l'entrepreneur précédent lorsque requis.
• Nettoyez l'étang et jetez-le dans la zone désignée par KCC.
• Démolir, le cas échéant, certaines fondations en béton armé enterrées, les murs de diguement et les drains existants.
• Excavations et élimination des graviers contaminés par l'acide selon les instructions de l'ingénieur de KCC sur place.
• Travaux de terrassement en vrac comprenant l'excavation, l'élimination, l'importation, le remblayage et le compactage du gravier.
• Construisez un nouveau mur de béton.
• L'entrepreneur pourrait devoir démolir certaines fondations, murs de séparation et drains en béton armé existants.
• Excavations et élimination des graviers contaminés par l'acide selon les instructions de l'ingénieur de KCC sur place.

Mining Service

28-Sep

172

21725

BM6 & 7 TRIPS TROUBLESHOOTING

The Kamoto Copper Company (KCC) is a world class, responsible mining business in the Democratic Republic of Congo. KCC is in Kolwezi, in the province of Lualaba.Through the scale and nature of the business, KCC makes a significant and positive contribution to our local communities, the province, country, and broader society. Positive impacts range from production of raw materials that drive social progress, to the payment of taxes and royalties to the DRC government, provision of employment and business opportunities. KCC is an equal opportunity employer and actively promotes diversity in its workplace.
KCC’s Concentrator department (KTC) owns and operates the ball mills and seeks the services of the OEM of ball mill relays Power Plant Electrical Technologies (Pty) Ltd for onsite support on the investigation and fixing of repetitive trip on BM6&7 relays on a 12-month Service Contract.The vendor will focus on the supply of site and remote technical support to Kamoto Copper Company on fault finding for relays REM615, REF615 and the Prolinx module for a period of 12 months.

 

---------------------

 

La Kamoto Copper Company (KCC) est une entreprise minière responsable de classe mondiale en République démocratique du Congo. KCC se trouve à Kolwezi, dans la province du Lualaba.
Grâce à l'ampleur et à la nature de son activité, KCC apporte une contribution significative et positive à nos communautés locales, à la province, au pays et à la société dans son ensemble. Les impacts positifs vont de la production de matières premières qui favorisent le progrès social, au paiement d'impôts et de redevances au gouvernement de la RDC, en passant par la création d'emplois et d'opportunités commerciales.
KCC est un employeur garantissant l'égalité des chances et promeut activement la diversité sur son lieu de travail.
Le département Concentrateur de KCC (KTC) possède et exploite les broyeurs à boulets et sollicite les services de l'OEM des relais de broyeur à boulets Power Plant Electrical Technologies (Pty) Ltd pour une assistance sur site dans le cadre de l'enquête et de la correction des déclenchements répétitifs sur les relais BM6 et 7 sur une période de 12 mois. Contrat de service.
Le fournisseur se concentrera sur la fourniture d'une assistance technique sur site et à distance à Kamoto Copper Company pour la recherche de pannes pour les relais REM615, REF615 et le module Prolinx pour une période de 12 mois.

Mining Maintenance

28-Sep

173

21728

RME 10YEARS SERVICE REBUILD

The Kamoto Copper Company (KCC) is a world class, responsible mining business in the Democratic Republic of Congo. KCC is in Kolwezi, in the province of Lualaba.
Through the scale and nature of the business, KCC makes a significant and positive contribution to our local communities, the province, country, and broader society. Positive impacts range from production of raw materials that drive social progress, to the payment of taxes and royalties to the DRC government, provision of employment and business opportunities.KCC is an equal opportunity employer and actively promotes diversity in its workplace.KCC’s Concentrator department (KTC) seeks the services of Russel Mineral Equipment (RME) to carry out the servicing of the Mill Relining Machine (MRM) at KTC. The OEM will be required to manufacture, supply, install and commission all components  recommended for replacement as per the 10 Year Service Schedule.

 

---------------------

 

La Kamoto Copper Company (KCC) est une entreprise minière responsable de classe mondiale en République démocratique du Congo. KCC se trouve à Kolwezi, dans la province du Lualaba.
Grâce à l'ampleur et à la nature de son activité, KCC apporte une contribution significative et positive à nos communautés locales, à la province, au pays et à la société dans son ensemble. Les impacts positifs vont de la production de matières premières qui favorisent le progrès social, au paiement d'impôts et de redevances au gouvernement de la RDC, en passant par la création d'emplois et d'opportunités commerciales.
KCC est un employeur garantissant l'égalité des chances et promeut activement la diversité sur son lieu de travail.
Le département Concentrateur de KCC (KTC) sollicite les services de Russel Mineral Equipment (RME) pour effectuer l'entretien de la machine de regarnissage du broyeur (MRM) à KTC. Le FEO devra fabriquer, fournir, installer et mettre en service tous les composants recommandés pour le remplacement conformément au calendrier de service de 10 ans.

Consultancy service

28-Sep

174

21735

Labor Concrete Slab Expansion Lime Plant

Lime plant experience lop of mud during rainy season. This is a safety concern due the offloading of trucks using forklifts.

 

---------------------

 

L'usine de chaux fait l'expérience de la boue pendant la saison des pluies. Il s'agit d'un problème de sécurité en raison du déchargement des camions à l'aide de chariots élévateurs.

Mining Maintenance

28-Sep

175

21672

Survey IMDEX import and Validation Scrip

The Contractor will develop and remotely implement an automated process that will allow for the survey data received from IMDEX-Hub to be securely imported and validated into the geological data management system.

 

---------------------

 

L'entrepreneur développera et mettra en œuvre à distance un processus automatisé qui permettra d'importer et de valider en toute sécurité les données d'enquête reçues d'IMDEX-Hub dans le système de gestion des données géologiques.

Consultancy service

28-Sep

176

21736

Calibration for room thermometers

The calibration to be done in full compliance with calibration standards. The certificate of calibration to accompany the instruments.

 

---------------------

 

L'étalonnage doit être effectué en totale conformité avec les normes d'étalonnage.Le certificat d’étalonnage pour accompagner les instruments.

Calibration

28-Sep

177

21708

To perform the Weeding and Housekeeping

The Labor Provider shall provide twenty (25) General Labors to perform the weeding along Pipes, Conveyors belt and Process water Ponds and perform housekeeping inside andoutside the plant.

 

---------------------

 

Le fournisseur de main-d'œuvre fournira vingt (25) travaux généraux pour effectuer le désherbage le long desTuyaux, bandes transporteuses et bassins d'eau de traitement et effectuer l'entretien ménager à l'intérieur et à l'extérieur. de l'usine

Labor

28-Sep

178

21559

Senior surveyor

The scope of work for this service is to recruit a senior surveyor to support the survey department in executing open pit and underground surveying.The current performance of the survey team requires some improvement and with the acquisition of new equipments (scanners and drones), the current skill of the survey team is not up to the upgraded technology.The current roster of most senior staffs in the survey team put the team under pressure due to amount of tasks to perform and limited knowledge of the surveyor supervisor and assistants that should have provided the required support.

 

---------------------

 

La portée du travail pour ce service est de recruter un géomètre principal pour soutenir l'enquête.département dans l'exécution d'arpentages à ciel ouvert et souterrainsLa performance actuelle de l'équipe d'enquête nécessite certaines améliorations et avec l'acquisition de nouveaux équipements (scanners et drones), compétence actuelle de l'équipe d'enquête n'est pas à la hauteur de la technologie améliorée. La liste actuelle des cadres supérieurs de l’équipe d’enquête met l’équipe sous pression. en raison de la quantité de tâches à accomplir et des connaissances limitées du superviseur géomètre et assistants qui auraient dû fournir le soutien requis.

Mining Service

15-Sep

179

21612

KOV P2A DEWATERING EROSION REPAIRS

This Scope of Services under this Contract include, but not limited to the following:
• Construction of Gabion wall
• Backfilling and compaction of compromised section of the Dewatering Station P2A for stability and soil treatment.
• Rock filling of compromised section corroded away due to erosion after soil treatment.
• Pouring of mass concrete 30MPa as filler of rocky materials as part of erosion repair solution.
• Excavation of stormwater drainage.
• Supply and place gabion mattress on drainage excavation as subbase.

 

---------------------

 

Cette étendue des services en vertu de ce contrat comprend, sans s'y limiter, les éléments suivants :
• Construction d'un mur de gabions
• Remblayage et compactage de la section compromise de la station de déshydratation P2A pour la stabilité et le traitement des sols.
• L'enrochement de la section compromise a été corrodé en raison de l'érosion après le traitement du sol.
• Coulage de béton de masse 30MPa comme filler de matériaux rocheux dans le cadre d'une solution de réparation de l'érosion.
• Excavation du drainage des eaux pluviales.
• Fournir et placer un matelas de gabion sur l'excavation de drainage comme sous-couche.

Mining service

15-Sep

180

21655

LUILU ACCESS TO CRITICAL VALVES

Internal inspection conducted on the 18/08/2023 by Luilu structural team compliance as per attached report shows that various and a lot of manual valves installed since plant don’t have appropriate access while they require an high frequency to open and close them per day shift ,this expose peoples to access and currently peoples are using temporary scaffold which exposing peoples at W @ H and causing a long time during operation processes as they have to wait for erection also scaffold to be inspected by competent person ,this exercise on multiple frequency as above detailed generating a lot of peoples fatigues or even during maintenance on that valves. It becomes urgent to install appropriate access to allow peoples to work safely, minimize fatigue and downtime to comply with requirements and Glencore’s sustainability approach.

 

---------------------

 

L'inspection interne menée le 18/08/2023 par l'équipe structurelle de Luilu conformément au rapport ci-joint montre que diverses et nombreuses vannes manuelles installées depuis l'usine n'ont pas d'accès approprié alors qu'elles nécessitent une fréquence élevée pour les ouvrir et les fermer par jour. changement, cela expose les gens à l'accès et actuellement les gens utilisent un échafaudage temporaire qui expose les gens à W @ H et provoque un long temps pendant les processus de fonctionnement car ils doivent attendre le montage et l'échafaudage doit également être inspecté par une personne compétente, cet exercice sur plusieurs fréquences comme détaillé ci-dessus générant de la fatigue chez beaucoup de gens ou même lors de la maintenance de ces vannes. Il devient urgent d’installer des accès appropriés pour permettre aux personnes de travailler en toute sécurité, de minimiser la fatigue et les temps d’arrêt afin de se conformer aux exigences et à l’approche de développement durable de Glencore.

Mining Maintenance

15-Sep

181

21697

Luilu Camp Upgrade Phase 1 - Civil Work

Construct high standard rafter slabs which will facilitate the construction of the senior accommodation camp for the Luilu Camp Upgrade project.

 

---------------------

 

Construire des dalles de chevrons de haute qualité qui faciliteront la construction du camp d'hébergement des personnes et la modernisation du camp Luilu.

Mining service

15-Sep

182

21699

KTC CM5 Chilling System

The Kamoto Copper Company (KCC) is a world class, responsible mining business in the Democratic Republic of Congo. KCC is located in Kolwezi, in the province of Lualaba.
Through the scale and nature of the business, KCC makes a significant and positive contribution to our local communities, the province, country, and broader society. Positive impacts range from production of raw materials that drive social progress, to the payment of taxes and royalties to the DRC government, provision of employment and business opportunities.KCC is an equal opportunity employer and actively promotes diversity in its workplace. KCC’s Concentrator department (KTC) owns and operates the Trane Chillers on CM5 Cascade Mill and in the quest to improve the efficiency our HVAC equipment and their overall life span, KCC KTC is seeking the services of the OEM to carry out the Monthly, Quarterly & Annual Inspections and maintenance of the Trane Chillers for a three (3) year contract. The specifications of the equipment in question are listed below:
1.(Trane Model No.: RTAC400; Serial No.: EKW3180)-Chilled Water Pumps and Plate heat Exchanger
2.Chiller Skid 1(Chilled Water Pumps and Plate Heat Exchanger)
3.Chiller Skid 2(Chilled Water Pumps and Plate Heat Exchanger)
The vendor will focus on the major inspections of the Trane Chillers to cover monthly, quarterly, and annual inspections and attend to major breakdowns once called upon by the client.
La Kamoto Copper Company (KCC) est une entreprise minière responsable de classe mondiale en République démocratique du Congo.

 

---------------------

 

KCC est situé à Kolwezi, dans la province du Lualaba.
Grâce à l'ampleur et à la nature de son activité, KCC apporte une contribution significative et positive à nos communautés locales, à la province, au pays et à la société dans son ensemble. Les impacts positifs vont de la production de matières premières qui favorisent le progrès social, au paiement d'impôts et de redevances au gouvernement de la RDC, en passant par la création d'emplois et d'opportunités commerciales.
KCC est un employeur garantissant l'égalité des chances et promeut activement la diversité sur son lieu de travail.
Le département Concentrateur de KCC (KTC) possède et exploite les refroidisseurs Trane sur le broyeur à cascade CM5 et dans le but d'améliorer l'efficacité de nos équipements CVC et leur durée de vie globale, KCC KTC recherche les services de l'OEM pour effectuer les analyses mensuelles, trimestrielles et Inspections annuelles et maintenance des refroidisseurs Trane pour un contrat de trois (3) ans. Les spécifications des équipements en question sont listées ci-dessous :
1. (N° de modèle Trane : RTAC400 ; N° de série : EKW3180) - Pompes à eau réfrigérée et échangeur de chaleur à plaques
2. Chiller Skid 1 (pompes à eau réfrigérée et échangeur de chaleur à plaques)
3.Chiller Skid 2 (pompes à eau réfrigérée et échangeur de chaleur à plaques)
Le fournisseur se concentrera sur les inspections majeures des refroidisseurs Trane pour couvrir les inspections mensuelles, trimestrielles et annuelles et s'occupera des pannes majeures à la demande du client.

Consultancy service

15-Sep

183

21704

33KV NEW AND OLD LUILU INTERCONNECTING

To get to the maximum use of power that will be generated by the steam turbine generator from the acid plant, it is required that both old and new Luilu main substations respectively connected under 15kV and 33kV be interconnected thru an interconnecting transformer. This project aims the full installation and commissioning of the said transformer.

 

---------------------

 

Pour utiliser au maximum l'énergie qui sera générée par le générateur à turbine à vapeur de l'usine d'acide, Il est nécessaire que les anciennes et les nouvelles sous-stations principales de Luilu, respectivement connectées sous 15 kV et 33 kV, soientinterconnectés via un transformateur d’interconnexion. Ce projet vise l'installation complète et la mise en service duledit transformateur.

Electrical service

15-Sep

184

21707

NEW SEWAGE CHAMBER CONSTRUCTION

The construction of new sewage chamber at KTO toilet will resolve issue of daily overflow with existing septic tank which the capacity is insufficient to contain 24 seats toilet connected to this one; will improve also the conditions of the toilet area which are in unsanitary conditions because of foul odors around all area. This scope of works details the steps the contractor must undertake to do construction of new sewage chamber.

 

---------------------

 

La construction d'une nouvelle chambre d'épuration des toilettes KTO résoudra le problème de débordement quotidien avec la fosse septique existante dont la capacité est insuffisante pour contenir des toilettes de 24 places connectées à celle-ci ; améliorera également les conditions des toilettes qui sont dans des conditions insalubres en raison des odeurs nauséabondes dans toute la zone.
Cette portée des travaux détaille les étapes que l'entrepreneur doit entreprendre pour construire la nouvelle chambre d'épuration.

civil works

15-Sep

185

21404

Transcom (USD)

FERI/CD CERTIFICATE CHARGES. FRAIS DE CERTIFICAT

Consultancy service

15-Sep

186

21407

Transcom (USD)

FERI/CD CERTIFICATE CHARGES. FRAIS DE CERTIFICAT

Consultancy service

15-Sep

187

21684

ICAM traning for HST Staff & Leaders

ICAM traning for HST Staff & Leaders.

 

---------------------

 

Formation ICAM pour le personnel et les dirigeants HSE

Training Service

15-Sep

188

21685

NOSA/SAMTRAC Training for HST Staff

NOSA/SAMTRAC Training for HST Staff.

 

---------------------

 

Formation NOSA/SAMTRAC pour le personnel HST

Training Service

15-Sep

189

21686

DB and feeders scada monitoring

1. Monitoring of 550Vac of 186 Feeders ON/OFF status on scada,
2. Monitoring of 550Vac of 39 DBs ON/OFF status on scada,
3. Built separate profibus or profinet network for DBs in 4 substations (Mills-Flottation),
4. Install and connect all BDs to stand-alone PLC 1500 in 4 substations (Mills-Flottation),
5. Send On/Off status of DBs and feeders to the scada through PLC1500,
6. Provide, Install and connect 10 units 110VAC 5000VA each UPS to supply each DB control circuit in each substation.

 

---------------------

 

1.Surveillance de l'état ON/OFF des 550Vac des 186 départs sur scada,
2. Surveillance de l'état ON/OFF de 550Vac de 39 DBs sur scada,
3. Construction d'un réseau Profibus ou Profinet séparé pour les bases de données dans 4 sous-stations (Mills-Flottation),
4. Installez et connectez tous les BD au PLC 1500 autonome dans 4 sous-stations (Mills-Flottation),
5. Envoyer l'état marche/arrêt des bases de données et des mangeoires au scada via PLC1500,
6. Fournir, installer et connecter 10 unités 110VAC 5000VA chaque UPS pour alimenter
chaque circuit de contrôle DB dans chaque sous-station.

Consultancy service

15-Sep

190

21579

Maintenance of occupational health equipment

Maintenance of occupational health equipment.

 

---------------------

 

Assurer la maintenance et l’étalonnage annuel des équipements de la médecine du travail :

-   4 visio-testeurs Titmus, fabriqués par Titmus LCC ;
-   7 audiomètres Tremetrics, fabriqués par Maico Diagnostics GmbH ;
-   3 spiromètre EasyOne-PC fabriqué par NDD Medizintechnik AG ;
-   6 cabines d’audiométrie AX1 fabriquées par Propanels et Amtronix ;
-   1 logiciel AMS élaboré par Amtronix ;
-   3 seringues d’étalonnage de 3 litres fabriquée par Amtronix.

Les services doivent être accomplis conformément aux spécifications et standards des fabricants

Maintenance Service

1-Sep

191

21459

KTC Auto-sampler Design

KTC Auto-sampler Design. Conception de l'échantillonneur automatique KTC

Consultancy service

1-Sep

192

21628

Thermal drone survey & RGB pictures / Video of 120kV powerlines

The service is to have a Drone survey for power lines inspections: 120KV Lines from Snel to KCC and 15KV Lines supplying KCC plants.

 

---------------------

 

Le service consiste à réaliser une étude par drone pour l'inspection des lignes électriques : lignes 120KV de Snel à KCC et lignes 15KV alimentant les centrales KCC.

Mining service

1-Sep

193

21631

Quarterly stocktake of Cu and CoH stock

KCC is storing a significant quantity of copper and cobalt on site which need to be included under the Group’s cargo insurance policy (Mastery in stock take)Compliance with the business requirement to perform a full cycle count and a full inventory at least four times a year by a third party.This operation is necessary to meet the requirements of financial management and audits (internal audit, external audit, OHADA, Glencore).

 

---------------------

 

KCC stocke sur place une quantité importante de cuivre et de cobalt qui doit être incluse dans la politique d’assurance cargo du Groupe (Maîtrise en inventaire)Respect de l'exigence commerciale d'effectuer un inventaire complet et un inventaire complet au moins quatre fois par an par un tiers.Cette opération est nécessaire pour répondre aux exigences de gestion financière et d’audit (audit interne, audit externe, OHADA, Glencore).

Mining service

1-Sep

194

21638

KTO BUILDING TOILET REFURSHIMENT

The Renovation of Kamoto Building Toilet will resolve issue of actual toilet’s conditions which are poor and unsanitary. This proposal scope will improve Plumbing installation to provide sufficient flow, will short out matters of insufficient lighting in sanitary facilities, will provide proper ventilation by new extractor fans to be installed, will Refreshment walls by paints and tilling floor and wall for a good sanitary condition.

 

---------------------

 

La rénovation des toilettes du bâtiment Kamoto résoudra le problème des conditions réelles des toilettes qui sont mauvaises et insalubres.La portée de cette proposition améliorera l'installation de plomberie pour fournir un débit suffisant, résoudra les problèmes d'éclairage insuffisant dans les installations sanitaires, assurera une ventilation adéquate grâce à de nouveaux ventilateurs d'extraction à installer, rafraîchira les murs par des peintures et labourera le sol et les murs pour un bon état sanitaire.

Mining service

1-Sep

195

21642

T17 Pre Feasibility Study: VWP Drilling

This scope of work is to drill and install twelve (12) VWP installations up to a maximum depth of 320m around the T17 pit perimeter and to install automated datalogging systems on those drilled as part of the Concept Level Study.Three of the VWPs will be lugeon packer tested with up to 10 tests conducted during the drilling process. Following the successful drilling of these three holes, they will be equipped with up to 10 VWP sensors at varying depths attached to a 1-inch uPVC casing. The remaining nine VWPs within the program will not undergo lugeon packer testing during drilling and will be equipped with only 5 VWP sensors. All holes should be drilled using a diamond core method and a standard PQ diameter size.

 

---------------------

 

Cette portée des travaux consiste à forer et à installer douze (12) installations VWP jusqu'à une profondeur maximale de 320 m autour du périmètre de la fosse T17 et à installer des systèmes d'enregistrement de données automatisés sur celles forées dans le cadre de l'étude de niveau conceptuel.Trois des VWP seront testés au lugeon packer avec jusqu'à 10 tests effectués pendant le processus de forage. Après le forage réussi de ces trois trous, ils seront équipés de jusqu'à 10 capteurs VWP à différentes profondeurs fixés à un boîtier en PVC de 1 pouce. Les neuf VWP restants du programme ne subiront pas de tests de lugeon packer pendant le forage et seront équipés de seulement 5 capteurs VWP. Tous les trous doivent être percés à l'aide d'une méthode de carottage au diamant et d'un diamètre PQ standard.

Mining service

1-Sep

196

21653

IDS GEORADAR SUPPORT MAINTENANCE

This scope of work is for Off-shore and on-shore maintenance support of IDS GeoRadar systems. Cette portée de travail concerne le support de maintenance en mer et à terre des systèmes IDS GeoRadar.

Maintenance Service

1-Sep

197

21655

LUILU ACCESS TO CRITICAL VALVES

Internal inspection conducted on the 18/08/2023 by Luilu structural compliance team as per attached report  shows that  various and a lot of manual valves installed since plant construction all over the plant don’t have appropriate access while they require an high frequency to open and close them per day shift; this expose peoples to access and currently peoples are using temporary scaffold which exposing peoples at W@H and causing a long down time during operation processes as they have to wait for erection also  scaffold to be inspected by competent person and generating a lot of people's fatigue   or even while doing maintenance on it.It became urgent to install appropriate access to allow peoples to work safely, minimize fatigue and downtime   to comply with requirements and Glencore’s sustainability approach.

 

---------------------

 

L'inspection interne menée le 18/08/2023 par l'équipe de conformité structurelle de Luilu selon le rapport ci-joint montre que diverses et nombreuses vannes manuelles installées depuis la construction de l'usine dans toute l'usine n'ont pas d'accès approprié alors qu'elles nécessitent une fréquence d'ouverture élevée. et les fermer par équipe de jour ; cela expose les gens à l'accès et actuellement les gens utilisent des échafaudages temporaires qui exposent les gens chez W@H et provoquent un long temps d'arrêt pendant les processus d'exploitation car ils doivent attendre le montage et l'échafaudage doit également être inspecté par une personne compétente et génère beaucoup de fatigue des gens. ou même en effectuant une maintenance dessus.Il est devenu urgent d’installer des accès appropriés pour permettre aux personnes de travailler en toute sécurité, de minimiser la fatigue et les temps d’arrêt afin de se conformer aux exigences et à l’approche de développement durable de Glencore.

Mining service

1-Sep

198

21670

LUILU BACHE UMBA SMPP & EI INSTALLATION

New lime tank and pumps system installation, this tank as additional in flow sheet will help to increase the lime capacity supply required to cover Cobalt and Neutralization and will significantly reduce the lime pollution and avoid environmental issue related to as we are facing currently to comply with requirements and Glencore’s sustainability approach.

 

---------------------

 

Installation d'un nouveau réservoir de chaux et d'un système de pompes, ce réservoir en plus dans le schéma de flux contribuera à augmenter la capacité d'approvisionnement en chaux requise pour couvrir le cobalt et la neutralisation et réduira considérablement la pollution par la chaux et évitera les problèmes environnementaux liés à ceux auxquels nous sommes actuellement confrontés. exigences et l'approche de Glencore en matière de développement durable.

Mining service

1-Sep

199

21649

KTC - Main Entrance Road Repairs

This scope of works describes the civil works required for heavy vehicle road to KTC and stormwater drainage as part of the KTC entrance road . The KTC entrance road  is shown in the blue line  in figure 1 above. The road widths are 6m wide for minor roads and 10m width for main access roads. Typical road cross-section is cambered with drains on both side as shown in figure 2. Total length of roads approximately 0.8 kilometers.

 

---------------------

 

Cette étendue des travaux décrit les travaux de génie civil requis pour la route des poids lourds menant au KTC et le drainage des eaux pluviales dans le cadre de la route d'entrée du KTC. La route d’entrée du KTC est représentée par la ligne bleue dans la figure 1 ci-dessus. La largeur des routes est de 6 m pour les routes secondaires et de 10 m pour les routes d'accès principales. La section transversale typique de la route est cambrée avec des drains des deux côtés, comme le montre la figure 2. La longueur totale des routes est d'environ 0,8 kilomètre.

Mining Maintenance

1-Sep

200

21656

Inventory Demand Cataloger Contract Cost

The contractor will provide qualified personnel who will work under the supervision of the Inventory Demand Team and will be responsible for submitting creation requests in SAP according to KCC procedures and ensuring that the process is monitored until the creation of stock codes. The battery limits for the project are all cataloguing change request.

 

---------------------

 

L'entrepreneur fournira du personnel qualifié qui travaillera sous la supervision de l'équipe de demande d'inventaire et sera responsable de soumettre les demandes de création dans SAP conformément aux procédures KCC et de veiller à ce que le processus soit surveillé jusqu'à la création des codes de stock. Les limites de batterie pour le projet sont toutes des demandes de changement de catalogage.

Consultancy service

1-Sep

201

21674

EW CATHODES BLANKS REPAIR Part 2

Cathodes refurbishment will improve current efficiency at Cu EW.This scope of works details the steps the contractor must undertake to refurbish cathodes.

 

---------------------

 

La remise à neuf des cathodes améliorera l'efficacité actuelle à Cu EW.Cette étendue des travaux détaille les étapes que l'entrepreneur doit entreprendre pour remettre à neuf les cathodes.

Mining service

1-Sep

202

21675

ACID PLANT CAUSTIC BUND AREA REPAIR

§ The Contractor is at liberty to insert a rate of his own choosing for each item in the bill of quantities.
§ Unless otherwise stated, items are measured net in accordance with the drawings, and no allowance has been made for waste in the quantities, any allowance for waste must be included in the rates.
§ The prices and rates to be inserted in the bill of quantities are to be the full inclusive prices to the Employer for the work described under the several items. Such prices shall cover all costs and expenses that may be required for the work described, and shall cover the cost of all general risks, liabilities, and obligations set forth or implied in the documents on which the contract is based.
§ A price or rate is to be entered against each item in the bill of quantities, whether the quantities are stated or not. An item against which no price is entered will be covered by the other prices or rates in the bill of quantities.
§ Rates inserted in the bill of quantities shall allow for all abnormal working hours as may be necessary to execute the works.
§ All rates are to be calculated to two decimals unless otherwise stated in the bill of quantities.
§ During the execution of the contract care is to be taken not to damage any existing structure, pipelines, services or equipment. Any damage to such is to be restored to the original conditions at the expense of the Contractor.

 

---------------------

 

L'Entrepreneur est libre d'insérer un tarif de son choix pour chaque article du devis quantitatif.
§ Sauf indication contraire, les articles sont mesurés nets conformément aux dessins, et aucune allocation n'a été faite pour les déchets dans les quantités, toute allocation pour les déchets doit être incluse dans les tarifs.
§ Les prix et tarifs à insérer dans le devis quantitatif doivent être les prix tout compris à l'Employeur pour les travaux décrits sous les différents articles. Ces prix couvriront tous les coûts et dépenses qui peuvent être nécessaires pour les travaux décrits, ainsi que le coût de tous les risques généraux, responsabilités et obligations énoncés ou implicites dans les documents sur lesquels le contrat est basé.
§ Un prix ou un taux doit être inscrit pour chaque article du devis quantitatif, que les quantités soient indiquées ou non. Un article pour lequel aucun prix n'est inscrit sera couvert par les autres prix ou tarifs du devis quantitatif.
§ Les tarifs insérés dans le devis quantitatif tiendront compte de toutes les heures anormales de travail qui pourraient être nécessaires à l'exécution des travaux.
§ Tous les tarifs doivent être calculés avec deux décimales, sauf indication contraire dans le devis quantitatif.
§ Pendant l'exécution du contrat, il convient de veiller à ne pas endommager les structures, canalisations, services ou équipements existants. Tout dommage doit être remis dans son état d'origine aux frais de l'entrepreneur.

Mining service

1-Sep

203

21621

Service & Maintenance BG4 Sets

BG4 breathing apparatus is life sustaining piece of equipment used by the MRT to respond to underground emergencies. These BG4 breathing apparatus must be inspected and serviced by a manufacturer approved servings agent annually to comply with underground mining legislation. The MRT team has 38 BG4 breathing apparatus that must be inspected and serviced.
The MRT teams also need to be trained in the safe use and operation of the BG4 apparatus  to be able them to respond to fires and incidents underground. All training is based on the O.E.M’s accepted practices for the BG4 and generally accepted associated rescue work. It is not just sufficient to train the MRT teams in the basic use of the BG4 breathing apparatus but to give them skills and procedures to be able to work safely during fires and incidents.

 

---------------------

 

L'appareil respiratoire BG4 est un équipement de survie utilisé par le MRT pour répondre aux urgences souterraines. Ces appareils respiratoires BG4 doivent être inspectés et entretenus chaque année par un agent de service approuvé par le fabricant afin de se conformer à la législation sur les mines souterraines. L'équipe MRT dispose de 38 appareils respiratoires BG4 qui doivent être inspectés et entretenus.
Les équipes MRT doivent également être formées à l'utilisation et au fonctionnement en toute sécurité de l'appareil BG4 pour pouvoir répondre aux incendies et incidents souterrains. Toute la formation est basée sur les pratiques acceptées par l’O.E.M pour le BG4 et sur les travaux de sauvetage associés généralement acceptés. Il ne suffit pas seulement de former les équipes MRT à l'utilisation de base de l'appareil respiratoire BG4 mais de leur donner les compétences et les procédures pour pouvoir travailler en toute sécurité lors d'incendies et d'incidents.

Mining Maintenance

1-Sep

204

21676

P7 DISCHARGE MANIFOLD FAB & INSTALLATION

Luilu Plant receives its primary freshwater supply from KOV boreholes via P6 and P7 pump stations. P6 and P7 are boosting pump stations that feed Koppi Dam which in turn supplies freshwater to Luilu Plant by gravity.As part of KOV dewatering network improvements, P7 pump station discharge manifold has been identified as one the items requiring urgent attention to improve the station reliability and subsequently sustain production. The current discharge manifold is highly deteriorated causing significant downtime of the pumping station. The current scope of works consists of fabricating a dimensionally identical discharge manifold to replace the existing. The manifold is fabricated out a DN1000 CS pipe schedule XS and 6-off DN300 nozzles as well as 6-off DN300 spools.The dismantling and installation of the new manifold will be conducted during shutdown, therefore will require 24h shift rotation to ensure works are completed within the allocated shutdown time.

 

---------------------

 

L'usine de Luilu reçoit son principal approvisionnement en eau douce des forages KOV via les stations de pompage P6 et P7. P6 et P7 renforcent les stations de pompage qui alimentent le barrage de Koppi, qui à son tour fournit de l'eau douce à l'usine de Luilu par gravité.
Dans le cadre des améliorations du réseau de déshydratation KOV, le collecteur de refoulement de la station de pompage P7 a été identifié comme l'un des éléments nécessitant une attention urgente pour améliorer la fiabilité de la station et par la suite soutenir la production. Le collecteur de refoulement actuel est fortement détérioré provoquant un arrêt important de la station de pompage.L’étendue actuelle des travaux consiste à fabriquer un collecteur de refoulement dimensionnellement identique pour remplacer l’existant. Le collecteur est fabriqué à partir d'un tuyau DN1000 CS de type XS et de buses DN300 à 6 sorties ainsi que de bobines DN300 à 6 sorties.Le démontage et l'installation du nouveau collecteur seront effectués pendant l'arrêt et nécessiteront donc une rotation des équipes de 24 heures pour garantir que les travaux soient terminés dans le temps d'arrêt alloué.

Mining Maintenance

1-Sep

205

21651

ONSITE EMPLOYEE COUNSELLING SERVICES

Provide onsite employee councelling services (a face-to-face counselling service under the EAP locally in the DRC) to support employees’ emotional and psychological wellbeing with expert counselling by professionals trained in violence and harassment counselling, as well as assisting employees in resolving personal problems that may be adversely affecting their work performance.

 

---------------------

 

Fournir des services de conseil aux employés sur place (un service de conseil en face-à-face dans le cadre du PAE localement en RDC) pour soutenir le bien-être émotionnel et psychologique des employés avec des conseils d'experts par des professionnels formés au conseil en matière de violence et de harcèlement, ainsi qu'en aidant les employés à résoudre des problèmes personnels. problèmes pouvant nuire à leur performance au travail.

Consultancy service

1-Sep

206

21681

QUICK LOG GEOPHYSICS - ACOUSTIC TELEVIEW

KCC Geotechnical Unit is really concerned about the potential slope stability issues due to high variability in the slope design data which is introduced by the presence of highly deformed rock mass and variable structural orientations. These structures tend to control the stability of the pit slopes. As it has been highlighted through the HSEC and GRB findings, Geotechnical Data at KCC is below the desired design levels to meet the requirements for safe operations and for business continuity. The Acoustic Televiewer (ATV) Geophysical data acquisition process is required as part of the data quality control and assurance for KCC operations to meet the industry and Glencore safety and design standards. The variation in the structural setup at KCC is very complex due to a number of deformation events that has taken place in the area. This makes the geotechnical model and slope designs very difficult from a stability point of view. Better understanding of these complexities requires specialist data acquisition tools like that of the ATV. The request for Acoustic Televiewer work to be undertaken for KCC requires a contractor that has a high level of requisite expertise, skills, capabilities, and resources which are extensive in the region and in the DRC, which shall include having experience at KCC.The work will be covering both Exploration and Geotechnical Drilling works for T17 Project, Mashamba East Pit and KOV Pit.

 

---------------------

 

L'unité géotechnique de KCC est très préoccupée par les problèmes potentiels de stabilité des pentes dus à la grande variabilité des données de conception des pentes, introduite par la présence d'une masse rocheuse fortement déformée et d'orientations structurelles variables. Ces structures tendent à contrôler la stabilité des pentes des fosses. Comme cela a été souligné dans les conclusions du HSEC et du GRB, les données géotechniques de KCC sont inférieures aux niveaux de conception souhaités pour répondre aux exigences de sécurité des opérations et de continuité des activités. Le processus d'acquisition de données géophysiques Acoustic Televiewer (ATV) est requis dans le cadre du contrôle et de l'assurance de la qualité des données pour les opérations de KCC afin de répondre aux normes de sécurité et de conception de l'industrie et de Glencore.La variation de la configuration structurelle de KCC est très complexe en raison d'un certain nombre d'événements de déformation survenus dans la région. Cela rend le modèle géotechnique et la conception des pentes très difficiles du point de vue de la stabilité. Une meilleure compréhension de ces complexités nécessite des outils spécialisés d’acquisition de données comme celui de l’ATV. La demande de travaux de téléspectateur acoustique à entreprendre pour KCC nécessite un entrepreneur possédant un haut niveau d'expertise, de compétences, de capacités et de ressources requises qui sont étendues dans la région et en RDC, ce qui doit inclure une expérience chez KCC.
Les travaux couvriront à la fois les travaux d'exploration et de forage géotechnique pour le projet T17, la fosse Mashamba Est et la fosse KOV.

Mining service

1-Sep

207

21579

Maintenance of occupational health equipment

Maintenance of occupational health equipment.

 

---------------------

 

Entretien des equipements de l'hopital.

Maintenance Service

28-Aug

208

21526

KTO Ground Support Review

KTO uses ground support elements to support the development ends and the stoping areas in the room and pillar.  The current support standards were last updated in March 2019 and the mine has developed into new mining areas. The Geotechnical Review Board (GRB) in October 2022 recommended a review of the current standards and perform empirical calculations and numerical simulations on the support performance as there is a risk associated with poor performing support that could lead to fall of ground accidents which may in turn lead to equipment damage and fatalities. It has been recommend that this support design review be executed and supported by an independent and competent external review.

 

---------------------

 

KTO utilise des éléments de soutènement au sol pour soutenir les extrémités de développement et les zones d'arrêt dans la salle et le pilier. Les normes de soutien actuelles ont été mises à jour pour la dernière fois en mars 2019 et la mine s'est développée en de nouvelles zones minières. Le Comité d'examen géotechnique (GRB) a recommandé en octobre 2022 de revoir les normes actuelles et d'effectuer des calculs empiriques et des simulations numériques sur les performances du soutènement, car il existe un risque associé à un soutènement peu performant qui pourrait entraîner des accidents de chute au sol qui pourraient à leur tour entraîner des dommages matériels et des décès. Il a été recommandé que cet examen de la conception du support soit exécuté et appuyé par un examen externe indépendant et compétent.

Consultancy service

28-Aug

209

21542

KITD Electrical work

A survey was conducted 3-Apr on KITD material to establish the volume of the material available for processing.  The volume of the material is 4,065,375 m3 which equates to 6,220,024 dry tons of material at a bulk density of 1.8 t/m3 and 15% moisture.

 

---------------------

 

Une enquête a été menée le 3 avril sur le matériel KITD afin d'établir le volume de matériel disponible pour le traitement. Le volume du matériau est de 4 065 375 m3, ce qui équivaut à 6 220 024 tonnes sèches de matériau à une densité apparente de 1,8 t/m3 et 15 % d'humidité.

Mining service

28-Aug

210

21600

Loading of IX Column Materials

To provide the Load out / transport crews with a full time 100 tonne crane as well as a 50-tonne support crane, multiple forklifts, trucks completed with the rigging crew, the labour and all the rigging gear for the loading of the resin column sections onto the designated transporters abnormal load road transport trailers. The columns are currently stored at ND Engineering’s storage yard Hammarsdale Durban.

 

---------------------

 

Fournir aux équipes de chargement/transport une grue à temps plein de 100 tonnes ainsi qu'une grue de support de 50 tonnes, plusieurs chariots élévateurs, des camions complétés avec l'équipe de gréage, la main d'œuvre et tout le matériel de gréage pour le chargement des sections de colonnes de résine. sur les transporteurs désignés pour les remorques de transport routier de charges anormales. Les colonnes sont actuellement stockées dans le parc de stockage de ND Engineering, Hammarsdale Durban.

Mining service

28-Aug

211

21630

Drilling Supervision for Environmental

The scope is outlined as follows:
· Provide review of selected drilling sites for the environmental monitoring boreholes.
· Supervise the drilling and construction of environmental monitoring boreholes with the
Kamoto Copper Company area.
· Supervise hydraulic testing and water quality testing of dewatering boreholes provide
regular reports to the mine technical team.
· Compile a comprehensive report of all activities undertaken as part of the drilling.

 

---------------------

 

· Construction and testing of the environmental drilling boreholes.La portée est décrite comme suit :
· Fournir un examen des sites de forage sélectionnés pour les forages de surveillance environnementale.
· Superviser le forage et la construction de forages de surveillance environnementale avec le
Zone de la société Kamoto Copper.
· Superviser les tests hydrauliques et les tests de qualité de l'eau des forages d'assèchement pour fournir
rapports réguliers à l'équipe technique de la mine.
· Compiler un rapport complet de toutes les activités entreprises dans le cadre du forage.

· Construction et test des forages environnementaux.

Mining service

28-Aug

212

21631

Quarterly stocktake of Cu and CoH stock

KCC is storing a significant quantity of copper and cobalt on site which need to be included under the Group’s cargo insurance policy (Mastery in stock take).Compliance with the business requirement to perform a full cycle count and a full inventory at least four times a year by a third party.This operation is necessary to meet the requirements of financial management and audits (internal audit, external audit, OHADA, Glencore).

 

---------------------

 

KCC stocke sur site une quantité importante de cuivre et de cobalt qui doit être incluse dans la politique d'assurance des marchandises du Groupe (Maîtrise de l'inventaire). Respect de l'exigence commerciale d'effectuer un inventaire complet et un inventaire complet au moins quatre fois par an. année par un tiers. Cette opération est nécessaire pour répondre aux exigences de gestion financière et d’audit (audit interne, audit externe, OHADA, Glencore).

Mining service

28-Aug

213

21654

COMMISSIONING OF THE NEW KADI R 40MVA

COMMISSIONING OF THE NEW KADI R 40MVA.

 

---------------------

 

MISE EN SERVICE DU NOUVEAU KADI R 40MVA

Maintenance Service

28-Aug

214

21655

LUILU ACCESS TO CRITICAL VALVES

Internal inspection conducted on the 18/08/2023 by Luilu structural compliance team as per attached report  shows that  various and a lot of manual valves installed since plant construction all over the plant don’t have appropriate access while they require an high frequency to open and close them per day shift; this expose peoples to access and currently peoples are using temporary scaffold which exposing peoples at W@H and causing a long down time during operation processes as they have to wait for erection also  scaffold to be inspected by competent person and generating a lot of people's fatigue   or even while doing maintenance on it.It became urgent to install appropriate access to allow peoples to work safely, minimize fatigue and downtime   to comply with requirements and Glencore’s sustainability approach.

 

---------------------

 

L'inspection interne menée le 18/08/2023 par l'équipe de conformité structurelle de Luilu selon le rapport ci-joint montre que diverses et nombreuses vannes manuelles installées depuis la construction de l'usine dans toute l'usine n'ont pas d'accès approprié alors qu'elles nécessitent une fréquence d'ouverture élevée. et les fermer par équipe de jour ; cela expose les gens à l'accès et actuellement les gens utilisent des échafaudages temporaires qui exposent les gens chez W@H et provoquent un long temps d'arrêt pendant les processus d'exploitation car ils doivent attendre le montage et l'échafaudage doit également être inspecté par une personne compétente et génère beaucoup de fatigue des gens. ou même lors de la maintenance. Il est devenu urgent d'installer un accès approprié pour permettre aux personnes de travailler en toute sécurité, minimiser la fatigue et les temps d'arrêt afin de se conformer aux exigences et à l'approche de développement durable de Glencore.

Mining service

28-Aug

215

21660

LEACH-ACID DILUTION TANK REFURBISHMENT

We currently feed the leaching system from tank 10, with the mixing system operated by the agitator. Whereas we are able feed a single leach train with tank 11. To be able to feed all leaching tanks with diluted solution from tank 11 and tank 9 while tank 10 is a backup, we need a full refurbishment of tank 9 with an in-line mixing system. Also, tank 9 and 10 top structure needs to be repaired and these tank need to be covered to avoid the top structure corrosion as experienced.

 

---------------------

 

Nous alimentons actuellement le système de lixiviation à partir du réservoir 10, avec le système de mélange actionné par l'agitateur. Alors que nous sommes capables d'alimenter un seul train de lixiviation avec le réservoir 11. Pour pouvoir alimenter tous les réservoirs de lixiviation avec la solution diluée du réservoir 11 et du réservoir 9 pendant que le réservoir 10 est une réserve, nous avons besoin d'une remise à neuf complète du réservoir 9 avec un système en ligne. système de mélange. De plus, la structure supérieure des réservoirs 9 et 10 doit être réparée et ces réservoirs doivent être recouverts pour éviter la corrosion de la structure supérieure comme cela a été le cas.

Mining service

28-Aug

216

21661

Infrared Thermography Level 2 Training

. Trains the candidates regarding the machinery lubricantion, Recommend improvements on the training module (theory and practical), Validate and or certify the trainers according to the standards.

 

---------------------

 

Forme les candidats concernant la lubrification des machines, Recommande des améliorations sur le module de formation (théorie et pratique), Valide et/ou certifie les formateurs selon les normes.

Training

28-Aug

217

21662

Vibration Analysis ISO CAT2 training

Trains the candidates regarding the machinery lubricantion, Recommend improvements on the training module (theory and practical), Validate and or certify the trainers according to the standards.

 

---------------------

 

Forme les candidats concernant la lubrification des machines, Recommande des améliorations sur le module de formation (théorie et pratique), Valide et/ou certifie les formateurs selon les normes.

Training

28-Aug

218

21663

Field Lubrification Analysis MLA I/MLT I

Field Lubrification Analysis MLA I/MLT I

Consultancy service

28-Aug

219

21666

Accreditate provider according to the KCC standards

Accreditate provider according to the KCC standards.

 

---------------------

 

Accréditer le prestataire selon les normes KCC

Consultancy service

28-Aug

220

21671

Datamine services

Kamoto Copper Company (KCC) seeks a secondment of grade control geologists from Datamine to collaborate directly with their team, facilitating grade control activities at their site. The assigned resources will be responsible for the following tasks:

• Planning RC Holes: The geologists will plan RC holes for areas requiring accurate modelling.
• Grade Control Model Updates: They will update the existing grade control model or develop new models for specific benches.
• Flitches and Block-Outlines: The resources will create flitches and block outlines, ensuring accurate mining block depletion.
• Evaluation Report: Geologists will generate an evaluation report, providing insights into grade control effectiveness.
• Monthly Reconciliation Report: The team will produce a comprehensive reconciliation report at the end of each month.

 

---------------------

 

Kamoto Copper Company (KCC) recherche un détachement de géologues de contrôle de teneur de Datamine pour collaborer directement avec leur équipe, facilitant les activités de contrôle de teneur sur leur site. Les ressources assignées seront responsables des tâches suivantes :
• Planification des trous RC : Les géologues planifieront les trous RC pour les zones nécessitant une modélisation précise.
• Mises à jour du modèle de contrôle de pente : ils mettront à jour le modèle de contrôle de pente existant ou développeront de nouveaux modèles pour des bancs spécifiques.
• Flitches et contours de blocs : les ressources créeront des flitchs et des contours de blocs, garantissant ainsi un épuisement précis des blocs miniers.
• Rapport d'évaluation : les géologues généreront un rapport d'évaluation, fournissant un aperçu de l'efficacité du contrôle des niveaux.
• Rapport de rapprochement mensuel : l'équipe produira un rapport de rapprochement complet à la fin de chaque mois.

Mining service

28-Aug

221

21581

Rolling Machine Operation and Mtn

provide training to the remain artisans 100 candidates (Boilermakers and Welders) on stationary machine (Shear machine, Press Bend Machine, Rolling Machine, Pedestal Drill Machine, Twin Column Machine, Manual Thread Machine) from the workshop as a part of the trade upskilling training programme for 2023.

 

---------------------

 

Former les artisans restants 100 candidats (chaudronniers et soudeurs) sur machine fixe (cisaille, presse plieuse, rouleuse, perceuse sur socle, machine à double colonne, machine à fileter manuelle) de l'atelier dans le cadre de la formation de perfectionnement au métier programme pour 2023.

Taining service

21-Aug

222

21582

Shear Machine Operation and Maintenance

provide training to the remain artisans 100 candidates (Boilermakers and Welders) on stationary machine (Shear machine, Press Bend Machine, Rolling Machine, Pedestal Drill Machine, Twin Column Machine, Manual Thread Machine) from the workshop as a part of the trade upskilling training programme for 2023.

 

---------------------

 

Former les artisans restants 100 candidats (chaudronniers et soudeurs) sur machine fixe (cisaille, presse plieuse, rouleuse, perceuse sur socle, machine à double colonne, machine à fileter manuelle) de l'atelier dans le cadre de la formation de perfectionnement au métier programme pour 2023.

Taining service

21-Aug

223

21583

Press Bend Machine Operation and  Maintenance

provide training to the remain artisans 100 candidates (Boilermakers and Welders) on stationary machine (Shear machine, Press Bend Machine, Rolling Machine, Pedestal Drill Machine, Twin Column Machine, Manual Thread Machine) from the workshop as a part of the trade upskilling training programme for 2023.

Taining service

21-Aug

224

21584

Pedestal Drill Operation and Maintenance

provide training to the remain artisans 100 candidates (Boilermakers and Welders) on stationary machine (Shear machine, Press Bend Machine, Rolling Machine, Pedestal Drill Machine, Twin Column Machine, Manual Thread Machine) from the workshop as a part of the trade upskilling training programme for 2023.

 

---------------------

 

Former les artisans restants 100 candidats (chaudronniers et soudeurs) sur machine fixe (cisaille, presse plieuse, rouleuse, perceuse sur socle, machine à double colonne, machine à fileter manuelle) de l'atelier dans le cadre de la formation de perfectionnement au métier programme pour 2023.

Taining service

21-Aug

225

21585

Twin Column Ben Saw

provide training to the remain artisans 100 candidates (Boilermakers and Welders) on stationary machine (Shear machine, Press Bend Machine, Rolling Machine, Pedestal Drill Machine, Twin Column Machine, Manual Thread Machine) from the workshop as a part of the trade upskilling training programme for 2023.

 

---------------------

 

Former les artisans restants 100 candidats (chaudronniers et soudeurs) sur machine fixe (cisaille, presse plieuse, rouleuse, perceuse sur socle, machine à double colonne, machine à fileter manuelle) de l'atelier dans le cadre de la formation de perfectionnement au métier programme pour 2023.

Taining service

21-Aug

226

21586

Manual Thread Cutting and Tapping

provide training to the remain artisans 100 candidates (Boilermakers and Welders) on stationary machine (Shear machine, Press Bend Machine, Rolling Machine, Pedestal Drill Machine, Twin Column Machine, Manual Thread Machine) from the workshop as a part of the trade upskilling training programme for 2023.

 

---------------------

 

Former les artisans restants 100 candidats (chaudronniers et soudeurs) sur machine fixe (cisaille, presse plieuse, rouleuse, perceuse sur socle, machine à double colonne, machine à fileter manuelle) de l'atelier dans le cadre de la formation de perfectionnement au métier programme pour 2023.

Taining service

21-Aug

227

21627

Coaching and procedure

provide training to the remain artisans 100 candidates (Boilermakers and Welders) on stationary machine (Shear machine, Press Bend Machine, Rolling Machine, Pedestal Drill Machine, Twin Column Machine, Manual Thread Machine) from the workshop as a part of the trade upskilling training programme for 2023.

 

---------------------

 

Former les artisans restants 100 candidats (chaudronniers et soudeurs) sur machine fixe (cisaille, presse plieuse, rouleuse, perceuse sur socle, machine à double colonne, machine à fileter manuelle) de l'atelier dans le cadre de la formation de perfectionnement au métier programme pour 2023.

Taining service

21-Aug

228

21633

training on SLM3 & SLM4 system

training on SLM3 & SLM4 system.

 

---------------------

 

Formation sur le système SLM3 & SLM4

Taining service

21-Aug

229

21644

Plasma Jet cutter machine installation

Plasma jet DSL 1530 installation (Check and validate the current positionings of different modules; make and/or validate the different connections between different modules; Check or install plasma jet software; do the commissioning of the Plasma jet DSL 1530 Machine).

 

---------------------

 

Installation Plasma jet DSL 1530 (Vérifier et valider les positionnements actuels des différents modules ; faire et/ou valider les différentes connexions entre différents modules ; Vérifier ou installer le logiciel plasma jet ; faire la mise en service de la Machine Plasma jet DSL 1530)

Mining service

21-Aug

230

21646

Consulting WMS Activities

KCC Workforce Management Services has installed biometric equipment that covers all KCC sites. The recommendation from the OEM and the auditors recommend that all sites be equipped with biometric equipment, that dependents be identified for management and control, that employee bus management be automatic and that contractor management be automatic.

Consultancy service

21-Aug

231

21648

Aviation refueling operators

Aviation refueling operators

Mining service

21-Aug

232

21526

KTO Ground Support Review

KTO uses ground support elements to support the development ends and the stoping areas in the room and pillar.  The current support standards were last updated in March 2019 and the mine has developed into new mining areas. The Geotechnical Review Board (GRB) in October 2022 recommended a review of the current standards and perform empirical calculations and numerical simulations on the support performance as there is a risk associated with poor performing support that could lead to fall of ground accidents which may in turn lead to equipment damage and fatalities. It has been recommend that this support design review be executed and supported by an independent and competent external review.

 

---------------------

 

KTO utilise des éléments de soutènement pour soutenir les extrémités de développement et les zones d'abattage dans la chambre et le pilier. Les normes de soutien actuelles ont été mises à jour pour la dernière fois en mars 2019 et la mine s'est développée en de nouvelles zones minières. Le Conseil d'examen géotechnique (GRB) en octobre 2022 a recommandé une révision des normes actuelles et d'effectuer des calculs empiriques et des simulations numériques sur les performances du support car il existe un risque associé à un support peu performant qui pourrait entraîner une chute d'accidents au sol qui pourraient à leur tour entraîner des dommages matériels et des décès. Il a été recommandé que cette revue de conception de support soit exécutée et appuyée par une revue externe indépendante et compétente.

Mining service

21-Aug

233

21593

KTC LP BLOWERS 3 YEAR SERVICE CONTRACT

Kamoto Copper Company (KCC) is a world class, responsible mining business in the Democratic Republic of Congo. KCC is in Kolwezi, in the province of Lualaba.
Through the scale and nature of the business, KCC makes a significant and positive contribution to our local communities, the province, country, and broader society. Positive impacts range from production of raw materials that drive social progress, to the payment of taxes and royalties to the DRC government, provision of employment and business opportunities.
KCC is an equal opportunity employer and actively promotes diversity in its workplace.
KCC’s Concentrator department (KTC) owns and operates the GM 150S Aerzener Low Pressure (LP) Blowers for floatation air application and seeks the services of the OEM to carry out maintenance services on a 3-year Service Contract.
The contractor will focus on the supply of all critical spares for the overhauls, travel to site at specified service intervals and carry out service on the blowers and commission.

 

---------------------

 

Kamoto Copper Company (KCC) est une entreprise minière responsable de classe mondiale en République démocratique du Congo. KCC est à Kolwezi, dans la province du Lualaba.
Grâce à l'échelle et à la nature de l'entreprise, KCC apporte une contribution significative et positive à nos communautés locales, à la province, au pays et à la société en général. Les impacts positifs vont de la production de matières premières qui stimulent le progrès social au paiement de taxes et de redevances au gouvernement de la RDC, en passant par la création d'emplois et d'opportunités commerciales.
KCC est un employeur garantissant l'égalité des chances et promeut activement la diversité sur son lieu de travail.
Le département concentrateur de KCC (KTC) possède et exploite les soufflantes GM 150S Aerzener basse pression (LP) pour les applications d'air de flottaison et recherche les services de l'OEM pour effectuer des services de maintenance dans le cadre d'un contrat de service de 3 ans.
L'entrepreneur se concentrera sur la fourniture de toutes les pièces de rechange critiques pour les révisions, se rendra sur le site à des intervalles d'entretien spécifiés et effectuera l'entretien des soufflantes et la commission.

Mining service

21-Aug

234

21634

Sump Cleaning SWMP2

Excavation of sumps are Priority 1 actions in the Surface Water Management Plan (SWMP) which is a critical control for the Open Pit Ground/Strata CHMP. A minimum design volume must be achieved in each of the KOV sumps for CHMP complianceSumps in KOV and Mashamba need to be excavated of accumulated mud in preparation for the 2023-24 wet season.An average haulage distance to the dumping area of 3.8 km has been calculated. In order to access the sumps to carry out the work in a safe manner it is expected that dry material will need to be hauled in by the contractor to use as ballast. Our assumption is that on average, 30% of the total excavation volume will be needed for each of the sumps. This material will be available in the waste dumping area to be hauled an equal distance.

 

---------------------

 

L'excavation des puits est une action de priorité 1 dans le plan de gestion des eaux de surface (SWMP), qui est un contrôle essentiel pour le CHMP à ciel ouvert au sol/strata. Un volume de conception minimal doit être atteint dans chacun des puisards de KOV pour la conformité au CHMP Les puisards de KOV et de Mashamba doivent être excavés de la boue accumulée en préparation de la saison des pluies 2023-24. Une distance de transport moyenne jusqu'à la zone de décharge de 3,8 km a été calculé. Afin d'accéder aux puisards pour effectuer les travaux en toute sécurité, il est prévu que des matériaux secs devront être transportés par l'entrepreneur pour être utilisés comme lest. Notre hypothèse est qu'en moyenne, 30% du volume total d'excavation sera nécessaire pour chacun des puisards. Ce matériel sera disponible dans la zone de décharge des déchets pour être transporté sur une distance égale.

Mining Services

16-Aug

235

21636

Heavy Equipment Machine Hire for KOV/ME

Provide heavy equipment supplied with appropriate manpower on a per vehicle per hour basis. There will be three separate equipment teams and each team must be supervised. Operations will be ongoing 12 hours Dayshift Only 7 days operation and supervision is required at all times to provide full coverage.

Availability of equipment must be continuous for a maximum of 1092 hours i.e., 3 months / 91 days/12hours per day.
Team 1 – 50-ton excavator and D9
Team 2 – 50-ton excavator and D9
Team 3 – 50-ton front end loader & 2 articulated dump trucks.

 

---------------------

 

Fournir de l'équipement lourd fourni avec la main-d'œuvre appropriée sur une base par véhicule et par heure. Il y aura trois équipes d'équipement distinctes et chaque équipe doit être supervisée. Les opérations se poursuivront sur 12 heures de jour. Seulement 7 jours d'exploitation et de supervision sont nécessaires en tout temps pour fournir une couverture complète.

La disponibilité de l'équipement doit être continue pendant un maximum de 1092 heures, soit 3 mois / 91 jours / 12 heures par jour.
Équipe 1 – Excavatrice de 50 tonnes et D9
Équipe 2 – pelle de 50 tonnes et D9
Équipe 3 – chargeur frontal de 50 tonnes et 2 bennes articulés.

Mining Services

16-Aug

236

21638

KTO BUILDING TOILET REFURSHIMENT

The Renovation of Kamoto Building Toilet will resolve issue of actual toilet’s conditions which are poor and unsanitary. This proposal scope will improve Plumbing installation to provide sufficient flow, will short out matters of insufficient lighting in sanitary facilities, will provide proper ventilation by new extractor fans to be installed, will Refreshment walls by paints and tilling floor and wall for a good sanitary condition.

 

---------------------

 

La rénovation des toilettes du bâtiment de Kamoto résoudra le problème des conditions réelles des toilettes qui sont médiocres et insalubres. La portée de cette proposition améliorera l'installation de plomberie pour fournir un débit suffisant, résoudra les problèmes d'éclairage insuffisant dans les installations sanitaires, fournira une ventilation adéquate par de nouveaux ventilateurs d'extraction à installer, rafraîchira les murs par des peintures et le carrelage du sol et des murs pour un bon état sanitaire .

Civil Work

16-Aug

237

21626

Thermal drone survey & RGB pictures / Video of 120kV powerlines

Thermal drone survey & RGB pictures / Video of 120kV powerlines.

 

---------------------

 

Relevé thermique par drone & images RVB / Vidéo de lignes électriques 120kV

Mining Services

16-Aug

238

21632

MID-LIFE SERVICES TO MV GENERATORS

It is intended that this scope will provide details for the mid-life services (15000 Hours) to the two Perkins generators (GE107 and GE108) at the Management Village camp substation.These two generators have exceeded their mid-life run time and are in urgent need of mid-life servicing.All personnel working on this project shall be qualified and experienced Perkins technicians with recognized qualifications.If the mid-life servicing is not performed, these generators will fail and the MV camp will be without electrical power.

 

---------------------

 

Il est prévu que cette portée fournira des détails sur les services à mi-vie (15 000 heures) des deux générateurs Perkins (GE107 et GE108) à la sous-station du camp de Management Village. Ces deux générateurs ont dépassé leur durée de fonctionnement à mi-vie et sont en besoin urgent d'un entretien à mi-vie. Tout le personnel travaillant sur ce projet doit être des techniciens Perkins qualifiés et expérimentés avec des qualifications reconnues. Si l'entretien à mi-vie n'est pas effectué, ces générateurs tomberont en panne et le camp MV sera sans alimentation électrique.

Mining Services

16-Aug

239

21637

Cobalt Testing in Urine

To provide for Watu Wetu, Occupational Health department cobalt’s urine testing for biological monitoring purpose.

 

---------------------

 

Fournir à Watu Wetu, département de santé au travail, des tests d'urine de cobalt à des fins de surveillance biologique.

Medical service

16-Aug

240

21639

Klerkscale - Renewal of Software support

Klerkscale - Renewal of Software support

IT Software

16-Aug

241

21642

T17 Pre Feasibility Study: Dewatering We

The Mine Technical Services Department at Kamoto Copper Company SA (KCC) is currently studying the path forward to resume mining at T17 open pit. The study is currently at Pre-Feasibility Level and this scope of work specifically focusses on gaining a better understanding of the groundwater conditions in the region to determine the best methodology to dewater the open pit.
As part of this programme, three large diameter deep dewatering wells in the different permeable fragments that the constrained case pit shells will intersect. These are the T17, Musonoi and FSSR fragments.
The outcomes of this investigation will provide a high level of confidence to the study program suitable to progress it to Feasibility Level, as well as provide information to complimentary studies such as numerical modelling.

 

---------------------

 

Le département des services techniques de la mine de Kamoto Copper Company SA (KCC) étudie actuellement la voie à suivre pour reprendre l'exploitation minière à ciel ouvert T17. L'étude est actuellement au niveau de préfaisabilité et cette portée des travaux se concentre spécifiquement sur l'obtention d'une meilleure compréhension des conditions des eaux souterraines dans la région afin de déterminer la meilleure méthodologie pour assécher la mine à ciel ouvert.Dans le cadre de ce programme, trois puits d'assèchement profonds de grand diamètre dans les différents fragments perméables que les enveloppes de fosse à cas contraints croiseront. Il s'agit des fragments T17, Musonoi et FSSR.Les résultats de cette enquête fourniront un haut niveau de confiance au programme d'étude approprié pour le faire progresser jusqu'au niveau de faisabilité, ainsi que des informations pour des études complémentaires telles que la modélisation numérique.

Mining Services

16-Aug

242

21644

Plasma Jet cutter machine installation

Plasma jet DSL 1530 installation (Check and validate the current positionings of different modules; make and/or validate the different connections between different modules; Check or install plasma jet software; do the commissioning of the Plasma jet DSL 1530 Machine).

 

---------------------

 

Installation Plasma jet DSL 1530 (Vérifier et valider les positionnements actuels des différents modules ; faire et/ou valider les différentes connexions entre différents modules ; Vérifier ou installer le logiciel plasma jet ; faire la mise en service de la Machine Plasma jet DSL 1530)

Mining Services

16-Aug

243

21539

KCC Employee Assistance Program (EAP)

Provide an Employee Assistance Program (“EAP”) locally available in place to support employees’ emotional and psychological wellbeing with expert counselling by professionals trained in violence and harassment counselling.

 

---------------------

 

Fournir un programme d'aide aux employés («PAE») disponible localement pour soutenir le bien-être émotionnel et psychologique des employés avec des conseils d'experts par des professionnels formés au conseil en matière de violence et de harcèlement.

Consultancy Service

11-Aug

244

21614

Vodacom - DGDA Link - Sydonia

Vodacom - DGDA Link - Sydonia

Internet Services

11-Aug

245

21615

Vodacom - dedicated Internet access

Vodacom - dedicated Internet access.

Internet Services

11-Aug

246

21630

Drilling supervision for environmental monitoring wells

The scope is outlined as follows:
· Provide review of selected drilling sites for the environmental monitoring boreholes.
· Supervise the drilling and construction of environmental monitoring boreholes with the
Kamoto Copper Company area.
· Supervise hydraulic testing and water quality testing of dewatering boreholes provide
regular reports to the mine technical team.
· Compile a comprehensive report of all activities undertaken as part of the drilling.

· Construction and testing of the environmental drilling boreholes.

 

---------------------

 

Fournir un examen des sites de forage sélectionnés pour les forages de surveillance environnementale.
· Superviser le forage et la construction de forages de surveillance environnementale avec le
Zone Kamoto Copper Company.
· Superviser les tests hydrauliques et les tests de qualité de l'eau des forages d'assèchement
rapports réguliers à l'équipe technique de la mine.
· Compiler un rapport complet de toutes les activités entreprises dans le cadre du forage.

· Construction et test des forages environnementaux.

Drilling Service

11-Aug

247

21631

Quarterly stocktake of Cu and CoH stock

KCC is storing a significant quantity of copper and cobalt on site which need to be included under the Group’s cargo insurance policy (Mastery in stock take)
Compliance with the business requirement to perform a full cycle count and a full inventory at least four times a year by a third party.
This operation is necessary to meet the requirements of financial management and audits (internal audit, external audit, OHADA, Glencore).

This service is performed quarterly to cross check our internal data.

 

---------------------

 

KCC stocke sur site une quantité importante de cuivre et de cobalt qui doit être incluse dans la police d'assurance cargo du Groupe (Maîtrise en inventaire)
Conformité avec l'exigence commerciale d'effectuer un cycle de comptage complet et un inventaire complet au moins quatre fois par an par un tiers.
Cette opération est nécessaire pour répondre aux exigences de la gestion financière et des audits (audit interne, audit externe, OHADA, Glencore).


Ce service est effectué trimestriellement pour recouper nos données internes.

Mining Activity

11-Aug

248

21567

FOA Certified Fiber Optic Training

FOA Certified Fiber Optic Training. FOA Certified Fiber Optic Specialist/Design Course (CFOS/D).

 

---------------------

 

Cours de spécialiste/conception de fibre optique certifié FOA (CFOS/D)
Onsite INSTRUMENTATION

Training

4-Aug

249

21268

FOA Certified Fiber Optic Training

FOA Certified Fiber Optic Technician Course (CFOT) Onsite INSTRUMENTATION.

 

---------------------

 

Cours de technicien certifié en fibre optique FOA (CFOT) sur site

Training

4-Aug

250

21587

Coaching and procedure

The training must include:

• Machine installation and assembly
• Start-up and change-over
• Various modes of operation
• Maintenance, cleaning, and repairs
• Shutdown
• Troubleshooting, clearing jams, etc.
• Hazards to be considered may include:
o Mechanical
o Energy sources (e.g., electrical, pneumatic, hydraulic, etc.)
o Unexpected start-up or shut-down, or automatic repeat cycles
o Exposures to harmful substances or environments (e.g., chemical exposures, hot/cold surfaces, sharp edges, vibration, noise, dusts and fumes, etc.)
o Unstable loads, stocks, finished products, etc.
o Other

 

---------------------

 

« La formation doit comprendre :
• Installation et montage de machines
• Démarrage et changement
• Divers modes de fonctionnement
• Entretien, nettoyage et réparations
• Fermer
• Dépannage, suppression des bourrages, etc.
• Les dangers à prendre en compte peuvent inclure :
Mécanique
o Sources d'énergie (par exemple, électrique, pneumatique, hydraulique, etc.)
o Démarrage ou arrêt inattendu, ou cycles de répétition automatiques
o Expositions à des substances ou à des environnements nocifs (par exemple, expositions chimiques, surfaces chaudes/froides, arêtes vives, vibrations, bruit, poussières et fumées, etc.)
o Charges instables, stocks, produits finis, etc.
o Autre"

Training

4-Aug

251

21603

PRINCE2 Agile Foundation

The PRINCE2 Agile® Foundation certificate is designed to help professionals deliver agile projects by tailoring PRINCE2
management controls with a broad toolset of agile delivery techniques and frameworks. The PRINCE2 Agile® Foundation
qualification is a prerequisite for the PRINCE2 Agile Practitioner Examination.

 

---------------------

 

Le certificat PRINCE2 Agile® Foundation est conçu pour aider les professionnels à réaliser des projets agiles en adaptant PRINCE2
contrôles de gestion avec un large ensemble d'outils de techniques et de cadres de livraison agiles. La Fondation PRINCE2 Agile®
La qualification est une condition préalable à l'examen PRINCE2 Agile Practitioner.

 

4-Aug

252

21604

Querying Data with Microsoft TransactSQL

This course will teach the basics of Microsoft’s dialect of the standard SQL language: Transact-SQL. Topics include both
querying and modifying data in relational databases that are hosted in Microsoft SQL Server-based database systems,
including: Microsoft SQL Server, Azure SQL Database and, Azure Synapse Analytics.

 

---------------------

 

Ce cours enseignera les bases du dialecte Microsoft du langage SQL standard : Transact-SQL. Les sujets incluent à la fois
interroger et modifier des données dans des bases de données relationnelles hébergées dans des systèmes de base de données basés sur Microsoft SQL Server,
y compris : Microsoft SQL Server, Azure SQL Database et Azure Synapse Analytics.

 

4-Aug

253

21577

Provide Qualified Personnel & Expertise

The Sulphuric Acid Plant at Kamoto Copper Company is integral into the operations of the
KCC’s Copper and Cobalt production, hence the need to ensure that the Acid Plant which
includes the Liquid SO2 Plant and a Power generating Plant have a reliable source of Plant
Process Air Blower that allows the Plant to run at Maximum capacity .This calls for the
need of a OEM backed Maintenance Service Contract for the Howden Blower SF140
Machine Serial 1052183.

 

---------------------

 

L'usine d'acide sulfurique de Kamoto Copper Company fait partie intégrante des opérations de la
production de cuivre et de cobalt de KCC, d'où la nécessité de s'assurer que l'usine d'acide qui
comprend l'usine de SO2 liquide et une centrale électrique ont une source fiable d'usine
Process Air Blower qui permet à l'usine de fonctionner à sa capacité maximale. Cela nécessite le
besoin d'un contrat de service de maintenance garanti par un OEM pour le Howden Blower SF140
Machine série 1052183

 

4-Aug

254

21600

Loading of IX Column Materials

To provide the Load out / transport crews with a full time 100 tonne crane as well as a 50 tonne support
crane, multiple forklift trucks completed with the rigging crew, the labour and all the rigging gear for the
loading of the resin column sections onto the designated transporters abnormal load road transport trailers.

 

---------------------

 

Fournir aux équipes de chargement / transport une grue de 100 tonnes à temps plein ainsi qu'un support de 50 tonnes
grue, plusieurs chariots élévateurs complétés avec l'équipe de gréage, la main-d'œuvre et tout le matériel de gréement pour le
chargement des sections de colonne de résine sur les remorques de transport routier pour charges exceptionnelles des transporteurs désignés.

Mining Services

4-Aug

255

21610

Tender for WW Staff training

To Provide training to WW Staff as per they annually and casual plans approved and budgetized.

 

---------------------

 

Fournir une formation au personnel WW conformément aux plans annuels et occasionnels approuvés et budgétisés

 

4-Aug

256

21611

Employee assistance program  EAP see SOW

Provide an Employee Assistance Program (“EAP”) locally available in place to support employees’ emotional and psychological wellbeing with expert counselling by professionals trained in violence and harassment counselling.

 

---------------------

 

Fournir un programme d'aide aux employés («PAE») disponible localement pour soutenir le bien-être émotionnel et psychologique des employés avec des conseils d'experts par des professionnels formés au conseil en matière de violence et de harcèlement.

Training

4-Aug

257

21612

KOV P2A DEWATERING EROSION REPAIRS

This Scope of Services under this Contract include, but not limited to the following:
• Construction of Gabion wall
• Backfilling and compaction of compromised section of the Dewatering Station P2A for stability and soil treatment.
• Rock filling of compromised section corroded away due to erosion after soil treatment.
• Pouring of mass concrete 30MPa as filler of rocky materials as part of erosion repair solution.
• Excavation of stormwater drainage.
• Supply and place gabion mattress on drainage excavation as subbase.

 

---------------------

 

Construction d'un mur en gabions
• Remblayage et compactage de la section compromise de la station d'assèchement P2A pour la stabilité et le traitement des sols.
• Le remblai rocheux de la section compromise s'est corrodé en raison de l'érosion après le traitement du sol.
• Coulée de béton de masse 30MPa comme remplissage de matériaux rocheux dans le cadre d'une solution de réparation de l'érosion.
• Excavation du drainage des eaux pluviales.
• Fournir et placer le matelas de gabion sur l'excavation de drainage comme sous-base.

Contruction services

4-Aug

258

21613

Service Calls on the X-Ray Units

Service Calls on the X-Ray Units

Medical service

4-Aug

259

21475

Geologists for Core Logging

Provide 4 geologists for:
• Core logging of approximately 59000 meters of KCC Surface Resource and geotechnical drilling
• Following up the drilling quality (recovery, dh-survey, orientation, markup) and safety aspects on the rigs daily in both Underground and Open Pit programmes
• Capturing and validating the data in KCC system
   
Provide a suitable LV 4x4 for Monitoring drilling on the site.

 

---------------------

 

Fournir 4 geologues  et un vehicul adapte pour ce genre de services.

Labor Hiring

25-Jul

260

21560

SUBSTATION RESCUE DOORS INSTALLATION

The Replacement of existing doors by rescue doors to all KCC substations, will resolve issue in emergency case to secure employees who are working permanently, or temporary in substations to evacuate safely, and to be also confirm with standards safety recommendations doors for substation. The Scope of works covers the removing existing doors, installation of new doors including all finishing works on 26 Main Doors and 22 Single Doors spread over 22 Substations.

 

---------------------

 

Le remplacement des portes existantes par des portes de secours à toutes les sous-stations KCC, résoudra le problème en cas d'urgence pour sécuriser les employés qui travaillent en permanence, ou temporairement dans les sous-stations pour évacuer en toute sécurité, et pour être également confirmé avec les normes de sécurité des portes des sous-stations. L'étendue des travaux couvre la suppression des portes existantes, l'installation de nouvelles portes, y compris tous les travaux de finition sur 26 portes principales et 22 portes simples réparties sur 22 sous-stations.

Mining Maintenance

25-Jul

261

21416

DISMANTLE – TRANSPORTING - STACKING

KCC mine has a lot of historical scaffolds scattered standing around its sites that need to be dismantled and removed from sites for safety and housekeeping reasons.
Elements removed from site will be segregated between the ones that are still in good conditions to be reused and the ones that are to be scrapped. All elements will be properly stacked in the dedicated laydown areas for further process.

 

---------------------

 

La mine KCC possède de nombreux échafaudages historiques dispersés autour de ses sites qui doivent être démantelés et retirés des sites pour des raisons de sécurité et d'entretien.
Les éléments retirés du site seront séparés entre ceux qui sont encore en bon état pour être réutilisés et ceux qui doivent être mis au rebut. Tous les éléments seront correctement empilés dans les zones de dépôt dédiées pour un traitement ultérieur.

Mining Service

7-Jul

262

21547

Reagents Warehousing

KCC requires the services of a third party provider to provide warehousing facilities to handle and store reagents (such as Quick Lime, Hydrated Lime, Sulphur, Ferrous Sulphate Monohydrate, SMBS, MgO, Coal, Coagulant,  and Soda Ash) in a safe and efficient manner. Refer to the MSDS as attached for detail on handling each of the reagents.

 

---------------------

 

KCC a besoin des services d'un fournisseur tiers pour fournir des installations d'entreposage pour manipuler et stocker les réactifs (tels que la chaux vive, la chaux hydratée, le soufre, le sulfate ferreux monohydraté, le SMBS, le MgO, le charbon, le coagulant et le carbonate de soude) dans un environnement sûr et efficace. manière. Reportez-vous à la fiche signalétique jointe pour plus de détails sur la manipulation de chacun des réactifs.

Mining Service

7-Jul

263

21413

Cherry Picker rental

Rental Cherry Picker 6 Months
• Rental Cherry Picker 6 months with a regular maintenance in charge of the contractor.

 

---------------------

 

Location du camion elevateur pour 6 . Maintenance a la charge de l'entrepreneur.

Equipment hiring

20-Jun

264

21382

STRUCTURAL REPAIR OF KADI SUBSTATION

The KADI Substation bearing masonry at the north of the building has sustained severe cracks that appear to be detrimental to the overall of stability of the structure. From the structural assessment conducted by the KCC team of engineers on site, they reported that structural integrity of the building has been compromised. KCC then engaged a further investigation with Investmech as an external specialist consultant. Investmech conducted another investigated and submitted their findings and recommendations.

 

---------------------

 

La maçonnerie portante de la sous-station KADI au nord du bâtiment a subi de graves fissures qui semblent nuire à la stabilité globale de la structure. D'après l'évaluation structurelle menée par l'équipe d'ingénieurs de KCC sur place, ils ont signalé que l'intégrité structurelle du bâtiment avait été compromise. KCC a ensuite engagé une enquête plus approfondie auprès d'Investmech en tant que consultant spécialisé externe. Investmech a mené une autre enquête et a soumis ses conclusions et ses recommandations.

Civil work

20-Jun

265

21510

REPLACE SULPHURICACID INLET LINE TO ATF2

Due to the criticality of the situation, KCC appointed Investmech to provide a repair solution for the building. In this Scope of services, we describe the required works that must be conducted in order to safely repair the building and prolong its service life.

 

---------------------

 

En raison de la criticité de la situation, KCC a nommé Investmech pour fournir une solution de réparation pour le bâtiment. Dans cette portée des services, nous décrivons les travaux requis qui doivent être effectués afin de réparer le bâtiment en toute sécurité et de prolonger sa durée de vie.

Mining Service

20-Jun

266

21432

Engineering Work required at SKM Environ

The construction of Floor Slab Storage area and Separator used oil at Engineering SKM Environmental   will resolve issue with contaminated soil on the storage area, will also prevent rainwater and used water to be evacuate separately.

 

---------------------

 

La construction d'une zone de stockage de dalles de sol et d'un séparateur d'huile usée à Engineering SKM Environmental résoudra le problème de sol contaminé sur la zone de stockage, empêchera également l'eau de pluie et l'eau usée d'être évacuées séparément.

Civil work

20-Jun

267

21473

KCC – Geotech Drilling KOV & ME

Due to the gap of data observed in the existing geotechnical dataset, the Mine Technical Service at KCC has decided to initiate a diamond drilling campaign. These holes are designed to cross next cuts push back KOV Cut5A2, KOV Cut6, ME Cut6,7 in order to collect geotechnical data useful for pit geotechnical hazards management.

 

---------------------

 

En raison du manque de données observé dans l'ensemble de données géotechniques existant, le service technique de la mine de KCC a décidé de lancer une campagne de forage au diamant. Ces sondages sont conçus pour traverser les prochaines coupes repoussées KOV Cut5A2, KOV Cut6, ME Cut6,7 afin de collecter des données géotechniques utiles à la gestion des aléas géotechniques de la fosse.

Drilling service

20-Jun

268

21498

TAILINGS LINES UPGRADE TO PN20

Currently, we have the tailings lines of PN 12,5 with a single point discharge per pipeline with the pipeline crossing the TSF wall down to the dedicated discharge point.

We are experiencing frequent cracking of the PN 12,5 pipes resulting in production losses.

We provide to replace each of the existing PN 12,5 Tailings lines with PN20 on first portion to prevent pipes breakdowns and production losses.

Upgrading the first portion 1200 m pipeline to PN20 results in an increase in friction losses which consequently result in a reduced flow rate.
Higher flow rates are possible at low densities, however operating the system at low density to achieve higher flow rates will result in a reduced tonnage throughput.

 

---------------------

 

Actuellement, nous avons les lignes de résidus de PN 12,5 avec un seul point de décharge par pipeline, le pipeline traversant le mur de l'ISR jusqu'au point de décharge dédié.

Nous constatons des fissures fréquentes des canalisations PN 12,5 entraînant des pertes de production.

Nous prévoyons de remplacer chacune des lignes de résidus PN 12,5 existantes par PN20 sur la première portion pour éviter les pannes de tuyaux et les pertes de production.

La mise à niveau de la première portion de canalisation de 1 200 m au PN20 entraîne une augmentation des pertes par frottement qui se traduit par conséquent par une réduction du débit.
Des débits plus élevés sont possibles à de faibles densités, mais le fonctionnement du système à faible densité pour obtenir des débits plus élevés entraînera un débit de tonnage réduit.

Mining Service

20-Jun

269

21316

INSTALLATION OF DIRTH WHACKER SCRAPERS

INSTALLATION DE GRATTOIRS POUR LE NETTOYAGE DES FOSSES SEPTIQUES

The work is supplying of the required skilled labour and equipment to commence work on installation of scrapers on the LUILU Dryer section and acid plant full conveyor belt structure area of the belt as follows.
Contractor should include time for completion and rates shall include supply and installation of all activities related to this work.

The description of the work shall be as follows:

• Installation of dirt whacker scrapers
• Service supply

 

---------------------

Le travail consiste à fournir la main-d'œuvre qualifiée et l'équipement nécessaires pour commencer les travaux d'installation de racleurs sur la section du séchoir LUILU et sur la structure de la bande transporteuse complète de l'usine d'acide, comme suit.
L'entrepreneur doit indiquer le délai d'exécution et les tarifs doivent inclure la fourniture et l'installation de toutes les activités liées à ce travail.

La description des travaux est la suivante :

- Installation de racleurs de saleté
- Fourniture de services

Labor

10-May

270

21363

Rental of 9 forklifts for Exports OPS.

Location de 9 chariots élévateurs pour Exports OPS.

Move copper cathodes at the cobalt plant
- Constitute lots of Cu and CoH on ground
- Load and offload trucks with Cu bundles and CoH bags for exportation purposes
- Working time : 16200 hours (90 days or 3 months), from Monday to Sunday, 24h everyday.

Contractor to provide PPE:
•         Hard hat
•         Safety glasses
•         Safety shoes
•         Reflector jackets / reflector overa
•         Food
•         Water
•         Transportation

 

---------------------

 Déplacer les cathodes de cuivre dans l'usine de cobalt
- Constituer des lots de Cu et de CoH au sol
- Charger et décharger les camions de fardeaux de Cu et de sacs de CoH à des fins d'exportation.
- Temps de travail : 16200 heures (90 jours ou 3 mois), du lundi au dimanche, 24 heures par jour.

L'entrepreneur doit fournir les EPI :
- Casque de sécurité
- Lunettes de sécurité
- Chaussures de sécurité
- Vestes réfléchissantes / couvertures réfléchissantes
- Nourriture
- Eau
- Transport

Transport & Labor hire

10-May

271

21381

WATER TREATMENT


• Provide 12 engineers in charge to perform the work according to the scope.

• Provide sampling, analytical instrument and reagents to perform the sampling and the water analysis.
• Run water analysis for physical and chemical control.
• Report on daily basis to KCC, results of analysis with recommendations.
• Implement the recommendations to ensure good performance of the plant.
• Optimize treatment programs for the best economical use of the water treatment Chemicals.
• Communicate problems and areas of concern to appropriate plant personnel in a timely manner.
• Maintaining chemical dosing and monitoring equipment to ensure an effective treatment regime.
• Performing chemical Inventories on behalf of KCC and advising when the KCC needs to order new stocks taking into account plant product availability and supply chain factors.
• Transfer skills to KCC plant operators in water treatment fundamentals.
• Safety surveys to ensure compliance of the site engineers to safety standards of KCC safety, health and environment policies.
• Hold regular meetings both formal and informal with the KCC Process management and site team to discuss any technical issues.
• Plant surveys for identifying any field of improvement on the process or water treatment side.

 

---------------------

- Fournir 12 ingénieurs chargés d'effectuer les travaux conformément au cahier des charges.
- Fournir l'échantillonnage, l'instrument analytique et les réactifs pour effectuer l'échantillonnage et l'analyse de l'eau.
- Procéder à l'analyse de l'eau pour le contrôle physique et chimique.
- Rendre compte quotidiennement au CCK des résultats de l'analyse avec des recommandations.
- Mettre en œuvre les recommandations afin d'assurer une bonne performance de l'usine.
- Optimiser les programmes de traitement pour une utilisation économique optimale des produits chimiques de traitement de l'eau.
- Communiquer les problèmes et les sujets de préoccupation au personnel approprié de l'usine en temps opportun.
- Entretenir les équipements de dosage et de surveillance des produits chimiques afin de garantir un régime de traitement efficace.
- Réaliser des inventaires de produits chimiques pour le compte du KCC et conseiller le KCC lorsqu'il doit commander de nouveaux stocks en tenant compte de la disponibilité des produits de l'usine et des facteurs de la chaîne d'approvisionnement.
- Transférer les compétences aux opérateurs de l'usine du KCC en ce qui concerne les principes fondamentaux du traitement de l'eau.
- Effectuer des enquêtes de sécurité pour s'assurer que les ingénieurs du site respectent les normes de sécurité des politiques du KCC en matière de sécurité, de santé et d'environnement.
- Organiser des réunions régulières, formelles et informelles, avec la direction du processus de KCC et l'équipe du site pour discuter de toutes les questions techniques.
- Effectuer des enquêtes sur les installations afin d'identifier tout domaine susceptible d'être amélioré du point de vue du processus ou du traitement de l'eau.
.

Labor

10-May

272

20953

Provision of qualified electricians

 

---------------------

Location de 9 chariots élévateurs pour Exports OPS

The forklifts currently used in the export department for loading cobalt are all old and we need additional forklifts and operators to strengthen the team in order to speed up the loading operations of copper and cobalt.

 

---------------------

Les chariots élévateurs actuellement utilisés au département export pour le chargement du cobalt sont tous anciens et nous avons besoin de chariots élévateurs et d'opérateurs supplémentaires pour renforcer l'équipe afin d'accélérer les opérations de chargement du cuivre et du cobalt.

Transport & Labor hire

 

---------------------

Location de transport et de main-d'œuvre

4-May

273

21318

Labour for Hydraulic Back Fill Walls con

 

---------------------


Main d'œuvre pour les parois hydrauliques de remblayage con

Preparation  :   -   Provide labour for the HBF walls pre-construction :
a) Reinforcing preparation, rebars cutting and steel wire and bending if necessary  ( free issue )
b) Load and transport from surface to the Underground sites  ( KCC provide transport supports )
c) Prepare, load and transport the drainage pipes and flow pipes from surface to the Underground sites  (KCC provide transport supports )
d) Prepare, Cut and load the geofabric for wall covering ( free issue )
e) House keeping
• Construction  :     -     Provide labour for HBF reinforced walls construction:                          
a) Anchoring of rebars in the pre-drilled holes according to the standards and recommandations ( KCC drilling)
b) Reinforcing ( meshing ) according to the layouts and standards ( KCC supervision )
c) Covering the back of the walls with UG meshes and geofabrics ( KCC supervision )
d) Intall drainage and flow pipes according to the standards          ( KCC supervision )   
e) House keeping

 

---------------------


Préparation : - Prévoir la main d'oeuvre pour la pré-construction des murs HBF :
                 
a) Préparation de l'armature, coupe des barres d'armature et fil d'acier et pliage si nécessaire (émission gratuite)
b) Chargement et transport de la surface vers les sites souterrains (KCC fournit des supports de transport)
c) Préparer, charger et transporter les tuyaux de drainage et les tuyaux d'écoulement de la surface vers les sites souterrains (KCC fournit des supports de transport)
d) Préparer, couper et charger le géotissu pour le revêtement mural (émission gratuite)
e) Entretien ménager
• Construction : - Fournir la main-d'œuvre pour la construction des murs armés HBF :
                                 
a) Ancrage des barres d'armature dans les trous pré-percés selon les normes et recommandations (forage KCC)
b) Renforcement (maillage) selon les schémas et normes (supervision KCC)
c) Couvrir l'arrière des murs avec des mailles UG et des géotissus (supervision KCC)
d) Intall des tuyaux de drainage et d'écoulement selon les normes (supervision KCC)
e) Entretien ménager

Labor

27-Apr

274

21359

Dewatering Well Drilling

 

---------------------


Assèchement Forage de puits

Mobilization of drilling rig and experienced operators and assistants.
-Completion of safety audits, risk assessments and inductions.
-Specification of all well construction materials for KCC procurement.
-Drilling of four (4) large diameter dewatering wells up to 350m deep in KOV Open Pit for a 16” diameter completion.
-Full drilling support, including specification of all drilling muds, fuel, provision for water supply etc.
-Installation and completion of well screen, casing and gravel pack of a high specification and quality.
-Good record keeping during drilling and well construction (penetration rate, mud loss, weight-on-bit etc).
-Well surface completion and well airlift development.
-Drill platform clean-up and demobilization.

 

---------------------

Mobilisation d'appareils de forage et d'opérateurs et d'assistants expérimentés.
-Réalisation d'audits de sécurité, d'évaluations des risques et d'inductions.
-Spécification de tous les matériaux de construction de puits pour l'approvisionnement de KCC.
-Forage de quatre (4) puits d'assèchement de grand diamètre jusqu'à 350 m de profondeur dans la fosse à ciel ouvert KOV pour une complétion de 16" de diamètre.
- Assistance complète au forage, y compris la spécification de toutes les boues de forage, du carburant, de l'approvisionnement en eau, etc.
-Installation et achèvement d'un écran de puits, d'un tubage et d'un pack de gravier d'une spécification et d'une qualité élevées.
-Bonne tenue de registres pendant le forage et la construction du puits (taux de pénétration, perte de boue, poids sur le trépan, etc.).
- Complétion de la surface du puits et développement du pont aérien du puits.
-Nettoyage et démobilisation de la plate-forme de forage.

Drilling

27-Apr

275

20877

CCRM-Certified Customer Relationship Man

The agent must become a supervisor and therefore needs this training because this will lead him to be more in contact with suppliers as well as other entities

 

---------------------


L'agent doit devenir superviseur et a donc besoin de cette formation car cela l'amènera à être plus en contact avec les fournisseurs ainsi que d'autres entités

Training

20-Apr

276

21320

T17 Concept - Hydro Drilling - River Sta

This scope of work is to drill 7 standpipes on a strip of land between T17 open pit and Musonoi River. It comprises of 5 shallow vertical standpipes up to 50m deep, and 2 deep inclined standpipes up to 100m deep.
The Scope of Services under this contract include, but not limited to the following:
Mobilization of 1 drill rig (diamond core or RC), experienced operators and assistants.
Completion of safety audits, risk assessments and inductions.
Specification of all piezometer construction materials for KCC procurement.
Drilling up to 7 open standpipes (5 to 50m and 2 to 100m) at an inclination of up to 60 degrees between T17 open pit and Musonoi River.
Full drilling support, including specification of all drilling muds, fuel, provision for water supply etc.
Supply and installation of 2” uPVC casing of a high specification and quality.
Good record keeping during drilling and well construction (penetration rate, mud loss, weight-on-bit etc).

 

---------------------


Cette portée des travaux consiste à forer 7 bornes-fontaines sur une bande de terrain entre la fosse à ciel ouvert T17 et la rivière Musonoi. Il comprend 5 bornes-fontaines verticales peu profondes jusqu'à 50 m de profondeur et 2 bornes-fontaines inclinées profondes jusqu'à 100 m de profondeur.
L'étendue des services dans le cadre de ce contrat comprend, mais sans s'y limiter, les éléments suivants :
Mobilisation d'1 foreuse (carotte diamant ou RC), d'opérateurs et d'assistants expérimentés.
Réalisation d'audits de sécurité, d'évaluations des risques et d'inductions.
Spécification de tous les matériaux de construction de piézomètres pour l'approvisionnement de KCC.
Forage jusqu'à 7 bornes-fontaines à ciel ouvert (5 à 50 m et 2 à 100 m) à une inclinaison allant jusqu'à 60 degrés entre la fosse à ciel ouvert T17 et la rivière Musonoi.
Assistance complète au forage, y compris la spécification de toutes les boues de forage, du carburant, de l'approvisionnement en eau, etc.
Fourniture et installation d'un boîtier en uPVC de 2" de haute spécification et qualité.
Bonne tenue des registres pendant le forage et la construction du puits (taux de pénétration, perte de boue, poids sur le trépan, etc.).

Drilling

20-Apr

277

21321

2023 Dewatering Drilling Project - Rehab

The Scope of Services under this contract include, but not limited to the following:
- Mobilization of drilling rig and experienced operators and assistants.
- Completion of safety audits, risk assessments and inductions.
- Specification of all well construction materials for KCC procurement.
- Airlift development using a compressor to lift mud and water from the bottom of the well to the crest and reinstate surface block. Water level is between 50-150m and hole up to 250m deep. In one hole, an application of tetrasodium-pyrophosphate should be applied to break down historical drilling mud additives that are currently smearing the screened area of the dewatering well (16” final casing – 150m slotted casing).
- Installation and operation of 3 pump sizes (150kw, 220kw and 300kw) running each pump for 24-hour period.
- Drilling 22-inch hole to install 16” casing up to 200m deep in the KOV area.
- Full drilling support, including specification of all drilling muds, fuel, provision for water supply etc.
- Installation and completion of well screen, casing and gravel pack of a high specification and quality.
- Good record keeping during drilling and well construction (penetration rate, mud loss, weight-on-bit, water strikes, airlift yields etc).
- Well surface completion and well airlift development.
- Drill platform clean-up and demobilization

 

---------------------


L'étendue des services dans le cadre de ce contrat comprend, mais sans s'y limiter, les éléments suivants :
- Mobilisation d'appareils de forage et d'opérateurs et d'assistants expérimentés.
- Réalisation d'audits de sécurité, d'évaluations des risques et d'inductions.
- Spécification de tous les matériaux de construction de puits pour l'approvisionnement de KCC.
- Développement du pont aérien à l'aide d'un compresseur pour soulever la boue et l'eau du fond du puits jusqu'à la crête et rétablir le bloc de surface. Le niveau d'eau est compris entre 50 et 150 m et le trou jusqu'à 250 m de profondeur. Dans un trou, une application de tétrasodium-pyrophosphate doit être appliquée pour décomposer les additifs de boue de forage historiques qui souillent actuellement la zone grillagée du puits d'assèchement (caisson final de 16 po - caisson fendu de 150 m).
- Installation et fonctionnement de 3 tailles de pompe (150kw, 220kw et 300kw) faisant fonctionner chaque pompe pendant une période de 24 heures.
- Forage d'un trou de 22 pouces pour installer un tubage de 16 pouces jusqu'à 200 m de profondeur dans la zone KOV.
- Assistance complète au forage, y compris la spécification de toutes les boues de forage, du carburant, de l'approvisionnement en eau, etc.
- Installation et achèvement d'un écran de puits, d'un tubage et d'un pack de gravier d'une spécification et d'une qualité élevées.
- Bonne tenue des registres pendant le forage et la construction du puits (taux de pénétration, perte de boue, poids sur le trépan, coups d'eau, rendements du pont aérien, etc.).
- Complétion de la surface du puits et développement du pont aérien du puits.
- Nettoyage et démobilisation de la plateforme de forage

Drilling

20-Apr

278

21323

UG 2023 Shaft 6 capping

This scope of work is to demolish and remove the existing concrete cap at the shaft and install a new cap to make a tight seal, preventing surface water access.
The Scope of Services under this contract include, but not limited to the following:
- Mobilization of suitable construction equipment, skilled technical personnel and assistants.
- Completion of safety audits, risk assessments and inductions.
- Specification of all concrete cap construction materials for KCC procurement.
- Demolishing and removal of the existing concrete cap at Shaft 6
- Clearing and setting out in preparation for the installation of a new cap
- Full construction support, including specification of all concrete mixes, reinforced steel, fuel, provision for water supply etc.
- Construction and completion of concrete cap which is capable of withstanding high bending and tensile forces, and adequate dimensions to prevent leakage of surface water into the shaft below
- Good record keeping during cap demolition and construction (material quantities used, formwork inspection, concrete grade etc).
- Surface clean-up and demobilization.

 

---------------------


Cette portée des travaux consiste à démolir et à enlever le capuchon en béton existant au niveau du puits et à installer un nouveau capuchon pour créer un joint étanche, empêchant l'accès à l'eau de surface.
L'étendue des services dans le cadre de ce contrat comprend, mais sans s'y limiter, les éléments suivants :
- Mobilisation d'équipements de construction appropriés, de personnel technique qualifié et d'assistants.
- Réalisation d'audits de sécurité, d'évaluations des risques et d'inductions.
- Spécification de tous les matériaux de construction de capuchons en béton pour l'approvisionnement de KCC.
- Démolition et enlèvement du chapeau de béton existant au puits 6
- Déblaiement et mise en place en vue de l'installation d'un nouveau bouchon
- Assistance complète à la construction, y compris la spécification de tous les mélanges de béton, de l'acier renforcé, du carburant, de l'approvisionnement en eau, etc.
- Construction et achèvement d'un chapeau en béton capable de résister à des forces de flexion et de traction élevées, et de dimensions adéquates pour empêcher les fuites d'eau de surface dans le puits en dessous
- Bonne tenue des registres lors de la démolition et de la construction du chapeau (quantités de matériaux utilisées, inspection des coffrages, qualité du béton, etc.).
- Nettoyage de surface et démobilisation.

Construction

20-Apr

279

21326

6 Shallow Dewatering Wells

The Mine Technical Services Department at Kamoto Copper Company SA (KCC) is looking at alternative dewatering strategies for the area between the Mupine TSF embankment and the KOV Pit crest. This scope forms part of the investigation to characterize the hydraulic properties of the saturated RGS lithological unit within the KOV Cut 5A1.

 

---------------------


Le département des services techniques de la mine de Kamoto Copper Company SA (KCC) étudie des stratégies alternatives d'assèchement pour la zone située entre le remblai de l'ISR de Mupine et la crête de la fosse KOV. Cette portée fait partie de l'investigation visant à caractériser les propriétés hydrauliques de l'unité lithologique RGS saturée au sein de la coupe KOV 5A1.

Drilling

20-Apr

280

21329

T-WALL SECURITY TOWERS ERECTION X 17

 

---------------------


MONTAGE DES TOURS DE SÉCURITÉ T-WALL X 17

To secure KCC people, equipment and operations aigainst illegal miners intrusion

 

---------------------


Sécuriser le personnel, l'équipement et les opérations de KCC contre l'intrusion de mineurs illégaux

Construction

20-Apr

281

21341

9 MOBILE EQUIPMENT OPERATORS

To ensure the success of the Scats transfer project from KTC to IPC to supplement ore requirement for 2023 a per business plan.
Hauling ores to strategic points to ensure operational efficiency and a steady ore supplies to the mills

 

---------------------


Assurer le succès du projet de transfert de Scats de KTC à IPC pour compléter les besoins en minerai pour 2023 selon le plan d'affaires.
Transporter les minerais vers des points stratégiques pour assurer l'efficacité opérationnelle et un approvisionnement régulier en minerai vers les usines

Transport

20-Apr

282

20863

DAILY CLEANING OF EXPORT AREAS

 

---------------------


NETTOYAGE JOURNALIER DES ZONES D'EXPORTATION

• The contractor will provide all equipment and personnel to clean the areas of the export department daily, as directed by the company representative.
• The contractor will ensure that cleanup operations are performed safely by qualified operators, as this work will be performed in the plant next to empty and loaded trucks to remove household waste, unneeded materials and shall dispose of them in accordance with KCC environmental policy.

 

---------------------


- Le contractant fournira tout l'équipement et le personnel nécessaires pour nettoyer quotidiennement les zones du département des exportations, conformément aux instructions du représentant de la société.
- Le contractant veillera à ce que les opérations de nettoyage soient effectuées en toute sécurité par des opérateurs qualifiés, étant donné que ce travail sera effectué dans l'usine à côté de camions vides et chargés pour enlever les déchets ménagers, les matériaux inutiles et les éliminer conformément à la politique environnementale de KCC.

Cleaning service

11-Apr

283

20922

Biodiversity Consultancy review

 

---------------------


Examen de la consultation en matière de biodiversité

To satisfy the requirements of the KCC HSEC Strategic Plan. To develop an understanding of ongoing potential and actual impacts to biodiversity by KCC operations and provide recommendations to manage those impacts. To provide a review of the Biodiversity Management Plan for KCC site and recommendations for improvement. To identify priority areas for biodiversity management and actions.

 

---------------------


Satisfaire aux exigences du plan stratégique HSEC du CCK. Développer une compréhension des impacts actuels et potentiels des opérations du KCC sur la biodiversité et fournir des recommandations pour gérer ces impacts. Fournir un examen du plan de gestion de la biodiversité pour le site de KCC et des recommandations d'amélioration. Identifier les domaines prioritaires pour la gestion de la biodiversité et les actions.

Environmental services

11-Apr

284

20956

ENVIRONMENTAL AND SOCIAL COMPLIANCE AUDI

 

---------------------


AUDI DE CONFORMITÉ ENVIRONNEMENTALE ET SOCIALE

Conduct an environmental and social audit of KCC operations and prepare an audit report that satisfies DRC Mining Regulations for submission to the DRC government.

 

---------------------


Réaliser un audit environnemental et social des opérations de KCC et préparer un rapport d'audit conforme à la réglementation minière de la RDC, qui sera soumis au gouvernement de la RDC.

Audit

11-Apr

285

21190

Lab analysis outside country

 

---------------------


Analyse de laboratoire en dehors du pays

1. The contractor is required to provide fully qualified and experienced Personnel to carry out analysis of Water and Soil samples (the Services) as requested by the Company’s Representative.
2. The Services to be provided shall include but not be limited to, the following:
- Routine quarterly analysis of groundwater, surface water, soil samples for pH, TSS, ORP and All Elements as requested.

 

---------------------


1. Le contractant est tenu de fournir un personnel pleinement qualifié et expérimenté pour procéder à l'analyse d'échantillons d'eau et de sol (les services) à la demande du représentant de la société.
2. Les services à fournir comprennent, sans s'y limiter, les éléments suivants :
- Analyse trimestrielle de routine des échantillons d'eau souterraine, d'eau de surface et de sol pour le pH, le TSS, l'ORP et tous les éléments demandés.

Laboratory services

11-Apr

286

21225

Statutory inspection on pressure Vessel

 

---------------------


Inspection statutaire des appareils à pression

1. Inspect the pressure vessel: consists of external equipment check, documentation check, examination of safety accessories,
2. Check the outside of the pressure vessel using the VCR in good working order with valid certificate according to NF EN ISO 17638:2003 and ISO 17640 standard (Non-destructive test weld inspection)
3. Check the inside of the pressure tank by endoscope using an endoscope in good working order with a valid certificate according to standard NF S 98-030, (Non-destructive test weld inspection)

 

---------------------

1. Inspection de l'appareil à pression : vérification de l'équipement externe, vérification de la documentation, examen des accessoires de sécurité,
2. Vérifier l'extérieur de l'appareil à pression à l'aide du VCR en bon état de fonctionnement avec un certificat valide selon les normes NF EN ISO 17638:2003 et ISO 17640 (contrôle non destructif des soudures).
3. Contrôle de l'intérieur du réservoir sous pression par endoscope à l'aide d'un endoscope en bon état de fonctionnement avec un certificat valide selon la norme NF S 98-030, (Contrôle non destructif des soudures).

Maintenace services

11-Apr

287

21305

LUILU/KTO – STORAGE SHED2 - CIVIL WORKS

 

---------------------


LUILU/KTO - HANGAR DE STOCKAGE2 - TRAVAUX DE GÉNIE CIVIL

Complete the upgrade of all areas related to the central workshops’ activities, relocated from LUILU and currently functioning without proper and safe materials storage yard.

 

---------------------


Achever la modernisation de toutes les zones liées aux activités des ateliers centraux, déplacées de LUILU et fonctionnant actuellement sans cour de stockage des matériaux appropriée et sûre.

Engineering services

11-Apr

288

21322

KTO UG 2023 - Drain Hole Drilling

 

---------------------


KTO UG 2023 - Forage

This scope of work is to drill 2 (two) long and 4 (four) short drain holes within Zone 5 of the KTO underground and instal the requisite casing. Each long drainhole will be drilled to a depth of 300m, each short drainhole to a depth of 200m and completed at HQ final diameter

 

---------------------


Les travaux consistent à forer 2 (deux) trous de drainage longs et 4 (quatre) trous de drainage courts dans la zone 5 du sous-sol de KTO et à installer le tubage nécessaire. Chaque trou de drainage long sera foré à une profondeur de 300 m, chaque trou de drainage court à une profondeur de 200 m et sera achevé à un diamètre final de HQ

Drilling services

11-Apr

289

21327

AC MAINTENANCE LABOUR HIRE FOR LUILU&KTC

 

---------------------


LOCATION DE MAIN D'ŒUVRE POUR L'ENTRETIEN DE L'AC POUR LUILU&KTC

The contractor is to perform daily inspections of all air conditioning units within the substations and MCC’s as mentioned in the introduction. Install new or replacement air conditioner units as and when required. Maintain all existing and new air conditioner units to operate efficiently to retain the correct set room temperatures of the substations and rectifier MCC’s.

 

---------------------


Le contractant doit effectuer des inspections quotidiennes de toutes les unités de climatisation dans les sous-stations et les MCC, comme indiqué dans l'introduction. Installer des unités de climatisation nouvelles ou de remplacement selon les besoins. Entretenir toutes les unités de climatisation existantes et nouvelles pour qu'elles fonctionnent efficacement et conservent les températures ambiantes correctes des sous-stations et des MCC des redresseurs.

Labor hire

11-Apr

290

21328

Power Stabilisation Feasibility Study

 

---------------------


Étude de faisabilité de la stabilisation de puissance

KCC power stabilization project is for the stabilization of the power sent to KTC and thereby adhere to specifications proposed in order to reach a goal that some or all the mills will be able to run uninterruptedly during power fluctuations or power outage

 

---------------------


Le projet de stabilisation de l'énergie du KCC vise à stabiliser l'énergie envoyée au KTC et à respecter ainsi les spécifications proposées afin d'atteindre l'objectif selon lequel certaines ou toutes les usines pourront fonctionner sans interruption en cas de fluctuations ou de coupures de courant.

Electrical services

11-Apr

291

21008

Defect Elimination Process

 

---------------------


Processus d'élimination des défauts Processus d'élimination des défauts

This contract is to increase the plant availability, reduce downtime and provide more stabile operations for the fixed and mobile plants by eliminating defects and repeat failures.

 

---------------------


Ce contrat vise à augmenter la disponibilité de l'usine, à réduire les temps d'arrêt et à fournir des opérations plus stables pour les usines fixes et mobiles en éliminant les défauts et les pannes répétées.

Maintenance service

4-Apr

292

21074

Settling pond & B3 trench cleaning

 

---------------------


Curage bassin de décantation & tranchée B3

The existing ponds are full of mud and need to be cleaned in order to have sufficient area to adequately contain all the tailings runoff from the plant. In addition, this is to ensure good tailings management and control.
This job needs to be done by a contractor because KCC lack the necessary resources to carry out this kind of work or service.

 

---------------------


Les bassins existants sont pleins de boue et doivent être nettoyés afin d'avoir une superficie suffisante pour contenir adéquatement tous les ruissellements de résidus de l'usine. De plus, il s'agit d'assurer une bonne gestion et un bon contrôle des résidus.
Ce travail doit être effectué par un entrepreneur car KCC manque de ressources nécessaires pour effectuer ce type de travail ou de service.

Maintenance service

4-Apr

293

21271

SMBS SHED REFURBISHMENT

 

---------------------


RENOVATION DU HANGAR SMBS

• Mobilisation and demobilisation.
• Skills and competencies required.
• Supply and installation required for the works.
• Term of the services are they recurring services or as required.
• Plant and equipment that will be required to conduct the services.
• Dismantle the corroded metallic roofs.
• Repair or replacement the corroded structures.
• Painting of all structures.
• Install Plastic roofing’s as per BOQ specifications and attached drawing SP0600/7900/0008.

• Concrete of the floor.
• Install exhaust Fans.
• Housekeeping.

 

---------------------


• Mobilisation et démobilisation.
• Aptitudes et compétences requises.
• Fourniture et installation nécessaires aux travaux.
• Durée des services sont-ils des services récurrents ou au besoin.
• Installations et équipements qui seront nécessaires pour effectuer les services.
• Démonter les toitures métalliques corrodées.
• Réparer ou remplacer les structures corrodées.
• Peinture de toutes les structures.
• Installez les toitures en plastique selon les spécifications BOQ et le dessin ci-joint SP0600/7900/0008.

• Béton du sol.
• Installez les ventilateurs d'évacuation.
• Entretien ménager.

Cleaning service

4-Apr

294

20953

Provision of qualified electricians

 

---------------------

 

Mise à disposition d'électriciens qualifiés

Past electrical safety audits and electrician assessments have revealed a gap in the levels of KCC electricians and the standard.
An upskilling program for electricians has been initiated and is ongoing.
To ensure the levels of KCC electricians correspond to similar levels internationally accepted, training department has taken the option to provide a 6 months training to a group of 50 electricians selected from different operational departments. Upon completion of training, the candidates will be assessed and certified by internationally recognised bodies.
This training and the certification thereafter are necessary to ensure electrical works on all KCC sites are done safely according to electrical safety standards.

 

------------------------------------------------------

 

"Les audits de sécurité électrique et les évaluations des électriciens passés ont révélé un écart entre les niveaux des électriciens KCC et la norme.

Un programme de perfectionnement des électriciens a été lancé et se poursuit.

Pour s'assurer que les niveaux des électriciens de KCC correspondent à des niveaux similaires internationalement acceptés, le service formation a pris l'option de dispenser une formation de 6 mois à un groupe de 50 électriciens sélectionnés dans différents départements opérationnels. À la fin de la formation, les candidats seront évalués et certifiés par des organismes internationalement reconnus.

Cette formation et la certification par la suite sont nécessaires pour garantir que les travaux électriques sur tous les sites de KCC sont effectués en toute sécurité conformément aux normes de sécurité électrique."

Labor hire

 

 

Embauche de main-d'œuvre

29-Mar

295

20913

Excavation of KITD (Tailings Material)

KITD tailings dump needs to be excavated in preparation for mining new phases of Mashamba East open pit

The average haulage distance from KITD to the dumping area is 2km. In order to access KITD to carry out the work in a safe manner, it is expected that dry material will need to be hauled in by the contractor to use as ballast.  Our assumption is that on average, 10% of the total excavation volume will be needed for KITD.  This material will be available in the waste dumping area to be hauled an equal distance

Mining Maintenance

17-Mar

296

20915

Bollore Warehousing and Handling

Bollore Warehousing and Handling

 

17-Mar

297

20918

Luilu nursery shadehouse civil erection

This Scope of Services under this Contract include, but not limited to the following:

• General including site establishment and site clearance
• Concrete work including reinforcement and formwork
• Building work including brickwork and plastering
• Irrigation system including plumbing.

• Assembly of the metal structure according to the design.

Construction service

17-Mar

298

20886

Mobile rockbreaker rental

The Contractor is required to provide fully qualified and experienced operators to carry out rock breaking of oversize material with two fully functional rock breakers for a period of 12months.

Rental

9-Mar

299

20888

WRD Drilling program 2023

WRD Drilling program 2023

Drilling services

9-Mar

300

20896

Talbot (Knight piesol) lab

1. The contractor is required to provide fully qualified and experienced Personnel to carry out analysis of Water and Soil samples (the Services) as requested by the Company’s Representative.
2. The Services to be provided shall include but not be limited to, the following:
- Routine quarterly analysis of groundwater, surface water, soil samples for pH, TSS, ORP and All Elements as requested.
- Reporting of analysis results and Certificate
- Analyses schedule and number of samples shall be determined by Company and subject to change in accordance with operational requirements.
3. The contractor shall provide necessary equipment and working tools.
4. The contractor shall ensure that the results from sampling is to be sent to the Company within 96h of receipt of samples.
5. Analysis in accordance with international best practice procedures.
6. The Contractor ensure that he has accreditation or in process of accreditation as independent laboratory by recognized institution (i.e. SABAS accredited lab.) and in terms of ISO9001 and other standards.

Consulting service

9-Mar

301

20897

Cleaning totes

KCC is urgently looking for a capable and certified company that can clean-up empty totes from the processing operations. These totes contained chemicals used at the plant. The purpose of this service is to ensure that the totes are cleaned and fit for the safest community use.

Cleaning service

9-Mar

302

20875

Maintenance for Jaguar air compressor

Maintenance for Jaguar air compressor

Maintenance service

9-Mar

303

20887

Minalyzer service and operation contract

Minalyzer service and operation contract

Maintenance service

9-Mar

304

20903

Luilu Operational Reliability and Refurbishment

Kamoto Copper Company recently constructed two large greenfield projects namely the Whole Ore Leach processing plant and Sulphuric Acid Plant with both plants located at the Luilu refinery concession. These plants produce an estimate of ± 300KTPA of 99% pure copper and approximately 2000 tpd of concentrated Sulphuric acid respectively. The newly constructed WOL and Acid Plant has been in operation since 2017 (WOL) and 2019 (ACID). True to the nature and operational conditions of these plants, several key areas and infrastructure has been exposed to severe operational circumstances that has led to premature failure of supporting structures, pipe racks, gantry’s, tanks, pipes, pumps, electrical equipment, civil bases, bund areas and AKS liners. KCC has identified a few refurbishment and reliability projects that must be implemented to maintain the plants sustainability and operational consistency.

Construction

9-Mar

305

20845

Drain and culvert maintenance

The scope of work includes but are not limited to the cleaning & maintenance of the culverts and drains on ALL KCC properties.

Cleaning services

24-Feb

306

20850

Canal Plus Subscription

Canal Plus Subscription

Drilling Services

24-Feb

307

20853

Construction of Water Tanks for Mine Water

Installation and commissioning of water filling station in 2 locations (1 in KOV and 1 in ME)

Mining Maintenance

24-Feb

308

20854

Kujuwa B1 offices cabling - link to LAN

Description of the Services (with breakdown and/or program of each step to be performed):
• Pull fiber from B1 building to Old Dover Office
• Pull fiber  from B1 building office to KTO Park office, distribution point
• Cabling of new building
• Network Documentation

IT Services

24-Feb

309

20841

CONTRACT STAFF

1. Provide geological core logging services
2. Provide core sampling services
3. Core boxes displacement, stacking, ranking core boxes
4. Metal boxes assemblage
5. RC and pulps samples preparation
6. RC drilling supervision and sampling
7.
Stockpiles blending
8. Open pits demarcation blocks survey

Labor hire

24-Feb

310

20855

EXPORT TRUCK PARK COOKING-EATING AND LAUNDRY AREA

The project consist of constructing a facility to accommodate a cooking area and an eating area for truck drivers at the truck parking of Luilu. The project main phases includes earthworks, civil works, steel carpentry, finishes, water supply and electrical connection.
Contractor supplies all materials, equipment and personnel for the execution of this project within the recommended timeframe and include all costs related to the project in the rates.

Construction Services

24-Feb

311

20858

ISO 9001 & 17025

ISO 9001 & 17025

Training service

24-Feb

312

20859

INSTALLATION OF FIRE DETECTION SUB 8.

INSTALLATION OF FIRE DETECTION SUB 8.

Mining Maintenance

24-Feb

313

20833

Fire Suppression Installation & Maintenance

Ansultech Crew Duties and Responsibilities-
• Provide FRA’s (Fire risk Assessment) and system designs of system installations on
equipment.
• Installations of New Ansul Fire Suppression Systems,
• Service the currently fitted Ansul Fire Suppression Systems,
• We recommend that the service intervals be monthly,
• Carry out a monthly inspection of all the fire systems fitted to the KCC Open Pit fleet
• Report all defects identified by the monthly inspections to the relevant KCC, section manager, and to carry out the subsequent repairs required,
• Respond to fire system related breakdowns

Mining Maintenance

24-Feb

314

20840

3 network licenses of Trimble TBC

3 network licenses of Trimble TBC

Licenses

24-Feb

315

20861

KCC INSTRUMENTATION AUDIT

Kamoto Copper Company (KCC) is in the process of addressing several operational improvements throughout the asset. Key focus at KTC and Luilu is to ensure that the maximum cobalt and copper is produced. Several opportunities have been identified. One such initiative is to mature the sensors, instrumentation, and control within various sections of the plants, as it is a common strategy to have the necessary control capability in place to stabilise and eventually optimise these circuits, to maximise production and production efficiencies.

KCC has therefore opted to consult with process experts to undertake a series of work streams, as part of a larger project initiative, to help audit various circuits instrumentation and develop the necessary improvement roadmaps for each circuit.

The required service aims to execute a deep and detailed diagnostic to deploy advanced process control strategies, to the following sections at KCC (in order of priority):
1. Crushing and Milling at KTC
2. Floatation circuits
3. Whole Ore Leach at Luilu (pre-leach, leach, post-leach)
4. CCD circuit and other thickeners
5. FAM Precipitation Circuits
6. Cobalt Precipitation and Drying
7. Sulphide Roasters
8. Acid supply
9. Neutralisation and lime make-up
10. High grade SX and low grade SX
11.
Copper Electrowinning

Consultancy Services

24-Feb

316

20867

KOV Disaptch Tower Overload

The existing KOV tower was not calibrated to receive so much material, which resulted in deformation.
In order to solve this problem and in view of the increase of the equipment in the area, we suggest the Installation of 25 m tower at KOV dispatch (Concreate base and earthing system to be done 1 Ohm for Earthing)

Mining Maintenance

24-Feb

317

20819

Sterilization Reverse Circulation Drilling

§ Reverse Circulation (RC) drilling and sampling of 73 000 m in/around KCC lease area.
§ Drilling will take place from surface on roads, dumps and various topographies comprising the ASA blocks therefore drill rigs should be suitable for slightly sloping surfaces (maximum 10 degrees) and rough terrain. Both wheeled and tracked drill rigs will be considered.
§ Drilling will be conducted in 3 phases following on each other with some contingency drilling included should drill sites believed to be un-available become available. The drill phases are as follow:
o Phase 1: 41 400 m – 207 holes
o Phase 2: 15 200 m – 76 holes
o Phase 3: 8 000 m – 40 holes
o Contingency: 8 400 m – 42 holes
§ Operation and servicing of two (02) RC drill rigs (staff, fuel, water etc.) to ensure a 24-hour operation (2 x 12hr shifts) and a target drill rate of 200 m/day/rig. 
§ Drilling holes to a target depth of 200 m deep from the surface. Holes will be vertical. There may be ad hoc request for slightly deeper and / or inclined holes. These should be limited to special circumstances.
§ Drilling techniques and practices should ensure optimum quality of chips, sampling and presentation.
§ Each rig to be fitted with a serviceable automated cyclonic sampler fitted with a conical sample splitter.
§ All drilling to be completed within 11 months of the agreed start date. 
§ Contractor should quote on dry rates for the SOW
§ No claim for loss equipment should be considered

Drilling Services

16-Feb

318

20820

Sterilization Diamond Drilling: ASA Bloc

§ Diamond Drill drilling of 42 500 m in/around KCC lease area.
§ Drilling will take place from surface on roads, dumps and various topographies comprising the ASA blocks therefore drill rigs should be suitable for slightly sloping surfaces (maximum 10 degrees) and rough terrain. Both wheeled and tracked drill rigs will be considered.
§ Drilling will be conducted in 3 phases following on each other with some contingency drilling included should drill sites believed to be un-available become available. The drill phases are as follow:
o Phase 1: 10 000 m – 20 holes
o Phase 2: 16 000 m – 32 holes
o Phase 3: 9 000 m – 18 holes
o Contingency: 7 500 m – 15 holes
§ Operation and servicing of six (06) diamond drill rigs (staff, fuel, water etc.) to ensure a 24-hour operation (2 x 12hr shifts) and a target drill rate of 25 m/day/rig. 
§ Drilling holes to a target depth of 500 m deep from the surface.
§ Expected hole diameter is 4,5’’ OD, 3.25’’ ID.
§ Drilling techniques and practices should ensure optimum quality of core and core presentation. Triple-tube drilling with the use of a split tube sampler is required for optimum core recovery.
§ A minimum average core recovery of 90% per month measured month on month is required.
§ All drilling to be completed within 15 months of the agreed start date.
§ Grouting of all holes drilled from surface is required.
§ Contractor should quote on dry rates for the SOW
§ No claim for lost equipment should be considered

Drilling Services

16-Feb

319

20828

SUPPORT SERVICES - GENERAL LABOURERS

The purpose of the service is to supply the Engineering Services & Projects department with the skilled workforce required for the workload.

Labor hire

16-Feb

320

20829

SEWAGE CHAMBER EMPTYING & PONDS CLEANING

This Scope of Services under this Contract include, but not limited to the following:

• Supply of rented sewage trucks for a designated period to help evacuate waste from sewage chambers.
• Supply of experienced and qualified personnel
• Managing sewage waste appropriate to avoid overflow and contamination of nearby population and environment

Mining Maintenance

16-Feb

321

20846

Waster management services

Supply suitable mobile equipment, tools, and labour to conduct the clean-up of waste material, separate useable material and transporting reusable material to an allocated area.

Mining Maintenance

16-Feb

322

20825

Mupine Labor requirement 2023

Mupine Labor requirement 2023

Labor hire

10-Feb

323

20832

EW PLANT FACILITIES RENTAL

An alternative sample product was received for plant trial but due to the fact that KCC has not facilities and doesn’t have guaranties on process, production and safety related using the product, a rental pilot plant appears a quick solution to test the new product before moving to a full plant implementation.
The scope of work aimed to rent those facilities for a period of 2 month on site.

Mining Maintenance

10-Feb

324

20843

Idle Monitor Module

Idle Monitor Module

License

10-Feb

325

20844

Glencore – KCC - Argus Monitoring  System

The proposed solution will be split in two phases, the technology verification/pilot phase which will be piloted for 7 shovels and 56 trucks. For the full project, a hardware kit will be installed on shovels and the mRoc management software will be installed and configured KCC on servers and office Desktops. Modular highly recommends that all trucks being serviced by this shovel be installed with the system to ensure maximum compliance.

Mining Maintenance

10-Feb

326

20805

Deswik Advanced Open Pit License Purchas

Deswik Advanced Open Pit License Purchas

License

3-Feb-2023

327

20803

Roaster Capacity Concept Study

Over the next 10 years, Kamoto Copper Company (KCC) anticipates a substantial change in their ore profile, which will result in a much larger proportion of the input copper to Luilu refinery to be in the form of sulphide concentrate.
KCC is interested in exploring several options for increasing roasting capacity at Luilu, including the use of oxygen enrichment and the construction of additional fluid-bed roasters. XPS was requested by Glencore Copper to prepare a scope of work for a Concept Study to evaluate options for increasing roaster throughput. These options include constructing additional roasters and/or using oxygen enrichment of the fluidising air. De-bottlenecking of the existing roasters may also
result in a capacity improvement.
The structure of the scope of work is based on elements of the Glencore Copper Study Guidelines for Major Projects. The Study Guidelines are an essential part of the Glencore Copper Capital Management Framework. The Study Guidelines also provide a methodology to define the deliverables for each stage of the project.
Two key enabling technologies will be evaluated as part of this Concept Study. The first technology is oxygen enrichment of the roaster fluidizing air. This has been used in other sulphide
roasters to increase the production rate without having to increase the physical size of the equipment. The second technology is recovering sulphur dioxide from the roaster as a byproduct such as sulphuric acid. The increased oxygen in the roaster air will also increase the sulphur dioxide concentration in the off gas. This could make the sulphur dioxide more amenable
for conversion to sulphuric acid.
A key part of the Concept Study will be identification of the risks and opportunities for the different process options. High level estimates of capital and operating costs will also be developed to support the selection of the best option. The key findings from the study will be used to build a Forward-Looking Plan for the subsequent project stages.

Consulting service

3-Feb-2023

328

20812

ARCGIS license renewal

ARCGIS license renewal

License

3-Feb-2023

329

20809

Electrical safety repairs

In December 2022, an intensive audit on electrical installation, Substation and DB installation was done to determine the condition thereof, compile, and implement a corrective action plan, now that we are getting the substations and DB on standard and safe there is fair amount of work in the field that is not up to safe and correct standard that can cause potential high risk in the plant for our employees and contractors. The main reason for this is because many of the installations were done over a long period, many of them were old, poorly maintained and do not comply with the latest requirements and standards

Electrical Service

3-Feb-2023

330

20813

Electrical audit on motors

Electrical audit on motors

Consulting service

3-Feb-2023

331

20814

Bearing refurbishment

Bearing refurbishment.
Scope of work
• STRIPPING OF THE BEARINGS
• WELDING OF THE RISER OF THE EDGES
• BEARING PRE-HEATING
• MATERIAL ANALYSIS
• BEARING TINNING
• ANTI-FRICTION ANALYSIS
• FLOWING OF WHITE METAL IN THE MOLD
• UNTICKING
• UNTICKING IN THE MACHINE SHOP
• SURFACING OF THE BEARING EDGES
• CORRECTION OF THE UPPER AREA
• ASSEMBLE OF THE TWO BEARING BEFORE MACHINING
• MACHINING THE BEARINGS
• DISASSEMBLE OF THE TWO HALF BEARINGS
• MILLING OF THE GREASSING POOL
• DRILLING OF GREASSING HOLES 
• DEBURRING
• FINAL QUALITY CONTROL
• EXPEDITE

Refurbishment

3-Feb-2023

332

20818

Sage 300 License renewal

Sage 300 License renewal

License

3-Feb-2023

333

20708

2023–KCC–Surface Resource and Geotech Drilling

core drilling of 48,919 m in/around KCC open pits.
- Operation and servicing of eight (8) diamond drill rigs (staff, fuel, water etc.) to ensure a 24-hour operation (2 x 12hr shifts) and a target drill rate of 25 m/day/rig. 
- Drilling up to a maximum of 1,000m deep holes from the surface. Holes will be inclined and oriented on the surface, drilling azimuth ranges from zero to 360 degrees.
- Orientated geomechanical drilling is required for PQ3, HQ3 and NQ3 core.
- Drilling methods and good practices to ensure optimum quality of orientation, core recovery and core presentation. Triple-tube drilling and use of split tube sampler required for optimum core recovery.
- A minimum average core recovery of 90% is required.
- Grouting on all holes is required on surface.
- The contractor is expected to confirm fully to all KCC’s relevant policies, standards, and procedures.

Drilling Services

27-Jan-2023

334

20763

3D Geotechnical Model Building

Most geological models that are being used and developed imply the implicit modelling technique which helps to refine the boundary limits of a geological model. KCC has used Leapfrog, an implicit modelling software for grade control, ore body refinements and geological displays from which geotechnical assessments are made. TECT, a contractor, has been providing and updating these models since 2019 and immense value has been achieved from using Leapfrog over the currently available software such as Surpac and Deswik

License

27-Jan-2023

335

20766

VSAT Internet Service - Marlink

VSAT Internet Service - Marlink

License

27-Jan-2023

336

20768

Historical Survey and Imagery Project Pr

1. Scan and orthorectify all relevant Keyhole Satellite imagery of the KCC pit area from the 1960s and 1970s. We will utilize that information to establish and digitize the pit crest and other visible pit features that will inform Glencore as to when maximum pit depth was reached.

2. As part of this scope of work, PhotoSat will process and deliver an additional 10 sq.km of Topographic surface data and orthorectified imagery of the Pit area.

Survey

27-Jan-2023

337

20774

Luilu Camp Demolition Phase 1

This Scope of Services under this Contract include, but not limited to the following:
• Stripping of structures & internal services of these buildings include but not limited to electrical wiring, electrical fittings, A/C units, roof sheets, doors, windows, wall boards, toilets, shower fittings, plumbing lines and geysers.
• Removal and relocation of furniture to be donated, including but not limited to beds, tables, chairs, cupboards.
• Removal and transportation of containers to a location within 1km radius
• Removal and relocate workshop tools and equipment within Luilu
• Dismantle and removal of steel structures

Construction service

27-Jan-2023

338

20775

Luilu camp Earthworks phase 1

This Scope of Services under this Contract include, but not limited to the following:
• Excavate and remove all existing isolated services in work area, excavations to be backfilled and compacted
• Demolish existing sewage chambers, over-excavate, and dispose of material at dump site to be nominated by the Client, but within a radius of 4.5 km.
• Import material for backfilling sewage chamber excavation, backfill and compact
• Remove existing Installation of services piping and buried electrical cables.
• Surface strip surface soil and dispose at designated dump site within a radius of 4.5 km, to be determined by contract owner
• Import material for work site, backfill and compact as per BOQ

Construction service

27-Jan-2023

339

20776

IPC apron feeder head drive replacement

IPC apron feeder head drive replacement

Mining maintenance

27-Jan-2023

340

20779

ASA Blocks drilling: full project Manage

§ To conduct ASA block full drilling project management in/around KCC lease area.
§ ASA project will take place from surface on roads, dumps and various topographies comprising the ASA blocks therefore drill rigs should be suitable for slightly sloping surfaces (maximum 10 degrees) and rough terrain. Both wheeled and tracked drill rigs will be considered.
The project includes 85 inclined Diamond drill holes to a depth of 500 m on a 400X400 m grid spacing. this grid will be further infilled by RC drillholes to a maximum depth of 500 m on a grid of 400x400m, except where existing exploration drilling is available.
§ Control the cost and quality in line with the project objectives
§ To conduct all activities of core process at the core shed
§ To capture all geological data in Database
§ To execute this project, it required: planning, detailed drilling organization with respect to safety standards, management and quality control of whole drilling  execution steps up to deliver as final product a related details drilling database with geological exploration standards.

Consulting service

27-Jan-2023

341

20784

Earthwork Contract ASA BLOCK DRILLING

§ Provide equipment with appropriate manpower to carry out earthworks to prepare the access and the platforms for Diamond and RC drilling in ASA BLOCK drilling project. ASA project will take place from surface on roads, dumps and various topographies comprising the ASA blocks project.
§ In the slightly remote area, it will be required to the contractor to establish the access
§ The equipment required are Dozer, grader and TLB
§ Operations will be on daily basis and supervision is always required to provide full coverage.
§ The size of a DD platform must be 15X20 meters around the DDH point and for RC drilling 10X10 meters
§ Contractor should quote on dry rates for the SOW

Mining maintenance

27-Jan-2023

342

20785

Support improvement on asset register

Purpose intended within this scope of works is to optimize the spare parts and components management & maintenance scheduling strategies, to improve the compliance to plan, during maintenance execution activities, ensuring equipment are being maintained as per the optimised strategies. This improvement contract will focus on the update of the Asset’s Registers and their criticality, update the Bill of Materials (BOMs) and spares parts required to perform all the maintenance strategies and tactics across all Kamoto Copper Company (KCC) assets / equipment, with an initial focus on the KTC Plant.

Labor hire

27-Jan-2023

343

20786

Mupine Pumping System electrical install

Kamoto Copper Company herein refer to as the Company have bought a new pumping system for Mupine TSF, this however requires electrical installation work to be completed and commissioned. The pumping system is business critical as it is used for the return water to KTC plant.

Engineering services

27-Jan-2023

344

20789

Road Extension

The Scope of Work to be performed shall include, but not be limited to the following:

Note: Refer to Bill of Quantities for all Earthworks, Concrete, Formwork, Reinforcing

1. SX access road

1.1 Earthworks Construction Phase:
• Backfill and compact to 95% Mod AASHTO as required up to 300mm below NGLV for foundations, bases, trenches and surface beds, etc. and use for backfilling or embankment.
• HDPE 1.5-micron liner to be placed on surface bed and gully areas and welded at all 150 mm overlaps.

1.2 Concrete, Formwork and Reinforcement:
• Rough formwork to sides of concrete surfaces.
• High Tensile Welded Mesh, Install type reference 395
• High Tensile Reinforcing Steel. Cut, bend and install in all diameters.
• Concrete 30MPa/10 -15mm high density. Reinforced concrete in bases, trenches, plinths, surface beds, and columns, etc.
• Unformed Surface Finishes. wood floated finish to horizontal concrete floor surfaces bed.
• Isolation and Saw cut joint as per drawing
• Concrete cover to me absolute minimum of 50 mm to a max of 75 mm.
• Concrete must be poured/placed as monogamous pours between movement joints. No construction joints will be allowed other than surface bed and wall/bases. All cold joint needs to be thoroughly scabbled and clean of latent before new concrete is placed.

Construction service

27-Jan-2023

345

20794

Illing SLA & Improve Asset Reliability

Illing SLA & Improve Asset Reliability

Mining maintenance

27-Jan-2023

346

20795

SANDBLASTING AND SPRAY PAINTING

to provide on-site service that will ensure the sandblasting of components, machineries’ frames, welded fabrications, pumps, valves, scaffolding elements, etc. and supply paint to deliver built or rebuilt equipment by central workshop to the end user in a professional way, close to original manufactures’ standards.

Mining maintenance

27-Jan-2023

347

20791

SUPPLY HYDRAULIC HOSES ASSEMBLY ON SITE

SUPPLY HYDRAULIC HOSES ASSEMBLY ON SITE

Mining maintenance

27-Jan-2023

348

20793

SCM General workers for SCM Operations

Contractor will provide workers to perform different general warehousing tasks such as, not limited to:
• - Move material from different warehouse locations
• - Hook big bag during offloading operations
• - Help forklift operators as spotter
• - perform housekeeping in their area of work
• - carry material from different Bin location to the issuing point
• - Operate forklift for different warehouse needs
• - workers to perform work on shift (Day): 7:00 -19:00 and (night) 19:00-7:00
• - workers to perform on Normal hours (7:00 - 16:00)

Labor hire

27-Jan-2023

349

20797

MI Core Annual Software Maintenance

MI Core Annual Software Maintenance

Software

27-Jan-2023

350

20737

LV Drivers for Mine Shift Change

• Provide drivers for the light vehicles around the open pits at KCC to facilitate shift change for the open pit operators in good operating conditions for day and night shift transportation for mine operators. The role will primarily be used to move incoming and outgoing operators in and out of the mine at shift change (3 x per day). Outside of shift change times, drivers will be expected to clean and refuel LV’s and prepare all vehicles and associated issues (tyre replacement etc) for the next shift change.

Labor hire

6-Jan-2023

351

20739

Architectural and Engineering Design

This scope of works is  to design a new school on a 1300mx300m plot .The design should include :
• Architectural plans with all the necessary details (civil and structure)
• Electrical plans according to IEC Standard standards
• Plumbing plans
• Bill of Material and Bill of quantity for civil
• Cost Estimate

Engineering services

6-Jan-2023

352

20731

COBALT CAPTURE LAB TEST

Develop/improve on the technology business case: Identify technology alternatives, rank technology alternatives, and develop technology alternative business cases.
For this project to be successful it required to understand whether the business case assumptions are valid. To reach this conclusion we need to have the identified technologies (from the Metallurgical Consulting work) assessed through preliminary tests at bench scale. This work also requires assessing of ion exchange reagents, if multiples are available, for their efficiency and potential drawbacks. The test work will be performed on slurries and effluents as provided by Glencore.
At the time of conception, it is anticipated that the technology solutions capable of reducing the cobalt in the process streams are closely related to Ion Exchange (Column based IX, or Resin in Pulp). However, for brevity SX may well prove successful too.
Given the expected technologies to be employed, the following test work is anticipated. (It falls to the vendor to also detail any additional test work they might recommend.)
• Resin loading / Absorption tests – How effective the resins are at adsorbing cobalt from effluent and Slurry.
• Assays for impurities which are also adsorbed into the resin.
• Isotherms – to help with sizing and opex considerations
• Total dissolved solids (TSS) for effluents

Consulting service

6-Jan-2023

353

20735

Calibration of 10 Mechanical and Electrical

• Provide a short, but concise ‘Background’. This provides the tenderers with an early understanding of the mine ownership, site operations, location, and extent of mining operations, specific tender requirements and Glencore’s Sustainability approach.

• The certification of measuring instruments for structural and condition monitoring inspection is a mandate based upon OEM and the ISO 9001-2015 standard (Quality system management). The frequential interval for this mandatory certification should be done every one year of usage through course of which the instruments is calibrated to guarantee the accuracy of the measurements and to avoid errors (false results of the measurements)..

Calibration

6-Jan-2023

354

20740

ITIL Phase 2 implementation project

ITIL Phase 2 implementation project

IT service

6-Jan-2023

355

20654

KTO UG – silo and feeders level control

Control the ore level in the silo & Feeders and replace damaged LCD display 1. Pull instrument cable
2. Fabricate LIT support
3. Install LIT
4. Gland and terminate instrument cables
5. Cable rack installation size 150mm
6. Assess and optimize the wiring
7. Underground ABB PLC programming and Engineering
8. Shaft 1 ABB PLC programming and Engineering
9.
Shaft 1 LCD display replacement
10. Test and commissioning

Maintenance service

6-Jan-2023

356

20744

Dosimetric monitoring of agent  KCC MIN

The contractor must present a project to prevent and protect workers working under ionizing radiation against the effects of the latter by controlling the doses absorbed. It must therefore develop a dosimetric monitoring project for workers under ionizing radiation.

This project will consist of:
• Evaluate or determine with KCC the list and number of workers who will be monitored;
• Determine the different exposures, work procedures and appropriate dosimeters;
• Provide a dosimetric monitoring program;
• Ensure the supply of passive dosimeters;
• Determine the place and mode of the analysis of passive dosimeters (reading);
• Determine the archiving mode of individual data;
Provide the ability to provide spare dosimeters on time.

Consulting service

6-Jan-2023

357

20626

Welding of metal bumpers of new Sandik T

Cutting of Hardox Metal Sheet
- Welding of Front Bumpers side plate left and right 1500x350x50mmx2
- Welding of back protection side plates and right 1000x200x50mmx8
- Painting of all protection side plates

Mining maintenance

6-Jan-2023

358

20756

BOUNDED WALL AT THICKENER X4 & Y4

The bounded area (X4 &Y4) receiving sulphur from KTC forms a storage place for all the waste and various materials washed away by the passage of rainwater.
And the objective of this project is to prevent the entry of these foreign materials in this area in order to avoid the repulping in the circuit.

Construction service

6-Jan-2023

359

20759

International SOIS - transition services

International SOIS - transition services

Medical service

6-Jan-2023

360

20601

Process diagnostic and optimization

Glencore Copper’s Kamoto Copper Company (KCC) is in the process of addressing several
operational improvements throughout the asset. Key focus at KTC and Luilu is to ensure
that the maximum cobalt and copper is produced. Several opportunities have been
identified. One such initiative is to mature the sensors, instrumentation, and control within
various sections of the plants, as it is a common strategy to have the necessary control
capability in place to stabilise and eventually optimise these circuits, to maximise
production and production efficiencies.
Glencore has therefore opted to consult with process experts to undertake a series of
work streams, as part of a larger project initiative, to help audit various circuits
instrumentation and develop the necessary improvement roadmaps for each circuit.
This project relates to Glencore’s technology transformation plan as it seeks to achieve
maximum throughput and recovery by leveraging available fixed plant assets and data.
The following value levers has been identified and are classified in direct or positive
externalities around the business unit.

Mining Operation

16-Dec-2022

361

20613

Liner laydown yard and car parking construction

This Scope of Services under this Contract include, but not limited to the following:

• Site clearance with vegetation removal.
• Bulk earthwork on the whole areas and compaction with allowances for drainage.
• Backfilling of imported materials.
• Fencing and gates installation.
• Security huts constructions for access regulation.

• Electrical installation for lighting.

Mining Operation

16-Dec-2022

362

20695

HGAC Circuit Reconfig. - Concept Study

Based on the life of asset mining plans, Kamoto Copper Company (KCC) expects an increase in
gangue acid consuming (GAC) minerals beyond the processing capability of the current
operations: KTC- a concentrator comprising seven milling circuits with dif ferent flotation
configurations, and Luilu, a downstream processing facility comprising whole ore leach (oxides)
and sulphating roasting (sulphates). Copper solution is purified by solvent extraction and plated
in conventional electrowinning tank houses, whilst cobalt in solution is precipitated by lime and
milk of magnesia to produce a hydroxide salt.
An intermediate implementation was performed by KCC to modify the existing hydro-mining
circuit to exclusively process high GAC ore fingers from mining.
See Figure 7 for KTC block flow diagram. Processing of high GAC ore is paramount:
a. High GAC ore samples contain appreciable quantities of cobalt and copper.
b. The acid production f rom the on-site acid plant will be exceeded, necessitating either
lower throughput, or a process modification towards GAC removal in the flotation circuit.
Due to the high GAC expected in the HGAC ore, it is not feasible to leach this material
directly due to the high acid cost and excessive heat generation.
c. KCC has started the segregation of primary ore production in 2027 into High GAC oxide
ore (>80 kg/t). Low GAC oxide ore (<80 kg/t) and sulphide ore (which contains >80%
sulphides). Majority of the High GAC ore comes f rom the KOV open pit ore body.
Through good mine planning and mining hygiene practices, KCC is confident that these
three ore types will be able to be mined separately and segregated efficiently to allow
distinct processing of each.
d. High GAC ore is thus mostly oxides with less than 20% sulphides and Ca levels ranging
f rom 2-8%.
e. Mineralogical assessment of High GAC ore samples has shown the calcium almost
exclusively present as dolomite with little association between Cu/Co and the gangue
minerals.

Consulting Services

16-Dec-2022

363

20709

KTC RESTAURANT CONSTRUCTION

This Scope of Services under this Contract include, but not limited to the following:

• Earthworks for containers platform and for stairs
• Concrete works for containers plinths (ablution and restaurant) and for staircase.
• Plumbing connection of the containers to the sewage chamber with all necessary accessories.
• Supply and install water tanks and water pumps for water storage and distribution. 
• Supply and install one extra 6m treated container for storage.
• Supply and install steel shed between container modules
• Supply and picnic tables as extra furniture.

Construction services

16-Dec-2022

364

20712

KTC MILL SCAN TENDER

KTC has 7 primary mills and 6 ball mills  - each mill is to be scanned once per month as opportunity allows
Mill inspections reports are to give clear predictions on end of life of the mill components to allow for suitable shutdown planning

Mining Maintenance

16-Dec-2022

365

20720

Dassault - Geovia\ Surpac license

Dassault - Geovia\ Surpac license

License

16-Dec-2022

366

20721

AMT software license renewal

AMT software license renewal

License

16-Dec-2022

367

20722

EW MANUAL STRIP-SEGREGATION-CELL MTN

As the stripping machines 1&2 are running on semi-auto, we need a support of some contractors to sustain the production on quantity and quality by doing manual strip, segregation, weighing, strapping, housekeeping and cell maintenance.

Labor Services

16-Dec-2022

368

20723

Implementing and Operating Cisco Security

Implementing and Operating Cisco Security

Training Services

16-Dec-2022

369

20724

Electrical work for liner & restaurant

The targeted site for KTC new liners laydown on the left side of the KTC bus parking is a targeted area for the new laydowns for Mills liners. Moreover, a section of the Area together with the area on the left side of the KTO Main entrance gate will be used for the new KTC Car parking area and restaurant facilities for all KCC employee working in KTC. Therefore, KCC requires to install lights in this new area and powering the restaurant installation.
This scope of works details and steps all electrical works related to light poles installation in the new liner laydown area and electrical installation for the new restaurant.

Electrical Services

16-Dec-2022

370

20725

Liner handler beam refurbishment

Kamoto Copper Company (KCC), a large mining company in the DR Congo owns the Kamoto Concentrator (KTC) which was commissioned more than 50 years ago but fell in the 90s under subpar maintenance and operations which resulted in lot of structural steel deterioration due to corrosion, mechanical stress,... Etc. This current scope of works intends to address some of these issues by employing a subcontractor to carry out corrective works on structural steel members during a 3 months project to deliver works compliant with best industry standard and restore the integrity of the concentrator structural steel

Mining Maintenance

16-Dec-2022

371

20726

NETWORK ASSESSMENT AUDIT

KCC Open pit mining operations deploy multiple fleet management, collision avoidance and fatigue management technologies amongst others. The current mesh network has been established making use of Rajant technologies by design and this is the standard technology across all mining operations for Wi-Fi networks. The underground operations are in the process of installing and commissioning collision avoidance technologies (CAS) to enhance safety and reduce employee risk exposure with regards to mobile equipment interaction hazards in line with the requirements of fatal hazard protocol 4 (FHP4).

These technologies transmit data from the operational fleet to the surface control rooms by means of network systems. An upgrade to the underground network is in progress standardising on Rajant technologies to ensure consistency and standardisation of design and inventory holding at KCC. At present, the only technical network support being provided is by means of an existing contract for remote support. Remote network support is acutely limited at present and it is not serving the required intent to ensure effective monitoring, control and reporting of critical network performance information.

Network coverage, latency issues, bandwidth information which are all imperative for the effective operation of fleet management and operator safety systems (fatigue management and CAS technology) are inadequately monitored for reliability and response support on the Rajant network by agents situated remotely is ineffective. High availability networks are required to ensure the adequate functioning of all fleet safety and productivity technologies. At present, the remote network support contract in place is inadequate and a need for on-site network support on the standard Rajant networks is required, especially considering the planned expansion of the network into the underground operations at KCC (KTO).

IT Services

16-Dec-2022

372

20715

REFINERY CAMERA INSTALLATION

Pull Fiber optic cable and Splice (Length 10 000M)
- To Pull UTP and doing connectors (Length 10 000M)
- To Install 70 Junction box and mount 70 cameras.
- To Install Cabinet Enclosure Mounting and Installing 30 Cabinets

IT Services

16-Dec-2022

373

20612

ROASTER 5 FURNACE REPAIRS

Currently, the roaster5 top cover of the vault and expansion joint conditions is very bad and require major repairs to guarantee roaster life.
As we know the space between the roof of vault and the concrete allows the furnace to breathe.
this bad situation requires a quick repair to avoid heat and smoke dissipation.

Mining Maintenance

16-Dec-2022

374

20646

2 Ventsim licenses and 12 Months  maintenance

• Purchase of additional 2 Ventsim licenses 
• Annual maintenance extensions service for those licenses

License

16-Dec-2022

375

20682

Fire monitoring in substation and MCC

KCC has some fire detection and quenching system of substations and MCC which are not operational. To mitigate fire effect there is a need to monitor and fight fire in case of start 24 hours/7 days.

Mining Maintenance

16-Dec-2022

376

20660

Replacement of Fuel Management System

As part of the KCC fuel stations upgrade to efficiently manage, report and reconcile fuel stocks movement the existing FMS in use will be replaced.
The current FMS called FAMS is not designed to handle the volumes of KCC operations. There are several integration failures to other systems in use and high risks of uncontrolled fuel dispensing. On completion of the upgrade, automated vehicle recognition, equipment burn rate, data processing in SAP, AMT integration, fuel leak detection, reorder point, safe fill alert, accurate ATG and reports will be available.
This scope of service will consist of installation of fixed units’ plinths, mobile units, fuel tags on LVs and other diesel-powered equipment. The RFS set up, GPS link, system integration to SAP and AMT.

Mining Maintenance

16-Dec-2022

377

20662

LV Drivers for Mine Shift Change

• Provide drivers for the light vehicles around the open pits at KCC to facilitate shift change for the open pit operators in good operating conditions for day and night shift transportation for mine operators. The role will primarily be used to move incoming and outgoing operators in and out of the mine at shift change (3 x per day). Outside of shift change times, drivers will be expected to clean and refuel LV’s and prepare all vehicles and associated issues (tyre replacement etc) for the next shift change.

Transportation Services

16-Dec-2022

378

20688

TFM Upliftment of 3000Mt of lime

TFM Upliftment of 3000Mt of lime

Transportation Services

16-Dec-2022

379

20689

UHP water for internal pipe cleaning

UHP water for internal pipe cleaning

Cleaning service

16-Dec-2022

380

20691

Mupine CQA 2023

Mupine CQA 2023

Mining Maintenance

16-Dec-2022

381

20693

International Travel- Accommod- Transfer

International Travel- Accommod- Transfer

Transportation Services

16-Dec-2022

382

20587

LIMESTONE GRINDING TEST

Glencore jointly owns the Kamoto Copper Company (KCC) which mines and produces Copper and Cobalt at the Luilu refinery in Kolwezi in the Southern Democratic Republic of the Congo (DRC).

The raw material after crushing, milling, and floatation are acid leached to dissolve Coper and Cobalt. The leach pulp is thick and wash in a counter current decantation system (CCDs) and the final tailing are neutralized with milk of lime prior to send to tailing dams. Therefore, the overflow of CCDs after Solvent extraction constitutes the Low Grade raffinate which feed Cobalt production plant by selective precipitation of impurities with milk of lime before producing Cobalt hydroxide. 

Several challenges have been faced for months at the lime plant, impacting the overall performance of copper & cobalt Plant and this is now the major bottleneck of the entire processing operation.
An alternative solution was identified to partially or completely substitute the quicklime by limestone, this option will have below impact on the process:
• Reduction of operating cost as the limestone is cheaper
• Reduction of carbon footprint regarding then from production to product consumption
• Reduction of wastes generated as limestone is delivered in dump truck and does not require polypropylene bags
• Safer working condition as limestone makeup process does not generate dust and is not skin irritant
• Reduction of cobalt losses at FAM as limestone in known to entrain less cobalt at precipitation process.
The main objective of this scope of work will be to characterise the limestone milling parameters to design the comminution circuit of the limestone plan project.

Mining Operation

25-Nov-2022

383

20621

KOV-ME & MUPINE-Remote SSR Monitoring Se

Description of the Services (with breakdown and/or program of each step to be performed):

The scope of services to be performed shall include, but not be limited to the following:
• Continuous real-time monitoring of eight (8) radars for KOV, ME and MUPINE
• Review and interpret data to ensure consistent data optimization
• Respond where required to triggered alarms and significant changes in deformation trends
• Provide input to site personnel and ensure the earliest possible operational response to any new risk relating to identification of wall movement ensuring any potential impact on production due to newly identified Geotechnical hazards is minimised and the maximum safety benefit of SSR monitoring is realised. A project specific Trigger Action Response Plan (to align with site processes) has been drafted to identify and document appropriate responses to particular levels of risk associated with:
o Changing ground conditions (i.e., identification of linear or progressive deformation trends)
o Triggered alarms
o System or communication failures
o Atmospheric or other events leading to the requirement for relocation of stable reference
Areas
o Correct and effective application of enhanced deformation masking to optimise application of the enhanced deformation algorithm for extreme atmospheric conditions/events

Training Services

25-Nov-2022

384

20643

SMC Tests on Mashamba Ore

KCC processes ore from various open pit and underground sources. One of these open pits, Mashamba East, have been identified as causing a possible reduction in mill throughput due to its ore hardness and grindability. This needs to be confirmed and compared to the KCC geometallurgy program results. The results from this program will enable KCC to better plan milling strategy and production in future.

Objectives

To determine the Mashamba East ore hardness and amenability to be processed in a single stage SAG mill by performing SMC (Sag Milling Comminution) tests on 16 different drill core samples. These ore hardness results will be compared to the geometallurgy database.


Scope of work

• Sample receipt and preparation
• SMC tests on 16 different Mashamba East drill core samples which will represent four different lithologies from the Mashamba pit
• Review and analysis of the results
• Sample storage and/or disposal

Deliverables

A final report showing the SMC test results with photos of the core samples and interpretation of the results. Interpretation of the results should include applicability for single stage SAG milling and suggestions of the optimum grinding circuit for this ore type.

Mining Operation

25-Nov-2022

385

20647

BIS Radar data- Slow Movement Analysis


The scope of services to be performed shall include, but not be limited to the following:
Provide a service of Slow movement analysis over IBIS Radar data set containing at least 3 months of monitoring data from a single radar installation in the same position and conduct advanced training on IBIS Radar data analysis.
The report on slow movement analysis will contain:
• Monthly and total cumulative slow-movements displacement maps
• Monthly and total average slow-movements velocity maps
• Time series (plots showing displacement vs. time, velocity vs. time and/or inverse of the velocity vs. time) of points/areas located in significant sectors of the monitored scenario (selected along with the user, maximum of ten points/areas over the map)
• Comments about the presence of significant changes detected by the radar with respect to the previous six months.
Onsite advanced training on IBIS radar data analysis contains for modules as follows:
• Module 1 – Radar Interferometric Radar Features
• Module 2 - Slope deformation in open pit mining (refresh of rock mechanics)
• Module 3 – Slope Stability Hazard Monitoring with Guardian
• Module 4 - Best practices for slope monitoring with IBIS radar:

Mining Maintenance

25-Nov-2022

386

20648

Inspect maintain and repair lifelines

The Supply Chain Management (SCM) raised the need to issue maintenance Contract to maintain all installed lifelines for KCC, based in Luilu, KTC and KTO.

It is in our best interest to provide the safest environment for all employees, and therefore we need to maintain our Structural overhead beam lifelines, including the horizontal lifelines. These lifelines are used almost 20 hours per day with Reagents (abrasive).

Mining Maintenance

25-Nov-2022

387

20649

EW3 FLOOR REPAIRS

This scope of work is to provide high skilled artisan labour, PPE, tools, safety officers and supervision to repair the structures and apply acid proofing on deviations observed identified at  EW3 plant in (LUILU) in order to comply with Glencore safety standards.
Materials and consumables will be supplied by KCC.
Contractor must be ready to site establish and commence work as soon as possible (preferably on the 01 September 2022).
Contractor must provide a confirmation letter to ensure they understand all safety and environmental aspects in EW3 as below described on point 6.1 SOW fundamental.
Contractor must submit a Quality Control Plan (QCP) for the approval by the client prior to commencement of work and detailed Methodology on working in EW3, Coating of structures and Acid proofing.

Mining Maintenance

25-Nov-2022

388

20655

EW2 Cathodes & Anodes workshop construction

Preambles: -
Floor slab, Foundation, drains and sump.
· Saw cut.
· Demolish existing slab to construct drain,
· Excavate in existing ground for open channel drains,
· Remove existing acid proofing & scabble existing concrete.
· Neutralise existing concrete slab using line water solution.
· Drill & epoxy Y12 bars into existing floor slab.
· Fix rebar for drain & foundations,
· Fix rebar at the base as per drawing,
· Fit the holding bolts,
· Place mesh reinforcement for floor slab,
· Cast concrete floor slab, a new one around building, foundation, and drains allowing for
construction joints as shown on drawings
· The concrete floor slab to have wood float finish.

· Housekeeping

Construction services

25-Nov-2022

389

20657

RME relining machine

The scope of supply covers the supply of all materials and construction of the WORK as
stated herein and as specified on the order.
All Work and safety shall as a minimum conform to:
• Mine Health and Safety Act 29 of 1996 (if applicable).
• Directives from the Department of Labour and or the Department of Mineral and
Energy Affairs, amendments and re-enactments thereof and other provisions having
force of law, particular to that geographical area in which the PROJECT falls
• Occupational Health and Safety Act and Regulations 85 of 1993.
• Including all local and provincial regulations and the latest revision and amendments
thereof.

• SANS 10120 Serie

Mining Services

25-Nov-2022

390

20658

CM5 SCATS AREA BUNDWALL RECONSTRUCTION

This Scope of Services under this Contract include, but not limited to the following:

• Demolish the failed wall and dispose.
• Fabricate, supply, and install new pipe ruck support. (steel work)
• Excavations for the new wall foundation and disposal.

• Build a new concrete wall.

Mining Services

25-Nov-2022

391

20656

REFUGE CHAMBERS SERVICES AND MINE ARC TR

1. Services for refuge chambers 2. Training and certification on maintenance for refuge chambers.

Training Services

25-Nov-2022

392

20661

NETWORK ASSESSMENT AUDIT

KCC requests Cong Online Solutions SARL to conduct a Network Assessment Audit and shares recommendations. As mining businesses grow, it usually needs to scale up its operational networks to accommodate new requirements and to deliver a more extensive range of capabilities. Often during the operational pressures to increase production targets and operating under budgetary constraints, the essential maintenance tasks are neglected or delayed which are detrimental in the long run for productive output. The main goal of this proposal is to ensure the gaps in the process are identified and corrected to ensure strategic goals of the company are met.

The report will be accompanied by a complete bill of materials (BOM) for the various phases of the project to achieve the project objectives and scope of work.

Training Services

25-Nov-2022

393

20664

Cleaning of WW Hospital's Facilities

CLEANLINESS is the core of all actions related to infection control prevention (ICP), safety and hygiene within the Watu Wetu Healthcare Facilities.  It is considered as the first step in the technical / physical procedure related to disinfection and sterilization.  These two elements converge to produce a feeling of well-being and safety to patients, their families and the healthcare professionals who work inside the hospital / healthcare facility environment.
An effective healthcare cleaning service should:
• Be customer focused
• Provide clarity for all personnel responsible for ensuring the healthcare environment is clean and safe
• Enhance quality assurance systems
• Address governance and risk assessment
• Be consistent with infection control prevention (ICP) standards and requirements
• Have clear objectives that provide a foundation for service improvements
• Be flexible to meet the needs of specific healthcare environment circumstances, and priorities
• Have well documented cleanliness policies and procedures
• Provide for a culture of continuous improvement
• Be flexible, to meet the ongoing needs of operations service delivery
• Consider the health, safety, and well-being of patients, personnel / staff, and other members of the public
• Be efficiently delivered.

Cleaning services

25-Nov-2022

394

20665

SX PRIMARY MIXER TANK MANUFACTURE

This scope of work is to provide high skilled boiler makers and welders workers, PPE and supervision to manufacture and test the tank as per BOQ.

- Contractors must be ready to site establish and commence work as soon as possible.
- Contractor must supply all tools and equipment for manufacture the tank , staying within KCC SHEQ rules.
- Contractor must provide the job plan with letter completion date confirmed.

Mining Maintenance

25-Nov-2022

395

20667

SULFIDE CIRCUIT PROVIBUS NETWORK IMPROVE

Refinery sulfide circuit ICSN consist of remote terminal units, variable frequency drives and direct online network for plant automation system. The actual condition of all ICS structure does not guarantee business continuity. Therefore the sulfide, MCCs and RIOs of ICSN required renewal to ensure a business continuity.

IT Services

25-Nov-2022

396

20530

KTC plant cleaning crew

The scope of work (SOW) under this Contract includes, but is not limited to the following:
The Contractor is required to provide qualified and experienced personnel, to be able to carry out general housekeeping and cleaning services in the KTC – Milling - Flotation - Tailings - Reagent and workshops sections.

Scope of work

Provide experienced manpower for:
• General housekeeping.
• Physical removal and hosing of spillage / slurry if required.
• Handling and movement of equipment to enable the cleaning crew to effectively conduct housekeeping and cleaning operations.
• Cleaning spillage along and under conveyors and structures.
• Cleaning spillage around Milling - Flotation - Tailings - Reagent.

Cleaning services

25-Nov-2022

397

20669

GPS Courier Service Between KCC and MUMI

Services required as follows.
• Transport of 100 GPS to Mutanda Truck park
• Services to be rendered on a daily basis, 7 days a week
• Given the weight of the 100 GPS units it can be done by motor bike
• Would suggest that the motor bike be fitted with a delivery box on the back.
• Units to be placed in a box for ease of handling
• Units will be collected from KCC either early morning or late afternoon, then delivered to Mutanda Truck Park that same day;
• No subcontracting will be allowed
• The Service provider not permitted to stop for any other passengers on route to Mutanda
• Value of 100 GPS units US$ 1,000
The following to be provided by the Service provider
• Roadworthy Vehicle
• Fuel to be supplied by the Service provider
• If per motorbike, all protective clothing and helmet for the Service Providers account
o Helmet;
o Protective shoes;
o Bikers jacket, and
o gloves

Mining Services

25-Nov-2022

398

20672

Renewal iSpring software License for LMS

Renewal iSpring software License for LMS

License

25-Nov-2022

399

20676

Reagents Forklifts Support - Offloading

Reagents Forklifts Support - Offloading

Labor hiring

25-Nov-2022

400

20677

KTC ball mill and critical spare audit

This Scope of Services under this Contract include, but not limited to the following:

• Supply labour for a period of 30days to perform audit on KTC ball mills and critical spare. Contractor to supply:
- Mill experienced Condition monitoring NDT technician
- Mill experienced skilled labour
- Mill motor experienced electrical technician
- Mill experienced technical specialist
Scope of services to be done:
• Detailed mechanical condition audit of 6 x KTC ball mills and critical components
• Mechanical inspection of on-site critical spares for each mill.
• NDT critical components on 6 x KTC Ball mills.
• NDT of on-site spares for each mill.
• Electrical audit on Mill main motor for 6 x KTC Ball mills & Spare main motors.
• Detailed condition reports on separate mill & on site spares condition for specific mill.
• Critical spares list per mill.
• Recommendations for repairs to mills.

Mining Maintenance

25-Nov-2022

401

20673

Deswik - License renewal

Deswik - License renewal

License

25-Nov-2022

402

20678

Dedicated internet - Kapanga

Dedicated internet - Kapanga

IT Services

25-Nov-2022

403

20679

ELECTRICAL CAD SOFTWARE SEE ELECTRICAL

ELECTRICAL CAD SOFTWARE SEE ELECTRICAL

License

25-Nov-2022

404

20659

Annual accreditation and surveillance

Annual accreditation and surveillance

License

25-Nov-2022

405

20662

LV Drivers for Mine Shift Change

• Provide drivers for the light vehicles around the open pits at KCC to facilitate shift change for the open pit operators in good operating conditions for day and night shift transportation for mine operators. The role will primarily be used to move incoming and outgoing operators in and out of the mine at shift change (3 x per day). Outside of shift change times, drivers will be expected to clean and refuel LV’s and prepare all vehicles and associated issues (tyre replacement etc) for the next shift change.

Mining Maintenance

25-Nov-2022

406

20682

Fire monitoring in substation and MCC

KCC has some fire detection and quenching system of substations and MCC which are not operational. To mitigate fire effect there is a need to monitor and fight fire in case of start 24 hours/7 days.

Mining Maintenance

25-Nov-2022

407

20631

ISO 14001 for 10 employees from SKM, MTN-Garage, Process Luilu, Process KTC, Facilities and MTS/Mining.

ISO 14001 for 10 employees from SKM, MTN-Garage, Process Luilu, Process KTC, Facilities and MTS/Mining.

Training Services

17-Nov-2022

408

20637

Radar Technical Training: At GroundProbe

Radar Technical Training: At GroundProbe

Training Services

17-Nov-2022

409

20650

LEGAL ASSISTANC FOR LEGITIMATE SUSPICION

The  tender planned by the Legal department to recruit a law firm based in Kinshasa to contest unfair decisions rendered against KCC by local courts.
On the grounds of those partial decisions, KCC’s bank accounts have been seized several times in 2019, for a total amount of approx. USD 7 million.
In order to mitigate this risk before the courts of Lualaba, KCC must:
- Make more legitimate suspicious claims to refer ongoing cases to another court, out of the Lualaba Province;
- Initiate civil actions against the judges for miscarriage of justice;
In regard of the claims, they have to be systematically taken at the Cassation Court in Kinshasa.
Presently, KCC has one contract with a local law firm, based in Kolwezi & Lubumbashi and consequently:
- Could not follow-up on regular basis litigations brought to the Cassation Court (Kinshasa)
- KCC would have to engage additional fees (flights, accommodation, procedural fees, etc.)
- Their reactivity would not be adequate to counteract effectively the Lualaba Courts
A common call for tender (KCC-MUMI) is therefore the preferred solution to:
- Benefit from an economy of scale (between KCC and Mumi)
- Compare the market and find a suited Law firm in Kinshasa
- Have a dedicated team in Kinshasa that will increase our reactivity
- Demonstrate to the local jurisdictions our ability to constantly challenge their partial / unlawful decisions
Upon Management Committee (MC) acceptation, Glencore DRC will administrate the tender on behalf of KCC and Mumi, but under KCC control:
Upon agreement of both Companies, a three (3) years contract will be signed separately by each Company with the successful bidder.

Legal Assistance

17-Nov-2022

410

20638

EW2 WOOD REFURBISHMENT

The wooden panels that are protecting the steel structure around the EW cells from acidic corrosion.
This scope of works details the steps the contractor must undertake to remove and replace the existing steel structure in wood from the EW cells. This project should take a maximum of five months until completion depending on the starting date.

Cleaning Services

17-Nov-2022

411

20649

EW3 FLOOR REPAIRS

Due to atmospheric corrosion sections of the carbon steel structures of columns supporting the cells, gratings and platforms at EW3 are severely corroded and in urgent need of repair and will be corrosion protected by Acid Proofing.
The acid proofing has been damaged over years and concrete of pump bases damaged with acid.
The severely corroded steel will be replaced, other will be corrosion protected and walkways and treads will be replaced with GRP grating.

Mining Maintenance

11-Nov-2022

412

20655

EW2 cathodes & anodes workshop construction

This scope of works describes the works required for the modification of existing floor for
Cathode & Anode maintenance workshop and drainage at the EW2 Plant at Luilu.
The contractor have to demolish existing slab to construct drain and pour concrete, the area to
pour the concrete is located in the red square at EW2, in figure above. The total area is
approximately 1600m2
.
The contractors scope is the following;
1. Supply all materials including but not limited to, cement, aggregate, reinforcement, joint material
etc.
2. Construct a reinforced concrete floor slab, including all thickenings, construction joints, drains,
sumps, foundation, and reinforced concrete cover.
3. Installation of all cast-in items as shown on drawings.
4. Concrete test at 7, 14 and 28 days as per SABS 1200, and provide results to KCC Representative.
5. All exposed concrete edges to have 25mm chamfers.
6. Cast new 30 MPa concrete to the required levels.
7. Allow curing of concrete for 7 days minimum
8. Provide saw-cut joints in floor slab within 24 hours of casting.

9. Housekeeping

Construction Services

 

413

20610

LICENCE FOR KM BOARD MEETINGS

LICENCE FOR KM BOARD MEETINGS

License

11-Nov-2022

414

20618

B4 rock breaker commissioning

B4 rock breaker commissioning

Equipment Maintenance

11-Nov-2022

415

20619

KTC Floatation audit

KTC Floatation audit

Consultancy service

11-Nov-2022

416

20622

Provision of Security services 001

Kamoto Copper Company (hereinafter called the “Company”) is requesting quotations from reputable security service providers (hereinafter-called the “Contractor”) with a local presence in the Lualaba Province of the DRC for the provision of security officers and supervisory/support personnel to carry out the following duties:
• Static Guarding
• Access Control
• Intervention Teams
• CCTV and/or Security Operations Control Monitoring
Services are to be carried out on Company premises in Kolwezi to guard and protect the Company’s assets and personnel and provide other related security services.

The Contractor shall provide fully trained and qualified personnel, as well as all equipment and materials necessary to carry out the required services properly and safely. This shall include all necessary Personal Protective Equipment.

Security Services

11-Nov-2022

417

20625

Drone Pilot Training

Drone Pilot Formation - OP
• Theoric course (Indivudal Syllabus + Powerpoint)
• Included :UAS Legislation; Flight Theory ; Meteorology ; Drone Technology ; Instruments ; Safety
• Individual Practice Flight course
• Individual Flight Exams
• Delivery of a Diploma
• 3 x 6 hours of Theory + 4 Hours of Individual practice flight
• 1 Hour Theoric Exam + 1 Hour of Individual Flight Exam

Drone Training

11-Nov-2022

418

20629

Pull 1300M of optical fiber

Pull 1300M of optical fiber

IT Services

11-Nov-2022

419

20582

Dashboard Development KOV & Mashamba Mining

Dashboard Development KOV & Mashamba Mining

Consulting Services

4-Nov-2022

420

20589

BOSCH LICENSE RENEWAL (DIAGNOSTIC TOOL)

BOSCH LICENSE RENEWAL (DIAGNOSTIC TOOL)

License

4-Nov-2022

421

20590

KTC process water and GSW repairs

Due to Luilu's inadequate pH control Serious sections of pipeline were extensively corroded by high acid pH water that passed through the KTC process water and GSW systems. Line failures have also caused multiple downtime, and there are significant dangers in the plant that, if not addressed, might result in major downtime. Currently, basic line repairs are being made, but technical pipe welding skills are severely lacking and occasionally result in more downtime and issues than the original issue. The purpose of this contract is to bring a skilled team to the site to work risks and issues on the GSW, process water, and also slurry lines in order to keep the plant running on these lines until the new stainless steel and GSW and process water lines are installed in the future. Slurry lines are also being addressed longer term in a separate project to install standardized ceramic lined pipe for all slurry lines. D5

Mining Services

4-Nov-2022

422

20597

EXTEND 710mm Line to KTC

EXTEND 710mm Line to KTC

Mining Services

4-Nov-2022

423

20604

KTC OPS and METALLURGY training support

KTC currently consists of a number of crushing, milling and flotation plants for various open pit and underground ore sources, ore sources treated include oxide, sulphide and high calcium ore. Opportunity exists to improve performance of the plant through training and mentoring of both the operational and metallurgy teams and also KTC supervisors.

Labor Hiring

4-Nov-2022

424

20530

KTC plant cleaning crew

The scope of work (SOW) under this Contract includes, but is not limited to the following:
The Contractor is required to provide qualified and experienced personnel, to be able to carry out general housekeeping and cleaning services in the KTC – Milling - Flotation - Tailings - Reagent and workshops sections.

Mining Services

4-Nov-2022

425

20586

KTC New Core Shed Additional Works

As part of the Geology mining to upgrade geology core storage and create shelter for mineralised core sample, the Geology management request additional works for gable end and ramps on their existing three sheds 20m wide on the proposed location as shown picture below.

Construction Services

4-Nov-2022

426

20572

EDP AND LO BUSINESS CONSUTLANTS

TO FURTHER GROW EDPs AND LOs AT KCC (THE ‘COMPANY’), A PREFERRED CONSULTANT WILL BE ENGAGED TO WORK CLOSELY WITH THESE EDP AND LO SUPPLIERS TO ENSURE THAT THE DEVELOPMENT OF THEIR BUSINESSES IS ACCELLERATED.

 

THE CONSULTING COMPANY WILL WORK WITH THESE SUPPLIERS TO ENSURE DELIVERY TO KCC IS OF THE HIGHEST STANDARD AND THAT THEIR BUSINESSES GROWTH MATRICES AND TARGETS ARE MET AND EXCEEDED.

Consulting Services

27-Oct-2022

427

20575

Occupational Hygiene Monitoring

The Kamoto Copper Company (KCC) is a world class, responsible mining business in the Democratic Republic of Congo. The KCC mine site complex is located adjacent to Kolwezi Town in Lualaba Province, southern DRC. Coordinates 10° 43' 15" S 25° 21' 58" E

 

We produce copper and are the world’s single largest producer of cobalt – commodities that are advancing everyday life by underpinning the energy and mobility transformation and enabling the transition to a low carbon economy.

Located in Kolwezi, in the province of Lualaba, our portfolio of assets includes two open pit mines (KOV and Mashamba East), one underground mine (KTO), the Kamoto concentrator, and the Luilu refinery and supporting facilities and infrastructure. Onsite employment is currently approximately 10,000 persons, of which nearly 50 percent are contractors. The business is jointly owned by Glencore (75%), Gécamines (20%) and SIMCO 5%).

Consulting Services

27-Oct-2022

428

20578

Calibration of fuel flow meters

1.         Contractor shall provide an estimate to one (1) Certified Master Test Equipment and one (1) Verification Officer to use KCC provided calibration equipment to verify KCC flow meters in their DRC operations and to prepare and issue a report and certificates as required.

 

2.         Method

 

2.1.      All work will be carried out in accordance with the current API MPMS (Manual of Petroleum Measurement Standards), Chapters 4, 5 & 12.

2.2.      Contractor will apply the relevant internal procedure for the work scope; copy procedures or an ITP (Inspection and Test Plan) must be submitted.

2.3.      A risk assessment will be carried out prior to the commencement of the work.

2.4.      The calibration will be traceable to credited bureau of Standards.

 

3.         Resources

 

Contractor will provide appropriately calibrated thermometers

 

4.         Personnel

 

4.1.      Contractor must have experienced CT’s (Calibration Technicians) currently providing this service in other Oil & Gas sites around the world.

4.2.      Appropriately, experienced technicians will be allocated the task to perform the work scope.

4.3.      Technicians will carry a valid Trade Metrology Verification officer qualification. Copies of certifications must be presented on the submission

4.4.      The technician assigned to conduct the calibration shall abide by the KCC onsite induction and assessment on safety procedures. A briefing shall be carried out prior to the commencement of the calibration.

 

5.         Reporting

 

5.1.      A report will be issued providing the detail required as stated in MPMS determining the volume of the equipment being tested.

5.2.      Authorized time sheets for each day worked will be attached to the invoice.

Training service

27-Oct-2022

429

20580

PBRS Blu Annual Subscription

PBRS Blu Annual Subscription

License

27-Oct-2022

430

20581

Software provider that has been delivered these licenses

Software provider that has been delivered these licenses

License

27-Oct-2022

431

20585

HG DBC AKS Installation

The Scope of Work to be performed shall include the installation of the AKS Liner

Mining Services

27-Oct-2022

432

20583

New Sulphur Warehouse - Fire Suppression

The Supply Chain Management (SCM) raised the need to build a Sulphur storage Warehouse due the increase in the reagent demand to improve their internal product management.
The SCM department did an evaluation of the storage size they need and proposed 5,300 m2 to be built. To protect reagent that will be stored in the warehouse, a fire system is required.
The project office was approached the SCM to do the design a development and construction management of the of the warehouse. This document will establish the engineering and construction of the fire system scope of work.

Construction Services

27-Oct-2022

433

20557

Trainers Excel Microsoft Certification

Trainers Excel Microsoft Certification

Training

21-Oct-2022

434

20558

Translation of material 720 pages

Translation of material 720 pages

Translator service

21-Oct-2022

435

20561

HR and Generic Management Development

HR and Generic Management Development

Training service

21-Oct-2022

436

20564

FAMER'S MARKET EXHIBITION 9th EDITION

Dans le but de promouvoir les associations et coopératives, les entreprises KAMOTO COPPER COMPANY et MUTANDA MINING organisent la 9ème Edition du marché d’exposition. Offre du marché : - MARKETING DES ASSOCIATIONS - VENTES DES PRODUITS FRAIS A BON PRIX - ANIMATION AVEC DES ESPACES DE GRILLADES Pour un bon déroulement l’évènement est prêt d’accueillir 2000 visiteurs,120 exposants et autant d’animaux

Organisation d'une ceremonie

21-Oct-2022

437

20523

Transportation of IX Materials

Transportation of IX Materials

Transportation services

21-Oct-2022

438

20546

KTC PLANT CAMERA INSTALLATION

 Pull Fiber optic cable and Splice (Length 10 000M)
- To Pull UTP and doing connectors (Length 10 000M)
- TO Install 60 Junction box and mount 60 cameras.
- TO Install Cabinet Enclosure Mounting and Installing 20 Cabinets
- To manufacture and fix supports for cabinet Enclosure and cameras
- To install the cable trays.
- To pull electrical power cable from main IPDB to all cabinet enclosure.C10

IT Services

21-Oct-2022

439

20557

Trainers Excel Microsoft Certification

Trainers Excel Microsoft Certification

Training Services

21-Oct-2022

440

20542

Service of 2 Unit DSA 5000 M DENSITY AND ACID

Service of 2 Unit DSA 5000 M DENSITY AND ACID

Mining Maintenance

21-Oct-2022

441

20570

Independent Copper and Cobalt Pricing

Independent Copper and Cobalt Pricing

License

21-Oct-2022

442

20571

LEACH pH AND ORP CONTROL IMPROVEMENT

LEACH pH AND ORP CONTROL IMPROVEMENT

Specialized service

21-Oct-2022

443

20538

KTO Pond 2 & Dima Pond Repairs

This Scope of Services under this Contract include, but not limited to the following:

• Demolish some existing buried reinforced concrete foundations, bundwall and drains.
• Excavations and disposal of acid contaminated gravel material as instructed by KCC Engineer on site.
• Bulk earthworks including excavation, disposal, importing, backfilling and compaction of gravel material.
• Build a new concrete wall.
• The contractor may be required to demolish some existing buried reinforced concrete foundations, bundwall and drains.
• Excavations and disposal of acid contaminated gravel material as instructed by KCC Engineer on site.

Civil work

21-Oct-2022

444

20519

Rental of fuel bowser

1. Fuel bowser will ensure bulk distribution of fuel on KCC site as per Fuel Management team instructions.

2. Method

2.1. All work will be carried out in accordance with the KCC Fuel distribution procedures and standards.
2.2. A vehicle assessment will be carried out prior to the commencement of the work.
2.3. Bowser must be fitted with a meter connected to the distribution system

3. Resources

Contractor will provide a fuel bowser in good operating condition
 
4. Personnel

4.1. Contractor will provide a driver to operate the bowser.
4.2. Driver must have a valid driving license.
4.3. The driver assigned to the bowser shall abide by the KCC onsite induction and assessment on safety procedures. A briefing shall be carried out prior to the commencement of the work.

5. Reporting

5.1. Authorized time sheets for each day worked will be attached to the invoice.

6. Mobilization of bowser
6.1. To be agreed between Contractor and KCC according to the most suitable schedule for both parties.

Rental of equipment

12-Oct-2022

445

20525

English Courses

English Courses

Training service

12-Oct-2022

446

20526

Train the trainers on MacLean Equipment

Train the trainers on MacLean Equipment

Training service

12-Oct-2022

447

20529

LIMS geology interface and Support 2023

Configuration Assistance on new scope for
Cobalt Hydroxide Assay Comparison

Specialise service

12-Oct-2022

448

20531

ISO 14001 Lead Implementor

ISO 14001 Lead Implementor

Training service

12-Oct-2022

449

20533

Prokon License renewal

Prokon License renewal

License

12-Oct-2022

450

20535

KCC - Minalyzer & Leapfrog SSIS Packages

Minalyzer data storage - development of a SSIS package to store the csv output from the Minalyzer XRF machine in the Fusion database.
 Leapfrog STRAT interpretations - development of a SSIS package to store the re-interpretations of STRAT carried out in Leapfrog.
These re-interpretations (supplied in csv format) will be stored in a separate/new STRAT table in Fusion, thus maintaining the original STRAT interpretations done by the geologists while logging the core.

Mining Services

12-Oct-2022

451

20536

Independent Copper and Cobalt Pricing

Independent Copper and Cobalt Pricing

Consultance service

12-Oct-2022

452

20539

Trial MineProtect Collision Avoid Syst

Trial MineProtect Collision Avoid Syst

Consultance service

12-Oct-2022

453

20540

Sulphuric Acid Plant Technical Assistance

To supply Sulphuric Acid Plant Technical Assistance during plant shutdown on dates to be planned
and agreed on. Available equipment will be inspected during the stoppage and points of concern will
be raised as they occur. A written Report with findings and recommendations will be submitted asap
after completion.

Mining Maintenance

12-Oct-2022

454

20541

NetApp License and Support

NetApp License and Support

License

12-Oct-2022

455

20543

OEM to calibrate all KROHNE flowmeters

OEM to calibrate all KROHNE flowmeters

Specialise service

12-Oct-2022

456

20544

HMA Installation and Support of Geotechn

The HMA team will be involved in installing subsurface instrumentation, ensuring that the systems are operational and training of the KCC geotechnical team to be able to install future geotechnical monitoring tools. These instruments will be installed on completion of each geotechnically planned borehole. The KCC teams will then receive on-site and on-the-job training so that the team builds and develops their skillset.

Mining Maintenance

12-Oct-2022

457

20550

Use of Fluke power quality 434-435

Use of Fluke power quality 434-435

Training service

12-Oct-2022

458

20456

KCC Forklift Maintenance Support Service

The Contractor is required to provide fully qualified and experienced personnel, with backgrounds in Mechanical and Electrical expertise, for the different forklift manufacturers, JCB, Toyota, Manitou, Kemach. The focus will be to improve the performance and availability of the forklift fleet. They will mentor/coach the KCC technicians to improve their understanding and capability in the maintenance and technical arena. They will also provide the diagnostic tool, in order to make a contribution to these activities by the Service Provider, resulting in an uplifting of performances across the Forklifts:
Labour required:
- 3 x Mechanical skills
- 1 x Electrical skill

Maintenance des equipement

12-Oct-2022

459

20487

CSCA - Certified Supply Chain Analyst

CSCA - Certified Supply Chain Analyst

Training

12-Oct-2022

460

20489

CSCM - Certified Supply Chain Manager

CSCM - Certified Supply Chain Manager

Training

12-Oct-2022

461

20490

Easylogcloud Professional access

Inspection et calibrage des équipements

Maintenance des equipement

12-Oct-2022

462

20511

EW Pilot Plant Rental For Acid Mist Test

There’s a shortage of the FC1100 product on the market because its production has been stopped for a safety concern; so urgently an alternative product should be considered in the EW plant as this is a health environmental, and safety concern due to acid mists release during the copper deposition.

 

An alternative sample product was received for plant trial but due to the fact that KCC has not facilities and doesn’t have guaranties on process, production and safety related using the product, a rental pilot plant appears a quick solution to test the new product before moving to a full plant implementation.

 

The scope of work aimed to rent those facilities for a period of 2 month on site.

Mining Maintenance

4-Oct-2022

463

20514

KTC substation AirCon MTN services

It is intended that this scope will provide details for maintenance to and installations of replacement and or additional air conditioning units in the KTC plant substations and MCC’s but not only limited to these specific areas (however, specifically excluding Underground work). The contract will be valid for twelve (12) months.

The bulk of the air conditioner units consist of the wall mount split type and floor standing type units.

 

A supervisor must also be appointed for this contract whose responsibilities will include but not limited to, planning schedules for services, cleaning, repairs and or replacements of air conditioning units.

 

All personnel working on this project shall be qualified and experienced air conditioning technicians with recognized qualifications and at least some multi-skilled electricians with recognized qualifications. Electrical persons will also perform basic electrical isolations and terminations in isolator switches and connections onto air conditioning units. They will also perform locking out at distribution boards as per KCC standard

Mining Maintenance

4-Oct-2022

464

20516

Specialist services required for Feasibity

Assistance with preparation and review of Feasibility Study Submission

Specialist services

4-Oct-2022

465

20517

Treesize Professional utility

Treesize Professional utility

License service

4-Oct-2022

466

20518

LUILU DRYERS SEWAGE CHAMBER CONSTRUCTION

The project consists of constructing a sewage chamber of 8m x 4m for the new container ablution at the dryer plant with setting out concrete plinths as bases for container ablutions.


Contractor must supply all materials, equipments and personnel for the execution of this project and include all costs related to the project in the rates.


Contractor must include lead-time for materials brought from South Africa, Zambia, etc.

Mining Maintenance

4-Oct-2022

467

20521

Luilu Cobalt storage shed_E & I

In order to complete the construction of the luilu Cobalt storage shed, it was decided to do the electrical installation in order to energize the new shed in term of lighting. The present scope describe all electrical works, which shall be done in order to energize and control the new installation.

Mining Maintenance

4-Oct-2022

468

20522

IT contractor

IT contractor

Labor hire

4-Oct-2022

469

20523

Transportation of IX Materials

Transportation of IX Materials

Transport service

4-Oct-2022

470

20525

English Courses

English Courses

Training

4-Oct-2022

471

20531

ISO 14001 Lead Implementor

ISO 14001 Lead Implementor

Training

4-Oct-2022

472

20491

Luilu Felco WH Extension -Steel Erection

The SCM department did an evaluation of the storage size they need and proposed 980 m2 to be built (distributed as follows: 36mx24m in front of the building either on the west side according to the attached drawings and a 3.6m canopy at the rear facade to prevent the infiltration of rainwater).

 

The project office was approached the SCM to do the design a development and construction management of the warehouse. This document will establish the engineering and construction scope of work and general standard project development practices.

Mining Maintenance

29-Sep-2022

473

20495

NEUTRALISATION REAGENT STUDY

Katanga Copper Company (KCC), part of Glencore Copper makes use of Lime to neutralise solutions and slurries at various points in its processing circuits. Lime is one of the more expensive reagents in use at KCC.

 

Due to the large neutralisation reagent consumption demand, quality of delivered lime, the associated prices of these reagents, and often lack of availability of these reagents, KCC requires an investigation into options which may alleviate the strain on supply.


Some of the supply options therefore may include various optimisation initiatives, finding alternative supply sources, alternative/larger reagent make-up circuits or process changes to existing circuits. This study specifically focuses on generating options, and costing them, for reagent make-up solutions.

Consulting service

29-Sep-2022

474

20501

NRP Study Old Lime Ball Mill Cleaning

To sustain the production while moving from oxide concentrate leach operation to Whole ore leach operation, a second lime slaking plant was necessary to cover the entire lime demand. Therefore, it was observed +/- 25% of lime grit generation due to lime quality, this impacting on high consumption of lime and production cost.


An alternative solution has been identified to recover the Lime lost via grit, such as refurbish and operate old GCM lime mill facility.  this option will treat the grit by mill slaking and feed the neutralization tanks, the benefit expect is the lime consumption rate that will be reduce, reduce losses of lime, and mitigate the grit management issues by its reconditioning.


The propose of this scope consist in the cleaning of the old Gecamines installation to allow an easy access to equipment and assess the equipment conditions.

Cleaning service

29-Sep-2022

475

20502

FERROUS SULFATE SHED AND SODA ASH SHED

The project consists of constructing shed and slab for the ferrous sulfate area for the iron sulphate preparation and a soda ash area needs to be covered with concrete slab as well. The same project includes repair of sumps for ferrous sulfate preparation.


Construction material will be provided by Contractor but sumps repair material will be provided by KCC.


Contractor must include lead-time for materials and rates must include supply and installation for all materials.

Construction

29-Sep-2022

476

20504

KTC - Main Entrance Road Repairs

This scope of works describes the civil works required for heavy vehicle road to KTC and stormwater drainage as part of the KTC entrance road.

The KTC entrance road is shown in the blue line in figure 1 above. The road widths are 6m wide for minor roads and 10m width for main access roads. Typical road cross-section is cambered with drains on both side as shown in figure 2.
Total length of roads approximately 0.8 kilometers.

Mining Maintenance

29-Sep-2022

477

20505

Open Pit Dust Suppression

Before the Supplier treats a new road, the segment of the road to be treated must be accepted in Writing by the Service Provider, project leader, construction foreman and surveyor. Subject to confirmed product compatibility testing with identified site material and water prior to commencement of the project.


The scope of work is summarized below:

Global Network Broker

§ This proposal is based on the existing area being stabilized based on a 1-month trial. The service in this proposal includes the supply of product to Kamoto Copper Mine in DRC, the establishment of site when required and the treatment of the existing haul roads / roads / driving surface by onsite personal and dedicated equipment.

§ Dust-A-Side is a bitumen emulsion which is a binder and an excellent dust suppression application. Binding occurs during spraying which does not leach out and over time a smooth sealed driving surface is obtained which can be graded and maintained in terms of sweeping and maintenance spray on applications. Dust-A-Side serves as an “All weather road”. If adhered to wet road conditions practices, production can continue without stoppages during rain.

Mining Maintenance

29-Sep-2022

478

20498

Job Evaluation Tender

KCC has a headcount of 6,233 direct hires, which translates to approximately x unique roles.
To date there has not been any formal and transparent Job Analysis and Evaluation conducted based on industry-recognized methodology (i.e., Paterson, Hay, Towers Watson, Mercer, etc.) to understand the existing x unique roles and consolidate them into relevant job families and a defendable hierarchy.


The lack of formal Job Analysis and Evaluation has resulted in ongoing requests for pay grade adjustments, which results in conflict and difficult working interpersonal relationships. In addition, there are incessant unjustified changes to job designations and departmental structures to motivate promotions, even if there have not been material changes to the nature of the job/role (accountabilities).


The lack of discipline in the promotion process has resulted in situations where employees are placed in non-recognized or approved roles, or unjustified jumps in classification which over the years result into employee claims and disputes (continued Legacy).


Above all, existing job Classification in the Collective Agreement is not supported by any methodology and guidance to differentiate between the levels (e.g., difference between Basic skilled jobs, Semi-skilled, Skilled, Team Leader, Supervisor and Coordinator), coupled with Union demands for compensation and benefits equity – employees doing the same jobs to be paid equally (Art. 86 of the Labor Law).

Labor hire

29-Sep-2022

479

20499

Octoplant software

Octoplant software

Software license

29-Sep-2022

480

20407

 

DRC Customs Services (import & Export)

Clearing services on import & export for Kamoto Copper Company SA.

Logistics

16-Sep-2022

481

20410

Stockpile sheds and B3 Equipments rental

The Contractor is required to provide fully qualified and experienced operators to load and feed feeders in KTC stockpile sheds or scats crusher at B3 with a fully functional excavator.

Scope of work
1. Excavator type 300 or 350 or equivalent to be used in loading and feeding feeders in KTC stockpile sheds or B3 scats crusher area.
2. Equipment will be required to travel and operate between KTC stockpile sheds and B3 scats crusher as required and instructed by end user.

Equipment rental

12-Sep-2022

482

20427

ELECTRICAL WS REHAB & GROUND CRACKS REPA

• Earth works ( ground cracks fixing ) :
- To excavate: 4.5 meters deep   , 8 meters large And 5 meters wide   120 M3.
- To push, to load and to transport the excavated products
- To fill the laterite ground and stones  in the excavated area ( laterite and stones area defined by KCC)
- To compact and to level the laterite ground according to the specifications and the coordinates
- To survey and to test the compaction ( >250 psi )
 
• Civil jobs : 1 Cracks and drainage :
                     -    Old wall demolishing and rebuilding : 18 x 1 m ( on top )
                      -    materials load and transport : 4 M3

                          1.1  Drainage  ( bottom )
- To improve the drainage capacity, building the wall on top of the drain : 45 x 0.6 m ( bottom )

1.2  Cracks on the floor
- Testing the cracks deep
- Excavation according to the crack deep: 8 m large and 0.8 m wide
- Filling ground and compaction
- Pouring concrete

2 Electrical WS

2.1 Store 1
- Store emptying ( electrical equipment and steel shelfs )
- Steel siding dismounting and transport
- Face Bricks wall building, plastering and painting:36 x 2.6 m
- Inside wall plastering and painting:19 x 3.6 m and 9.2 x 3.6 m
- Floor painting:  19 x 4.6 m

Civil work

12-Sep-2022

483

20428

FIXED PLANT OFFICES REHAB

Description of the Services (with breakdown and/or program of each step to be performed):
• Supply 800 M2 of IBR 686 sheets and accessories
• Dismount all old sheets
• Install new IBR 686 sheets
• Dismount 300 M2 of old ceiling and supports
• Supply 300 M2 of new Rhino board gypsum ceiling and supports
• Install new ceiling
• Paint 300 M2 of new ceiling

 

12-Sep-2022

484

20437

High GAC Concept Study

The broader project objective is to determine the optimum flow sheet in order to process High GAC ore. LoA throughputs and Ca grades are shown below:

• 2.5Mtpa of high GAC ore at 5-6% Ca in 2024.
• 6Mtpa of high GAC ore at 5-6% Ca in 2028 onwards. This will require an expansion of the High GAC circuit.

The above throughput requirements and Ca content is based on the latest 2023 LOA model which will be provided to the engineering company performing the concept study. KCC is currently segregating mined ore based on GAC content with all primary ore with a GAC content of larger than 80 kg/t being classified as high GAC ore. Low GAC ore is processed through the standard KTC Open Pit flow sheet as shown in figure 1.

The optimum flow sheet should take capital expenditure, operational expenditure, SHEQ risks, revenue generation, implementation schedule and ease of operation into account

Mining operation

12-Sep-2022

485

20439

RUBBER LINE OVERFLOW BOXES LEACH TANKS

Provide skilled contractor Labor, required tools and material (Rubber, SC200 glue, Solvent, Metal primer, Chem cure, Brushes, P16 discs, trimming blades, Tools and equipment) for to do Rubber liner the seven  leach tank overflow boxes as per Tank shut opportunity .

 

 

486

20443

DISSOLVE GAS ANALYSIS FOR MAIN&CRITICAL

The service will consist on oil sampling with required tools and performing DGA (Dissolve Gas Analysis) test by certified devices and providing a complete report with recommendation. The contract will be on annual basis with possibility of call out according to the results obtained or in the event of a breakdown occurring on any KCC HV or MV transformer or during commissioning a new HV or MV transformer.

Gas analysis

12-Sep-2022

487

20446

Specialised Acid Plant Total Shut  Labor

Contract for a Service Engineering Company to Provide and Supervise Skilled Experienced Labour in the Executing of Tasks as Planned on the Sulphuric Acid Plant Gantt chart using the required QA/QC standard as per Plan. Provide tools and equipment to be utilized by The Skilled Artisans.

Labor hire

12-Sep-2022

488

20281

SKM BUCKETS, BLADES & DUMP TRAYS REPAIR

• DUMP TRAYS maintenance REPAIR, Repair Welding and line boring for 793D, 777E, 777D, 745 and others UG Trucks

• BLADES REPAIR, Repair Welding and Line boring for Dozers & Graders

• BUCKETS REPAIRS, Welding, and line boring for shovels, Loaders & Excavators

Maintenance Services

23-08-22

489

20345

ACTIVITY OF KCC CENTRAL NURSERY

Kamoto Copper Company S.A. « KCC », recherche des partenaires intéressés à participer à l'appel d’offre afin d’aider comme main d’œuvre pour la mise en place d’une pépinière de 100000 plantules d’espèces miombo.

 

3 – Description des services

3.1 Remplissage des terres noires dans les sachets en respectant les techniques spécifiques apparentées :

(i) Préparation du terrain

(ii) Préparation des sachets

(iii) Préparation de la terre noire

(iv) Remplissage de sachets

(v) Arrosage et suivi de la croissance

(vi) Préparation des plantules et graines avant semis

3.2 (i) Le semis des graines et plantules

 

Ce projet consiste à :

1. Nettoyage du Site

2. Le semis des graines et plantules

3. Entretien des arbres plantés

4. Classer dans l’ombrière

Environment Maintenance

23-08-22

490

20346

Supply black soil

Provide 90 cubic meters of Black soil to KCC as part of the project to install the central Nursery at KCC Under the DRC Mining Code and regulation in view of the vison of 1Billion trees by 2030 and regarding the purposes of the Strasbourg Cop 26. The Nursery will provide 100000 native Miombo seedling of wood and fruit trees which will allow us to reforest 50 to 60 ha depending on the spacing chosen. According to our rehabilitation Management plan (RMP) the context of KCC the rehabilitation plan is progressive associated with enriching the degraded green spaces at KCC with trees produced in the central KCC Nursery and providing the neighboring community with the ability to create the home gardens that will benefit from its ecosystem, services.

Environment Maintenance

23-08-22

491

20347

Environmental annual report 2021-2022

The KCC mine site is located adjacent to Kolwezi Town in Lualaba Province, southern Democratic Republic of Congo (DRC). The complex includes underground and open pit mining, ore concentrating facilities, a refinery, and supporting facilities and infrastructure. Mining operations have been undertaken at this site by various operators since 1943.

The DRC mining regulations (Article 458) set out that every year, the company must submit an Environmental annual report of their activity.

 

Article 458: The annual report on the performance of exploitation, mitigation and rehabilitation works

Within one hundred days of the anniversary date of the approval of the Environmental and Social Impact Study and the Environmental and Social Management Plan, the holder is required to submit a report each year to the Congolese Agency for Environment, the National Promotion and Social Service Fund and the Directorate for the Protection of the Mining Environment.

 

This report must briefly describe:

• the operating works carried out and their impact on the environment.

• the mitigation and rehabilitation work that have been carried; out.

• the progress of mitigation and rehabilitation measures compared to those provided for in the approved Environmental and Social Management Plan.

• costs incurred in connection with the implementation of these mitigation and rehabilitation works.

• the progress and results of the implementation of the sustainable development plan and the specifications.

Environment Report

23-08-22

492

20334

CM6 Gearbox Change

Site setup and tool tagging

• Conduct Risk Assessment with all crew members

• Balance mill

• Lock Out and Isolation

• Remove guards

• De-couple couplings

• Remove piping

• Remove HD bolts

• Lift and remove gearbox

• Clean area

• Inspect & Prepare new gearbox/couplings

• Install new gearbox & pre-align

• Connect piping

• Install HD Bolts

• Final alignment of drive train

• Torque bolts

• Install all guards

• Housekeeping

Maintenance Services

23-08-22

493

20335

CUMMINS ENGINE MAINTENANCE SUPPORT

• Country sourcing protocols that must be adhered to: Manpower must be recruited first locally

 

• Local Sourcing Opportunities: Only general parts can be supplied locally

 

• Regional Sourcing Opportunities: Would depend to needs after expertise

 

Need an OEM support to perform Cummins engine maintenance. The OEM will assist in expertise on all maintenance activities of the fleet (25 engines): preventive and corrective maintenance.

 

This Scope of Services under this Contract include, but not limited to the following:

 

1. Assist the Corporation with troubleshooting, carry out diagnostics and fault codes analysis

2. Assist and guide KCC maintenance team on valve lash adjustment

3. Component change-out follow-up: support to component change-out, commission and draw up the service report of commissioning as specified under “Component installation check list’’ to be provided by the Contractor

4. Review oil analysis reports provided by the Corporation

5. Inspection and recommendation of the repair and parts requirement

6. Recommendation of utilization of specific tools

Maintenance Services

23-08-22

494

20338

Integrate all REM615 relays into Scada

The system faults on the Relays RM615 or breakers (MCC) of the function blocks which control the Mills (CM1, CM2, CM3, CM 4, CM 5, CM6, CM7, BM1, BM2, BM3, BM5, BM6 and BM7). It is not properly map, not provide more details with profibus and the Alarms are limited; the contractor will install S71500, Modbus facilities, program function blocks integrate in the existing SCADA system and commissioning.

 

. Major job:

• Install and program the S7 1500 PLC

o Install the Engineering Station with the TIA portal software

o Examine Existing profibus infrastructure

o Install and setup the Ethernet switches

o Remapping of RM615 information according to information

o Program function block which supports Modbus and link with S7 1500

o Adding functionality to cater for Modbus

o Scada Faceplate redesign to cater for Modbus

 

• S7 1500 PLC intercom with S7 1500

o Setup the PLC intercom

o Integrate S7 1500 PLC into the existing SCADA

o Write program to allow for new Data Transfer

o Remapping of RM615 information according to Modbus and PLC S7 1500 

o Redesign of RM615 Block

o Adding functionality to cater for more First Ups

o Scada Faceplate redesign to cater for more First-ups Testing

Mining Services

23-08-22

495

20363

GESTION DES PLAINTES REQUETES

Les termes de références annonçant la demande de recrutement d’un facilitateur de la formation en la gestion des plaintes, requêtes, enjeux et engagements communautaires.

Les consultants ayant la charge de conduire cette formation se fixe comme objectif globale de la consultance qui se résume en ces termes « les Capacités des staff Kamoto Copper Company SA sont renforcées en matière de gestion des plaintes, requêtes, enjeux et engagements communautaires ».

Le mécanisme de gestion des plaintes vise à gérer les risques, diffuser les informations sur les possibilités de recours, permettre l’alerte précoce et augmenter la transparence, la responsabilisation des acteurs du projet et l’appropriation des activités du projet par les citoyens

Le MGP vise à fournir aux personnes et communautés qui se sentent lésées par les activités du l’entreprise, des possibilités accessibles, rapides, efficaces et culturellement adaptées pour soumettre leurs plaintes et préoccupations afférentes à l’entreprise.

 

De manière spécifique il est attendu des participants à la formation qu’ils soient en mesure de :

● Présenter la démarche de mise en place d’un mécanisme de gestion des plaintes dans une entreprise.

● Identifier les principes, outils, contraintes de conception d’un mécanisme de gestion de plainte.

● De connaitre le processus de l’Engagement Communautaire

Training Service

23-08-22

496

20367

SCRUM MASTER CERTIFICATION

Scrum master training

IT Training

23-08-22

497

20368

Windows 10 certification

Windows 10 certification

IT Training

23-08-22

498

20326

Calcine analysis

Scope of work will comprise the following:

1. Particle size distribution

2. Mineralogy: size by size characterization must cover all minerals detectable in each fraction size

3. Assays: size by size full analytical assays

Mining Services

16-08-22

499

20340

FELCO WH EXTENSION CIVIL AND EARTHWORKS

This Scope of Services under this Contract include, but not limited to the following:

• Earthworks for the access road included excavation, backfilling and compaction

• Construction of reinforced concrete foundations and anchorage of holding down bolts, masonry boundary walls and road access and drains

• The contractor will be required to dismantle the existing old steel structure not used anymore on site and to demolish an existing reinforced concrete wall and remove any other materials that can be found site.

Mining Maintenance

16-08-22

500

20344

KCC Material property and UCS test

Test work will be carried out on the three ores from the KTO mine to determine the cause of retardation of the backfill material and provide and optimum blend to achieve the minimum required strength for the backfill operations. 

Consultancy Services

16-08-22

501

19389

Maintenance et calibrage d’équipement

de médecine du travail

Assurer la maintenance et l’étalonnage annuel des équipements de tests suivants :

-   4 visio-testeurs Titmus, fabriqués par Titmus LCC ;

-   7 audiomètres Tremetrics, fabriqués par Maico Diagnostics GmbH ;

-   3 spiromètre EasyOne-PC fabriqué par NDD Medizintechnik AG ;

-   6 cabines d’audiométrie AX1 fabriquées par Propanels et Amtronix ;

-   1 logiciel AMS élaboré par Amtronix ;

-   3 seringues d’étalonnage de 3 litres fabriquée par Amtronix.

Les services doivent être accomplis conformément aux spécifications et standards des fabricants.

Maintenance des equipement

10-Aug-22

502

19633

Services de maintenance d’équipement

radiologiques

Faire la maintenance annuelle d’unités radiologiques Control-X Z-Motion fabriquées par Control X Medical Ltd.

 

Les services doivent être accomplis conformément aux spécifications et standards du fabricant.

Maintenance des equipement

10-Aug-22

503

20132

Services de maintenance préventive et

calibrage d’équipements de laboratoire

Assurer la maintenance et le calibrage annuel d’équipements de test en laboratoire de marque Applied Biosystems et fabriqués par Thermo Fisher Scientific, Life Sciences Solution Group (réfrigérateurs/congélateurs basse températures, une centrifugeuse, une station de travail pour analyse microbiologique).

Maintenance des equipement

10-Aug-22

504

20323

DEFECTIVE COMPONENT STAGING AREA

 This works under this Contract include, but not limited to the following:

 

• Concrete demolition & scabbling where required

• Site Setup & Mobilisation

• Restricted Excavations.

• Compaction.

• Formwork.

• Reinforcement.

• Concrete.

• Steelworks

• Finishing Works.

• Housekeeping.

Mining Maintenance

10-Aug-22

505

20225

Warehouse Signage Fitment

• Fit new signage to all warehouse buildings at KCC mine (32 signs in total)

• Signage Size; 500mm x 1,000mm

• Pre-drilled 4No x 6mm holes on each corner - 5mm from sides; 2 x 6mm holes in center of sign on the long side

• Different methods of fixing will be needed, as per each building’s requirement (to be advised and agreed upon during site inspection)

• The Area Supervisor will confirm the final position.

Mining Maintenance

10-Aug-22

506

20329

Cisco ISE Support

Cisco ISE Support

IT Services

10-Aug-22

507

20331

Autocad - License renewal

Autocad - License renewal

IT License

10-Aug-22

508

20252

Formation en médecine au travail

Formation des personnels de santé Watu Wetu SAS en en spirométrie, audiométrie et dépistage des troubles de la vision.

  • Formation de haut niveau, théorique et pratique à l’attention des personnels de santé de notre hôpital.
  • Formation en présentiel à Kolwezi, province du Lualaba.
  • 20 étudiants qui peuvent être divisés en 2 groupes.
  • Cycle de formation court en spirométrie (50 heures), audiométrie (50 heures) et dépistage des troubles de la vision (40 heures).
  • Formateurs experts en la matière et aptes à dispenser des formations aux standards internationaux.
  • Supports de formation sérieux et actualisés, rédigés spécifiquement pour apprentissage par des professionnels de santé (manuels, vidéos, supports divers).

Services de formation

10 août 2022

509

20081

Curative Maintenance of Mini Vidas equipment

Curative Maintenance of Mini Vidas equipement(Lab equipment)

Equipment Maintenance

10-Aug-22

510

20319

Training of Trainers on the Simulators at Open Pit 

Mine Operator Trainers to be initiated on the use of the simulator

Training services

4-Aug-22

511

20321

Security Technical

1  Painting of the SOC

2. Installation of new Flooring

3. Installation of new Lighting

4. Installation of the wireways for electrical and network cables

5. Installation and termination of the Cabling required

a. Electrical cabling

b. Networking cabling

6. Installation of the Plugs/Adaptors

7. Setup of furniture

8. Mounting and configuration of the monitors

9. Installation and setup of workstations

10. Testing of workstations and networks

Security services

4-Aug-22

512

20322

ITIL 4 Foundation

The course is designed as an introduction to ITIL 4 and enables you to understand a new way to look at IT Service Management through a Service Value System (SVS).

Training services

4-Aug-22

513

20261

EXTEND 710mm HDPE Line to KTC

This Scope of Services under this Contract includes the following:

• Contractor must provide all resources including equipment and personnel to carry out  this contract.

• Collect the pipe material from the laydown area and place along the pipeline route.

• Butt-weld the pipes to ensure a continuously joined pipe to KTC. A number of flanges will be installed along the way to cater for road-crossings, etc. The pipe-line is approximately 3,100 m long, but a final survey of the line will determine the final quantity.

• Disconnect the pipe for Lake Luilu at the T-Piece tie in and join it to the new line.

• Pressure test the line for leaks.

Mining Maintenance

13-Jul-22

514

20248

Cleaning of KCC diesel fuel tanks

1. Contractor shall perform cleaning of all diesel Bulk tanks used by KCC for operations and provide the reports as required.

 

2. Method

2.1. Contractor to perform man entry tank pressure cleaning for bulk 750m3 tanks and filtration, vent purge and de-gassing for the smaller tanks.

2.2. Contractor will apply the relevant procedure for the work scope.

2.3. A risk assessment will be carried out prior to the commencement of the work.

 

3. Resources

Contractor will provide appropriate cleaning equipment and tools.

4. Personnel

4.1. Contractor must produce proof of having provided this service in other fuel operations, companies or sites around the world.

4.2. Appropriate experienced technicians will be allocated the task to perform the work scope.

4.3. The technician assigned to conduct the cleaning shall abide by the KCC onsite induction and assessment on safety procedures. A briefing shall be carried out prior to the commencement of the calibration.

5. Reporting

5.1. A report will be issued providing the details required on the equipment being cleaned.

5.2. Authorized time sheets for each day worked will be attached to the invoice.

6. Mobilization of Contractor

6.1. To be agreed between Contractor and KCC according to the most suitable schedule for both parties.

Mining Maintenance

13-Jul-22

515

20254

Lime Plant Grits Handling

1. Provide 1 loaders, 1 dump truck and their specific operators for grit loading and transportation (300TPD, then 10-15 courses per day)

2. Load lime grit, using front end loaders, in tripper trucks

3. Transport lime grit (a portion of it can be stored in the area close to lime) to neutralization (distance from lime plant to neutralization is more or less 1km or to Mupine 10 km)

4. Repulp lime grit in neutralization bund area using high pressure water (6 operators will allocated, 2 per shift)

5. Provide 2 spotters (at lime plant, waste storage and neutralization area), with one supervisor

Mining Maintenance

13-Jul-22

516

20255

SO2 Disperstion and Consequence Modelling

This SO2 dispersion modelling will focus on :

1. Normal SO2 released from all the four sources in the normal operating condition

2. Massive i.e. potentially catastrophic releases of SO2 due to system failures and which may result in potential multiple fatalities (if any) either within the plant area and / or extending in the surrounding communities. The potential situations, which can trigger a massive release of SO2 in the current arrangement of the roaster, Leach and FAM Tanks

• Acid plants complex, are listed below. The modelling outputs should be superimposed on clear goggle images of the plant area and the surrounding residential areas, to enable development of critical controls and / or mitigation measures, for situations which will be determined to be potentially catastrophic – which may result in fatalities.

Mining Maintenance

13-Jul-22

517

20256

KTC Conveyor Splicing

Supply qualified team (1 supervisor, 2 team leaders, 1 QA/QC technician, safety

Officer, qualified labors) and special tools (splicing materials, vulcanizing press, consumables, …) to perform tasks below:

1. Cold splicing

2. Mechanical joint (super screw and clips)

3. Hot splicing

4. Belt inserting (pull in and pull out)

5. Belt repair (patches)

6. Belts splices inspections

7. Shutdown corrections

8. Housekeeping after work completed

Mining Maintenance

12-Jul-22

518

20257

KTC_ Wear system install

2 years support to install and maintain all lining systems at KTC for launders, pumpbxoes and tanks and support pipeline repairs but rubber or ceramic lining pipe as needed, allowance also made to setup an onsite workshop to support this maintenance work

Mining Maintenance

12-Jul-22

519

20258

KTO FRAGMENTATION NEW 20X50 CORE SHED

This scope of works describes the requirements for the concrete works construction and structural steel works required for the installation of the new 20X50 core shed  bis.

Construction work

12-Jul-22

520

20260

KTO INTERVENTION NEW 20X30 CORE SHED

This scope of works describes the requirements for the concrete works construction and structural steel works required for the installation of the new 20X30 core shed bis.

Construction work

12-Jul-22

521

20247

ATF 3 - Civil Infill Slabs

1. Acid Tank Farm 3

1.1 Earthworks Construction Phase:

• Backfill and compact to 95% Mod AASHTO as required up to 300mm below NGLV for foundations, bases, trenches and surface beds, etc. and use for backfilling or embankment.

• HDPE 1.5-micron liner to be placed on surface bed and gully areas and welded at all 150 mm overlaps.

1.2 Concrete, Formwork and Reinforcement:

• Rough formwork to sides of concrete surfaces.

• High Tensile Welded Mesh, Install type reference 395

• High Tensile Reinforcing Steel. Cut, bend and install in all diameters.

• Concrete 30MPa/10 -15mm high density. Reinforced concrete in bases, trenches, plinths, surface beds, and columns, etc.

• Unformed Surface Finishes. wood floated finish to horizontal concrete floor surfaces bed.

• Isolation and Saw cut joint as per drawing

• Concrete cover to me absolute minimum of 50 mm to a max of 75 mm.

• Concrete must be poured/placed as monogamous pours between movement joints. No construction joints will be allowed other than surface bed and wall/bases. All cold joint needs to be thoroughly scabbled and clean of latent before new concrete is placed.

• Install and cast-in threaded holding down bolts, including box out formwork, levelling and surveying, etc. in the following sizes:

o M12 (B12)

o M16 (B16)

o M20 (B20)

Mining Maintenance

11-Jul-22

522

20251

Sulfur Storage Warehouse - Earthworks 2

This Scope of Services under this Contract include, but not limited to the following:

• Bulk earthworks including excavation, disposal, importing, backfilling and compaction of gravel material

• Construction of a flexible road (Asphalt surfacing) around the new warehouse to allow traffic of delivery and supply trucks.

• The contractor will be required remove containers and temporary structures currently on site and to demolish some existing raft foundations and remove any other materials that can be found site.

Mining Maintenance

11-Jul-22

523

20253

FIRE SUPPRESSION DRYERS AND ROASTER

The contractor is to propose the best possible detection and quenching systems.

Summarizing the contractor must supply the following information.

• Propose the most cost-effective detection system

• Each detection panel is to have a potentially free alarm contact and a discharged contact to be used by others for centralizing the detection system

• The contractor is to provide a bi-annual service agreement of the substations in question and due to this the contract will preferentially be given to DRC based companies. Please note that the service agreement will only come into effect 6 months after the completion of this contract and does not form part of this tender. However, the successful company must provide evidence that they will be able to do such service in the DRC

 

First scope of work entails the following:

• Design complete fire detection and quenching circuits

• Install detection panels

• Install detectors

• Install complete automatic quenching system

• Housekeeping

The areas concerned are those listed below:

1. Dryers

2. 2. Filters press hydraulic unit

3. 3. Pumps in container

Second scope of work entails the following:

• Provide and install the box with hose reel

• Housekeeping

 The area concerned:

4. Roasters

Mining Maintenance

11-Jul-22

Si vous souhaitez postuler pour que votre entreprise soit invitée pour des travaux futurs similaires, veuillez soumettre votre profil d'entreprise au format PDF à tenders@kamotocoppercompany.com avec la description de l'offre qui vous intéresse comme sujet. Veuillez noter qu'un grand nombre d'e-mails sont envoyés à cette adresse et que seules les candidatures retenues seront incluses dans les offres. Veuillez noter que la liste est mise à jour régulièrement, mais qu'elle n'est pas en ligne et qu'elle peut ne pas contenir toutes les offres connexes publiées.